N-1Application - CI C0067183 - TUC Wharf Access Bridge Replacement - Redacted 2 passages
Note 2: Small differences in totals are attributable to rounding. p. p. 5
r>Sub-Tota $ 39 Other Goods & Services Contingency % 15% $ 1,940,332 $ 291,050 Sub-Tota $ 291,050 Interest Capitalized AFUDC lot 1 $ 35,448 $ 35,448 Sub-Tota $ 35,448

AI summary The text presents a table with financial figures related to capital expenditures, including contingency costs, interest capitalized, and AFUDC. The figures are rounded, and the totals are noted to have minor discrepancies due to rounding.

REDACTED CI C0067183 Attachment 1 Page 3 of 80 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 5
REDACTED CI C0067183 Attachment 1 Page 3 of 80 REDACTED (CONFIDENTIAL INFORMATION REMOVED) File No: 241188 of 1.05 and 1.1 were used for the steel and timber components respectively based on CSA S6- 19 Section 14. Component Dead Load (kN)...

AI summary The document outlines the structural calculations and assumptions for a wharf, including dead loads, telehandler specifications, personnel weight, and HFO pipe weight. It also describes the condition of structural components based on inspection reports and load factors applied for safety.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →