Topic/Matter Intersection

Topic:"Building Optimization Service" in M09096

Matter: Approval of a Supply Agreement for Electricity Efficiency and Conservation Activities between EfficiencyOne (E1) and Nova Scotia Power Inc.(NS Power), the establishment of a final agreement between the parties, and approval of a 2020-2022 Demand Side Management (DSM) Resource Plan
19 passages 4 documents

Building Optimization Service across all matters →

E-3E1 (NSPI) RIRs to IR-1 to IR-69 1 passage
Section 1876
AUX Y1 Y2 G RP P AP Y1-Y2 W-E Blower Speed Bacnet (Optional) A Bacnet control option is available for interface with the Comfort Plus Commercial systems. This device is easily integrated into most building automation systems to provide bui...

AI summary The text discusses the Bacnet control option available for integration with Comfort Plus Commercial systems, allowing real-time monitoring, thermostat control, and remote configuration. This integration provides building managers with visibility and control over heating system operations.

E-42018 DSM Annual Progress Report 1 passage
Attachment 1, Page 15 of 30 p. p. 51
Attachment 1, Page 15 of 30 Recommendation Text Source Status Comments Expected Period of Completion Establish clear objectives for Building Optimization. The Building Optimization projects reviewed this ye

AI summary The text recommends establishing clear objectives for Building Optimization projects, indicating a need for structured goals in energy efficiency initiatives. It highlights the importance of defining success criteria for these projects.

E-52018 DSM Evaluation Reports 15 passages
p. pp. 49-50
Type Number of single doors Have the doors been placed in the correct wall section/location? Windows in doors (orientation, type)? Double doors or door assemblies (rough opening measurements)? Was the buffering effect added appropriately?...

AI summary The text presents a table with questions related to building construction and energy efficiency, focusing on door placement, window orientation, foundation modeling, and wall configurations. It includes criteria for assessing the significance of errors in these areas.

2. Building Heating/Cooling System Description p. p. 190
2. Building Heating/Cooling System Description Heating system 1 Heating system 2 Heat source % of heat Type of system Heating Systems: Please fill the table below for each heating system at the site

AI summary The section provides a template for describing building heating and cooling systems, requesting details such as heat source, percentage of heat, and type of system for each heating system at the site.

Building Optimization p. pp. 89-90
Building Optimization In 2018, six projects were completed through Building Optimization service. The 2018 evaluation included a review of three of those projects for which both a project file review and an on-site visit was conducted. Sim...

AI summary In 2018, six Building Optimization projects were completed, with three reviewed through on-site visits and project file reviews. Participant satisfaction was high, but energy savings were reduced by 39% and peak demand savings by 22% due to engineering errors. The net electrical energy savings were 1.184 GWh, avoiding 725 tonnes of CO2 eq in annual GHG emissions.

1.1 Description p. pp. 102-103
1.1 Description Custom provides large BNI participants with technical assistance, financial incentives and project financing to help reduce their electricity consumption and demand. Custom includes three different services, broken down as...

AI summary Custom offers three services—Retrofit, New Construction, and Building Optimization—to help large BNI participants reduce electricity consumption. Retrofit supports feasibility studies and improvements at facilities consuming over 350,000 kWh annually. New Construction provides incentives for energy-efficient new buildings or renovations. Building Optimization focuses on optimizing building systems for energy savings. In 2018, these services aimed to generate 25.8 GWh of energy savings and 4.5 MW of peak demand savings.

Preamble p. pp. 103-104
ENS started implementing recommendation 2017 Custom-R2 by developing a quality assurance (QA) procedure to ensure that key variables are consistently reviewed in the energy models and by contracting an experienced energy modeller to review...

AI summary ENS has been implementing several recommendations to improve the Building Optimization program. This includes developing a QA procedure, updating program documents, and creating requirements for service providers. These changes aim to ensure consistent reviews and clearer eligibility criteria for participants.

Building Optimization p. pp. 106-108
Building Optimization A total of six Building Optimization projects reported savings in 2018 and all of them were completed in the same year. As depicted in Figure 6 below, after undergoing a decreasing savings trend for the past three yea...

AI summary In 2018, six Building Optimization projects reported energy savings, with an increase in savings per project due to a multi-building project that grouped ten buildings. The program was temporarily halted in 2016 for restructuring and branding changes, which had a modest impact on participation.

7 BUILDING OPTIMIZATION MARKET EVALUATION p. pp. 130-131
7 BUILDING OPTIMIZATION MARKET EVALUATION As part of the Building Optimization on-site visits, three participants answered questions regarding their satisfaction with the service, any barriers they encountered, and improvement suggestions....

AI summary Participants in the Building Optimization program expressed high satisfaction with the service, citing streamlined processes and energy savings. No significant barriers were reported, and the only suggestion for improvement was accelerating the payment process.

8 BUILDING OPTIMIZATION IMPACT EVALUATION p. p. 131
8 BUILDING OPTIMIZATION IMPACT EVALUATION The objective of the 2018 Building Optimization impact evaluation was to establish the gross and net electrical energy and peak demand savings. Building Optimization claims three types of savings:...

AI summary The 2018 Building Optimization impact evaluation aimed to assess electrical energy and peak demand savings. The evaluation found no partial savings, six completed projects with final savings, and no final savings from multi-year projects.

8.1 Gross Savings p. p. 131
8.1 Gross Savings Gross savings correspond to changes in energy consumption resulting from actions taken by Building Optimization participants regardless of why they participated.10 This section describes the review methodology used for al...

AI summary Gross savings are defined as changes in energy consumption from Building Optimization participant actions, regardless of participation reasons. The section outlines the review methodology and adjustments for Building Optimization projects.

8.1.1 Project Review Findings p. pp. 131-132
8.1.1 Project Review Findings Three projects were included in the review sample from the six custom building optimization projects completed in 2018. Downward adjustments were made to the energy and demand savings of all three projects. Th...

AI summary Three building optimization projects reviewed in 2018 had their energy and demand savings adjusted downward due to incorrect engineering equations, not due to unimplemented measures. Adjustments led to a 39% reduction in savings for the three projects and a 30% reduction overall for Building Optimization.

8.1.2 Interactive Effects p. p. 132
8.1.2 Interactive Effects Since interactive effects vary significantly from one Building Optimization project to another, they are taken into account in the project engineering calculations used to establish initial gross savings. No other...

AI summary Interactive effects in Building Optimization projects are considered in engineering calculations for initial gross savings, but no additional adjustments were made to the gross savings of the three reviewed projects.

APPENDIX III CUSTOM: BUILDING OPTIMIZATION ON-SITE VISIT PROTOCOL p. p. 195
APPENDIX III CUSTOM: BUILDING OPTIMIZATION ON-SITE VISIT PROTOCOL This appendix describes the protocol used as part of the Building Optimization on-site visits.

AI summary This appendix outlines the protocol for conducting on-site visits as part of the Building Optimization program, ensuring standardized procedures for assessments and evaluations.

p. pp. 198-199
To be filled out prior to visit and validated on-site • • • To be filled out prior to visit and validated on- site Notes: Number of Systems Commissioned in Pr Building Equipped w rith Central Automatio on System: New Controls Added 1? Func...

AI summary The document contains a form to be filled out prior to a visit and validated on-site, related to building systems and automation. It includes sections for noting the number of systems, building equipment with central automation, new controls added, and details about equipment type and location.

Satisfaction Questions p. p. 1
Satisfaction Questions - S1. Using a scale from 1 to 10 where 1 is "not at all satisfied" and 10 is "completely satisfied" how would you rate your satisfaction with the Building Optimization program overall? - S2. [IF S1<8] What is the mos...

AI summary The document presents a set of satisfaction questions related to the Building Optimization program. Questions focus on participant satisfaction, challenges faced, and suggestions for improvement. Topics include program participation, marketing, and interactions with Energy Efficiency Nova Scotia (ENS) staff.

1 Improve communication to SPs and participants about the various New Construction steps and corresponding service requirements. As previously mentioned, the key aspect of New Construction men p. p. 16
5 Establish clear objectives for Building Optimization. The Building Optimization projects reviewed this year differed widely in scope. Some projects involved detailed investigative work to tap into deep energy savings, while others were l...

AI summary The text discusses the need to establish clear objectives for Building Optimization projects, noting that projects reviewed this year varied significantly in scope, from detailed investigative work for deep energy savings to simple repairs of malfunctioning equipment.

E-17E1 (SBA) RIR-1 to RIR-49 2 passages
7.2 BNI Building Envelope p. p. 108
7.2 BNI Building Envelope This section provides details of the commercial building shell measures present at the on‐site surveyed commercial buildings envelope types. Figure 75 Figure 75 summarizes the key findings of building shell proper...

AI summary This section discusses the building envelope characteristics of commercial buildings, emphasizing how envelope properties interact with heating and cooling systems. Improving insulation and reducing infiltration can allow for the use of more efficient mechanical equipment.

82. Comments: p. p. 235
82. Comments: NA VIGANT ENSC Commercial Baseline Survey Site II formlO 10. Building Specifications (cont'd) Windows/Fenestration Note: 80M!ine windows are 2-f)ane, clear Rlaze Ct C2 CJ 83. Layers of glazing 84. Type of glaz ing C • Cic11r...

AI summary The document contains a section of a commercial baseline survey, focusing on building specifications such as windows, fenestration, and wall construction. It includes details about glazing features, window frame types, shading, and external wall types. The data is organized in a tabular format with multiple entries for different sections of the building.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →