Topic/Matter Intersection

Topic:"Asset Retirement Obligation" in M12371

Matter: Nova Scotia Power Inc. - CI C0061005 – POA Cell Capping 2025 – $2,530,405
3 passages 1 document

Asset Retirement Obligation across all matters →

N-2NSPI (NSEB) RIRs 1-11 3 passages
1 Request IR-1: p. p. 3
1 Request IR-1: 2 3 The application notes the following related CIs pursuant to Section 11.2 of the Capital 4 Expenditure Justification Criteria (CEJC): 5 6 • 2023 C0052498 POA - Ash Cell Capping 2023 - $3,698,493 7 • 2026 TBD POA Ash Cell...

AI summary The text discusses the status of an ash cell capping project (C0052498) and future capping requirements for the Point Aconi Residue Management Site. It also references an approved industrial permit for the Point Aconi Generating Station issued by the NS Department of Environment and Climate Change.

6.9.3 Excavation Sampling p. p. 165
6.9.3 Excavation Sampling During excavation, samples are to be taken from every truck load of ash removed from the site. These samples are to be representative of truck loads and the area of the landfill from which the loads originate. As...

AI summary During excavation, samples are taken from every truck load of ash removed from the site to ensure representative sampling. Moisture testing is conducted to determine the required preshipping processing, and ash is treated to meet water and carbon content specifications. GPS is used to record excavation and sample locations.

p. p. 184
1 Request IR-4: 11 data required to fully respond to the foregoing question is not expected to be recovered. 1 Request IR-11: 2 3 Assuming the project is approved by the Board and the full project cost is included in NS 4 Power's rate base...

AI summary The document discusses a request (IR-11) regarding the transfer of a remaining net book value of approximately $2.28 million to the DDA upon the retirement of the POA generating facility in December 2029. NS Power provides a forecasted figure for this transfer.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →