Matter: EfficiencyOne - 2025 Q2 Demand Side Management (DSM) Report
5 passages 2 documents

BNI Demand Response across all matters →

E-1Report 3 passages
Preamble p. p. 10
5 The New Home Construction program component of the New Residential program ended on December 31, 2023. The wind-up of the program 6 component was outlined in E1's 2023-2025 DSM Plan 7 Affordable Single-family Homes and Mi'kmaw Home Energ...

AI summary The New Home Construction program component of the New Residential program ended on December 31, 2023. Participation in the DSM Plan includes various subsets such as Affordable Single-family Homes and Mi'kmaw Home Energy Efficiency Project Appliance Replacements. Participation metrics are defined differently for Residential Behaviour, Demand Response, and BNI Demand Response, with specific counting methods for facilities and households.

DEMAND RESPONSE (2025) p. p. 25
DEMAND RESPONSE (2025) • The BNI Demand Response program component aims to help facilitate more flexible non-residential load by providing customers with economic incentives and/or more visibility and control of their loads. In addition to...

AI summary The BNI Demand Response program aims to enhance non-residential load flexibility through incentives and load control. E1 is exploring new pathways, including standalone battery control and battery-solar PV integration, for BNI customers.

BNI Demand Response Highlights p. p. 25
BNI Demand Response Highlights - The BNI Demand Response program component achieved 6.6 MW during the 2024/2025 season (December 1, 2024 to February 28, 2025) through the Commercial and Industrial Aggregator pathway, with those results sti...

AI summary The BNI Demand Response program achieved 6.6 MW during the 2024/2025 season through the Commercial and Industrial Aggregator pathway, but results fell short of the 2025 Plan target. Eight events were called by NS Power, with factors like participant opt-outs and an unfavorable mix of morning and evening events contributing to lower capacity.

E-2E1 (NSEB) RIR 1 to 3 2 passages
BNI Demand Response results p. p. 0
BNI Demand Response results The 2023-2025 DSM Plan modelled five BNI Demand Response pathways and E1 focused on implementing one – the Commercial & Industrial Curtailment (Aggregator) – over the past three years, as it represented the vast...

AI summary E1 implemented the Commercial & Industrial Curtailment (Aggregator) pathway under the BNI Demand Response program, exceeding participation targets but falling short on capacity due to event timing, opt-outs, and short notice periods. Four other pathways remain unimplemented but could drive 92% of future participation.

Development of the 2027-2031 DSM Plan p. pp. 0-7
Development of the 2027-2031 DSM Plan The results and learnings from E1's first three years of operating a Demand Response program have informed where E1 plans to focus its attention during the five-year 2027- 2031 DSM Plan. The pathways w...

AI summary The 2027-2031 DSM Plan will focus on pathways with the highest growth potential, such as smart thermostats and domestic hot water controllers for residential demand response, and the BNI Demand Response aggregator pathway. The plan will not include previously unmodelled pathways like behavioural demand response. Despite lower participation and capacity performance, investment remains near planned levels due to program cost structures and foundational activities.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →