# Project Title started based on st Bottom Up estimate based on statistical energy analysis ed INITIAL F estimate GWh MW GWh MW 1 Upgrade Line 1 Refiner 2010 53.4 6.1 63.9 7.3 2 Optimize Line 3 Production Mid 2009 50.6 C 0 9.8 1.1 3 Optimi...
AI summary The table outlines various energy projects with their start dates, energy savings in GWh and MW, and initial estimates. It includes projects like upgrading Line 1 Refiner and optimizing production, with a note that some projects were not completed.