Matter: Nova Scotia Power Inc. - 2026 General Rate Application (GRA)
5 passages 4 documents

Biomass Chp across all matters →

N-62026-2027 GRA Appendix 7A-E - Redacted 1 passage
Biomass p. p. 30
Biomass (in Thousands of $) 534750 Personal Equipment 35 7 30 31 (4) 23 1 535100 Other Goods & Services 4 10 0 0 (4) (10) 0 Total Non-Labour 2,933 2,454 2,561 2,528 (372) 107 (33) Responsibility Area 2025 2026 2027 2024 2024 Power Producti...

AI summary The document presents a financial overview of biomass operations, including budget forecasts and actual costs for the Biomass Generating Station in Port Hawkesbury. It outlines variances between different years, such as labour increases due to salary escalations and changes in operational requirements.

N-132026-2027 GRA OE-01-13 - Redacted 2 passages
A-14 PORT HAWKESBURY BIOMASS PLANT EFFICENCY CALCULATION p. p. 65
A-14 PORT HAWKESBURY BIOMASS PLANT EFFICENCY CALCULATION (Confidential and Non-Confidential Versions) Summary of five years of efficiency data for the Post Hawkesbury Biomass Unit, including annual Process Efficiency

AI summary The document provides a summary of five years of efficiency data for the Port Hawkesbury Biomass Unit, including annual process efficiency metrics. This information is presented in both confidential and non-confidential versions.

Preamble p. p. 152
The overall Port Hawkesbury Biomass plant process efficiency is defined as the total electricity generation plus the useful thermal energy divided by the biomass input heat energy. The efficiency level of the process is variable and depend...

AI summary The Port Hawkesbury Biomass plant's process efficiency is calculated based on total electricity generation and useful thermal energy relative to biomass input heat energy. Efficiency varies due to factors like fuel quality, boiler capacity usage, and the paper mill's operational profile, with annual changes noted in reports.

N-142026-2027 GRA OP 01-15 - Redacted 1 passage
TECHNICAL SPECIFICATIONS FOR BIOMASS p. p. 14
TECHNICAL SPECIFICATIONS FOR BIOMASS Biomass Fuel shall be delivered as chips or hogged material commuted to a nominal size of thirty-five (35) to thirty-seven (37) millimetres or smaller and shall not contain pieces greater than one hundr...

AI summary The technical specifications for biomass fuel require it to be delivered in specific size ranges, free of extraneous materials, and composed of untreated wood. Moisture content varies depending on the source and season. NSPI will notify suppliers if extraneous materials are found and may seek reimbursement for removal costs.

N-92Compliance Filing - Standardized Filings - Redacted 1 passage
Section 1038
6-2027 GRA Compliance Filing - SR-01 Attachment 5 Page 8 of 12 Biomass Calculations ($ in millions) 2026 Capital Fuel Operating Total 54.0 100.0% Data from M05473 Exhibit N-3 CA IR-065P Confidential from the COSS Proceeding REDACTED (CONFI...

AI summary The document provides biomass-related calculations for 2026, including capital, fuel, and operating costs totaling $54 million. It also includes data on the annual peak and energy requirement of the Atlantic Transmission Line (ATL), as well as the system coincident load factor of 54.75%.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →