HomeBiomass ChpM12742Evidence
Topic/Matter Intersection

Topic:"Biomass Chp" in M12742

Matter: Nova Scotia Power Inc. - 2025 Annual FAM Report  (Fuel Adjustment Mechanism)
2 passages 2 documents

Biomass Chp across all matters →

N-1Annual FAM Report 2025 - Redacted 1 passage
(ii) Primary Forest Biomass p. p. 2
(ii) Primary Forest Biomass - a) Primary Sawmill chips: - 1) Nov to April: 30 day rolling average of 55% or less, maximum of 65% - 2) May to Oct: 30 day rolling average of 52% or less, maximum of 60% - b) Primary Fuel log chips: - 1) Nov t...

AI summary The document outlines operational parameters for primary forest biomass, specifying monthly thresholds for sawmill chips, fuel log chips, and forest fuel chips during Nov-April and May-Oct, with varying 30-day rolling average and maximum percentage limits.

N-2NSPI (NESB) RIR 1 to 17 - Redacted 1 passage
Fuel Specifications Summary - Biomass p. p. 3
Fuel Specifications Summary - Biomass Biomass Fuel shall be delivered as chips or hogged material comminuted to a nominal size target of thirtyfive (35) to thirty-seven (37) millimeters or smaller, and ideally not contain pieces greater th...

AI summary Biomass fuel specifications mandate chips or hogged material sized 35-37mm, free from contaminants like metal and plastic, and composed of untreated wood. Moisture content requirements are outlined but unspecified in the provided text.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →