E-2(r)Revised ENSC Evidence 1 passage
# Project Title started based on st Bottom Up estimate based on statistical energy analysis ed INITIAL F estimate p. p. 195
# Project Title started based on st Bottom Up estimate based on statistical energy analysis ed INITIAL F estimate GWh MW GWh MW 1 Upgrade Line 1 Refiner 2010 53.4 6.1 63.9 7.3 2 Optimize Line 3 Production Mid 2009 50.6 C 0 9.8 1.1 3 Optimi...

AI summary The table outlines various energy projects with their start dates, energy savings in GWh and MW, and initial estimates. It includes projects like upgrading Line 1 Refiner and optimizing production, with a note that some projects were not completed.

E-7ENSC (Avon) Responses to IR-1 to IR-27 (REDACTED) 1 passage
23 c) The potential loss of significant load would be reflected in NSPI's avoided costs. Please 24 refer to Multeese IR-6 and Synapse IR-14.
23 c) The potential loss of significant load would be reflected in NSPI's avoided costs. Please 24 refer to Multeese IR-6 and Synapse IR-14. 1 Request IR-17: 2 3 Reference: 4.4 Capacity Building Programs (Appendix A, pp. 27-28) 4 5 a) Plea...

AI summary The text discusses the potential loss of significant load and its reflection in NSPI's avoided costs, referencing Multeese IR-6 and Synapse IR-14. It also requests detailed information on training and associated expenses for capacity building programs for trade allies, specifically from ENSC in 2011 and 2012.

E-7(r)ENSC (Avon) Responses to IR-1 to IR-27 (REVISED) (REDACTED) 1 passage
1 Request IR-13:
1 Request IR-13: 2 Reference: ENSC Evidence, p.23, lines 4-5, states that "...[C]onservation and energy efficiency [are] a lower-cost alternative to new supply". 5 6 a) What assumptions were made about NSPI's need for new supply? 7 8 b) Wh...

AI summary Request IR-13 asks about assumptions regarding NSPI's need for new supply and its forecast reserve margin from 2012 to 2017. The response directs to a table showing supply-side additions under DSM and No DSM scenarios and provides reserve margin data indicating it met the minimum requirement of 20%.

E-14ENSC (Avon) Responses to IR-28 to IR-38 (REDACTED) 1 passage
NON-CONFIDENTIAL
NON-CONFIDENTIAL 1 Request IR-28: The individual Plans are not separated out by energy and capacity costs. Rather, a portion of the total cost difference between the Plans is attributed to avoided capacity based on the 280 MW natural gas c...

AI summary The text discusses the calculation of avoided capacity costs in the context of energy and capacity planning, referencing a specific natural gas combined cycle unit added in 2022 and the use of the Strategist tool for estimating these costs. A 20% increment is applied for reserve margin requirements.

E-24Avon (Drazen) Evidence (Redacted) 1 passage
Section 20 p. p. 0
2006 Conservation and Energy Efficiency Plan, Page 37. 2008-2010: 2010 Application Exhibit N-7( c) Response to Multeese IR-8. 2011: 2011 DSM Evidence of NSPI, Page 12. 2012: 2011 Application, Response to Multeese IR-2(b). 2013: Derived fro...

AI summary The text discusses the impact of assumptions about new capacity additions on capacity cost and long-run levelized cost, noting that NSPI does not anticipate needing new capacity through 2017, with avoided energy costs being the primary consideration. Variability in calculated energy costs from 2012 to 2017 is highlighted.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →