5 The New Home Construction program component of the New Residential program ended on December 31, 2023. The wind-up of the program 6 component was outlined in E1's 2023-2025 DSM Plan 7 Affordable Single-family Homes and Mi'kmaw Home Energ...
AI summary The New Home Construction program component of the New Residential program ended on December 31, 2023. Participation in the DSM Plan includes various subsets such as Affordable Single-family Homes and Mi'kmaw Home Energy Efficiency Project Appliance Replacements. Participation metrics are defined differently for Residential Behaviour, Demand Response, and BNI Demand Response, with specific counting methods for facilities and households.
DEMAND RESPONSE (2025) • The BNI Demand Response program component aims to help facilitate more flexible non-residential load by providing customers with economic incentives and/or more visibility and control of their loads. In addition to...
AI summary The BNI Demand Response program aims to enhance non-residential load flexibility through incentives and load control. E1 is exploring new pathways, including standalone battery control and battery-solar PV integration, for BNI customers.
BNI Demand Response Highlights - The BNI Demand Response program component achieved 6.6 MW during the 2024/2025 season (December 1, 2024 to February 28, 2025) through the Commercial and Industrial Aggregator pathway, with those results sti...
AI summary The BNI Demand Response program achieved 6.6 MW during the 2024/2025 season through the Commercial and Industrial Aggregator pathway, but results fell short of the 2025 Plan target. Eight events were called by NS Power, with factors like participant opt-outs and an unfavorable mix of morning and evening events contributing to lower capacity.