N-1-aNotice of Application and Direct Evidence - NSPI - REDACTED (Large File - 59 MB) 3 passages
Preamble
Appendix C – Operating Maintenance and General Expense 5 Year Forecast Appendix D – Credit Rating Reports Appendix E - Dr. Roger A. Morin Exhibits Appendix F – Load Forecast Report Appendix G - Cost of Service Study Appendix H - Proposed T...

AI summary The document outlines various appendices related to a regulatory proceeding, including operating maintenance forecasts, credit rating reports, load forecasts, cost of service studies, proposed tariffs, and regulation changes.

27 2.4.2 Fuels Forecast
27 2.4.2 Fuels Forecast 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 28 29 30 Fuel costs include the cost of solid fuels, oil, natural gas and purchased power, offset by the net proceeds from export energy sales and...

AI summary The document discusses NSPI's 2007 fuel forecast, including an increase in net electricity demand and associated fuel costs. It notes that 90% of NSPI's generation will come from fossil fuels and mentions compliance with an annual sulphur dioxide emission cap. The recent credit downgrade by S&P is not factored into 2007 costs, but may impact long-term fuel procurement.

5 7.5.1 System Peak
5 7.5.1 System Peak 6 7 8 9 10 System peak is defined as the highest single hourly average demand experienced in a calendar year. It includes both firm and interruptible load. The system peak forecast is used for operations and generation...

AI summary System peak is defined as the highest single hourly average demand in a calendar year, used for operations, generation planning, and cost allocation. Forecasting involves predicting customer behavior and weather effects. Net System Peak is expected to grow from 2,143 MW in 2005 to 2,639 MW in 2015. Actual peaks in 2005 and 2006 were lower than forecasts due to milder temperatures and industrial shutdowns.

N-1-aAppendix G - Cost of Service Study - REDACTED (Large File - 14 MB) 1 passage
1.1 Overview
1.1 Overview The overall objective of a cost of service analysis is to determine the costs associated with serving each class of customer, and to identify any inter-class inequities that may be present with regard to over or under contribu...

AI summary The text outlines the objectives and methodology of a Cost of Service Study (COSS). The primary goal is to determine the costs associated with each customer class and identify inter-class inequities based on revenue/cost ratios. It details the process of accumulating financial and operating data, allocating costs (including operating expenses, depreciation, and taxes) based on direct assignment or functional responsibility (production, transmission, distribution, and retail), and categorizing costs into demand, energy, customer, and revenue components.

N-1-aAppendix H - Proposed Tariffs (Large File - 21 MB) 2 passages
Annual Base Load Energy at 85% Capacity Factor:
Annual Base Load Energy at 85% Capacity Factor: Annual Base Load Energy at 85% Capacity Factor= Net Operating Capability of Base Load Units x 0.85 x 8,760 hours APPROVED: NOV A SCOTIA UTILITY AND REVIEW BOARD EFFECTIVE: JANUARY 1, 2006

AI summary The document defines the formula for calculating 'Annual Base Load Energy at 85% Capacity Factor' for Nova Scotia Utility and Review Board purposes. The calculation is derived by multiplying the Net Operating Capability of Base Load Units by 0.85 and by 8,760 hours. This definition was approved and became effective on January 1, 2006.

17. Conversion of Interruptible Load to Firm:
17. Conversion of Interruptible Load to Firm: Should any customer under this rate desire to be served under any applicable firm service rate, a five (5) year advance written notice must be given to the company so as to ensure adequate capa...

AI summary This section outlines the procedures and requirements for customers wishing to convert from interruptible load to firm service. Customers must provide five years of advance written notice to ensure capacity availability, though the company may allow earlier conversion. Conversely, customers wishing to revert from firm to interruptible service must remain on the firm rate for at least two years, with the company retaining the right to permit an earlier transition.

N-2-aRIRs 1 to 39 - NSUARB to NSPI - REDACTED (Large File - 19 MB) 1 passage
Response IR-4: (cont'd)
Response IR-4: (cont'd) Other Maintenance schedule changes $1.2 Capacity factor changes $5.4 Reduced hydro $0.5 Increased post 2001 IPP ($0.4) Reduced exports ($1.5) Other items ($2.9) $2.4 Confidential Attachment 1 provides the informatio...

AI summary The document outlines various financial adjustments related to maintenance schedules, capacity factors, hydro production, and exports, resulting in a net change of $2.4 million. Confidential Attachment 1 supports the $24.7 million increase in HFO pricing.

N-2-bRIRs 70 to 75 - NSUARB to NSPI - REDACTED (Large File - 33 MB) 2 passages
Response IR-73:
Response IR-73: a. Wind energy is a variable resource. In Nova Scotia, the current installed wind generation has generally achieved approximately a 30 percent capacity factor, compared to nameplate rating. NSPI has used these results in th...

AI summary The response discusses wind energy's variable nature in Nova Scotia, noting a 30% capacity factor for current wind generation. NSPI has used this data in a Cost of Service Study to allocate 30% of wind assets to demand and the remainder to energy.

Adjustment Clauses
Adjustment Clauses Below is a list of utilities whose rates include adjustment clauses that may cause fluctuations in the price of electricity even though base rates have not been adjusted. Boston Edison, MA Demand-Side Management Charge E...

AI summary The text lists various utilities and their adjustment clauses that can cause electricity price fluctuations. These include charges related to energy efficiency, renewable energy, decommissioning, and tax adjustments across multiple jurisdictions.

N-2-bRIRs 77 to 84 - NSUARB to NSPI - REDACTED (Large File - 35 MB) 1 passage
Capacity
Capacity To ensure reliability of service, NSPI maintains a generating capacity greater than firm peak demand. The total company-owned generation capacity to 2,293 MW, which is supplemented by 57 megawatts in service contracted with indepe...

AI summary Nova Scotia Power Inc. (NSPI) manages a generating capacity of 2,293 MW, supplemented by 57 MW of contracted capacity, to ensure service reliability and meet regional planning criteria. The company emphasizes maximizing capacity utilization to improve operating efficiency and defer capital investment. Key strategies include maintaining high asset availability through planned maintenance, managing interruptible loads, and optimizing export sales. NSPI reported a capacity utilization of 78% in 2005, a slight decrease from 2004 due to scheduled turbine inspections.

N-2-bRIR 76 - NSUARB to NSPI - REDACTED (Large File - 46 MB) 2 passages
Capacity
Capacity To ensure reliability of service, NSPI maintains a generating capacity greater than firm peak demand. The total companyowned generation capacity is 2,293 MW, wh ich is supplemented by 57 megawatts in service contracted with indepe...

AI summary Nova Scotia Power Inc. (NSPI) manages a total generating capacity of 2,293 MW plus 57 MW of contracted capacity to ensure service reliability. The company emphasizes maximizing capacity utilization to improve operating efficiency and defer capital investments. Strategies for optimization include maintaining high plant availability, managing interruptible loads to shift demand from peak to off-peak periods, and optimizing export sales. NSPI reports high performance in capacity-related indicators, ranking among the top units in Canada.

DEPRECIATION
DEPRECIATION Depreciation expense increased by $0.1 million in Q4, 2005 compared to Q4, 2005; increased $1.5 mill ion in 2005 relative to 2004; and increased $1.3 mill ion in 2004 relative to 2003, due principally to the effect of plant ad...

AI summary The text outlines the historical trends of depreciation expense, noting an increase of $0.1 million in Q4 2005 compared to the previous quarter. Annual increases were recorded for 2005 ($1.5 million) and 2004 ($1.3 million) relative to the preceding years. These increases are primarily attributed to plant additions. Additionally, the results of the depreciation study conducted by Bangor Hydro Electric (BHE) in 2004 are incorporated into the reported figures.

N-2-cRIRs 1 to 66 - Avon to NSPI - REDACTED (Large File - 13 MB) 1 passage
Response IR-24: (cont'd)
Response IR-24: (cont'd) With the construction of the Point Tupper Marine Terminal, NSPI is now able to source both geared and gearless freight from the global market rather than relying on BSUs exclusively. The draft restriction was decre...

AI summary NSPI is leveraging the Point Tupper Marine Terminal to source freight from global markets, leading to increased draft and discharge rates. This has resulted in savings and the ability to purchase fuels from various international sources, though determining exact freight savings is complicated by combined pricing.

N-2-gRIRs 30 to 91 - SEB to NSPI - REDACTED (Large File - 29 MB) 1 passage
FOR THE YEAR ENDING DECEMBER 31, 2007
FOR THE YEAR ENDING DECEMBER 31, 2007 (1) TOTAL (2) (3) SMALL (4) (5) GENERAL (6) SMALL (7) MEDIUM (8) LARGE (9) EXTRA LI (10) (11) (12) ALLOCATION COMPANY DOMESTIC GENERAL GENERAL LARGE INDUSTRIAL INDUSTRIAL INDUSTRIAL INTERR 2 MUNICIPAL...

AI summary The document presents a detailed breakdown of various metrics, including demand, generation, and customer data, with percentages of responsibility across different categories and sizes. It includes tables with various factors and allocations, such as weighted totals and responsibility percentages, related to energy and utility management.

N-7-bRIRs 142 to 143 - SEB to NSPI - REDACTED (Large File - 45 MB) 2 passages
Operational Excellence
Operational Excellence - CEA ranks Point Tupper #1 and Lingan Unit 3 #2 on thermal operating performance - Operating excellence enables high utilization - Capacity managed with surgical capital additions and incentives to shift peak load

AI summary The document highlights the operational performance of specific assets, noting that the CEA ranks Point Tupper as #1 and Lingan Unit 3 as #2 for thermal operating performance. It emphasizes that operational excellence is a key driver for high utilization. Furthermore, it describes a strategy for managing capacity through targeted capital additions and the use of incentives to shift peak load.

Bear Swamp
Bear Swamp - Bear Swamp, Massachusetts - 600MW Pumped Storage Hydro - First investment in 50/50 partnership with Brookfield Power - Low risk merchant operation - Seeking to contract substantial portion of output - LICAP settlement adds val...

AI summary The text identifies the Bear Swamp project in Massachusetts as a 600MW Pumped Storage Hydro facility. It highlights that the project was the first investment in a 50/50 partnership with Brookfield Power. The project is characterized as a low-risk merchant operation, with the owners seeking to contract a substantial portion of its output. Additionally, the text notes that the LICAP settlement provides added value for the project's capacity.

N-16Review of NSPI's Fuel Costs on behalf of Avon Valley Greenhouses et al. (AVON) REDACTED (Large File - 38 MB) 1 passage
Section 107
Although the large Colombian mines are undergoing a significant capacity expansion, in the first half of 2006 exports form Colombian were down slightly from a year earlier. At the beginning of the year it had been forecasted that they woul...

AI summary Colombian mines are undergoing significant capacity expansions, but exports in the first half of 2006 were slightly down from the previous year. Companies like Xstrata, Glencore, and Drummond are expanding their operations, and the Colombian government is investing in new export infrastructure, including a terminal at Santa Marta Bay with a US$300 million capital cost.

N-40RIRs Attachment SEB-NSPI - 2d (Large File - 20 MB) 2 passages
Plus
Plus (B) Fuel costs related to purchased power (and applicable S02 emission allowances) such as those incurred in unit power and limited term power purchases where the fossil fuel costs and applicable S02 emission allowances associated wit...

AI summary The text defines specific fuel costs eligible for inclusion in the Fuel Tariff (FT). These include costs associated with purchased power (such as unit and limited-term power purchases) where fossil fuel costs and SO2 emission allowances are identifiable in billing statements. Additionally, it defines 'firm generation capacity purchases' as costs incurred to address capacity deficiencies or maintain reserve levels, specifically excluding reservation charges, option charges, and other capacity-related fees.

PLUS
PLUS (B) Fuel costs related to purchased power and applicable S02 emission allowances such as those incurred In unit power and limited term power purchases where the fossil fuel costs and applicable S02 emission allowances associated with...

AI summary The text defines the scope of 'PLUS' (Purchased Power and Limited-term power) fuel costs. It specifies that these costs include fuel and S02 emission allowances for power where such costs are identifiable and clearly stated on billing statements. Additionally, it defines 'firm generation capacity purchases' as costs incurred to address capacity deficiencies or maintain reserve levels, explicitly excluding specific reservation and option charges while including total delivered costs.

N-40RIRs Attachment SEB-NSPI - 2a, pt. 1 (Large File - 22 MB) 3 passages
SEASONAL CAPACITY
SEASONAL CAPACITY Additional capacity, hereinafter referred to as "seasonal capacity," can be supplied on a year-toyear basis during the billing months of October through May provided the Consumer gives a minimum of two months written noti...

AI summary The document defines 'seasonal capacity' as additional capacity provided on a year-to-year basis during the October through May billing months. To obtain this capacity, consumers must provide the Company with at least two months' written notice, subject to the Company's determination of availability. The Company reserves the right to suspend delivery during system emergencies and is not obligated to construct additional facilities to meet seasonal capacity demands.

TERM
TERM The customer shall contract for a de:furlte amount of electrical capacity in kilowatts which shall be sufficient to meet maximum requirements, but in no event shall the contract capacity be Jess than 1, 000 KW. Contracts will be reqll...

AI summary The text outlines the contractual terms for electrical capacity, specifying that customers must contract for a minimum of 1,000 KW to meet their maximum requirements. It establishes a minimum initial contract period of two years, with a one-year notice requirement for termination. Provisions are included for existing customers changing requirements and the Company's right to extend initial contract periods. Additionally, the Company is not obligated to supply capacity beyond the contracted amount without mutual agreement.

Where:
Where: F = Fuel cost per kilowatt-hour included in base rate, rounded to the nearest one ten-thousandth of a cent. E = Total Projected system Fuel costs: (A) Fuel consumed in the Utility's own plants and the Utility's share of fuel consume...

AI summary The text defines the components used to calculate the fuel cost per kilowatt-hour included in the base rate. It specifies that total projected system fuel costs consist of three components: (A) fuel consumed in the Utility's own or jointly owned plants, including fossil fuel costs and emission allowances; (B) fuel costs for purchased power like unit and limited-term purchases, including 'firm generation capacity purchases' to address capacity deficiencies; and (C) fuel costs for purchased power on an economic dispatch basis, including transmission charges and economy purchases.

N-40RIRs Attachment SEB-NSPI - 2a, pt. 4 (Large File - 19 MB) 3 passages
1. DURJNG A LEVEL 2 CAPACITY CURTAILMENT PERJOD
1. DURJNG A LEVEL 2 CAPACITY CURTAILMENT PERJOD For the maximum Curtailable Demand registered or computed by or from Company's metering facilities, during a Level 2 Capacity Curtailment Period, Customer's monthly bill will be increased sub...

AI summary The text outlines the billing structure for customers who have contracted to curtail demand during a Level 2 Capacity Curtailment Period. It specifies a tiered pricing model where the discount per kW increases by 10% for the second use and 20% for subsequent uses within a billing month. The calculation also accounts for the duration of the contract and the history of the customer's Curtailable Demand over the preceding 11 months, including provisions for credits and exclusions for Level 1 curtailment periods.

PLUS
PLUS (B) Fuel costs related to purchased power and applicable S02 emission allowances such as those incurred in unit power and limited term power purchases where the fossil fuel costs and applicable S02 emission allowances associated with...

AI summary The text defines the scope of 'PLUS' costs, specifically focusing on fuel costs associated with purchased power and SO2 emission allowances. It specifies that these costs must be identifiable in billing statements for unit and limited-term power purchases. Additionally, it defines 'firm generation capacity purchases' as costs incurred to address capacity deficiencies or maintain reserve levels, explicitly excluding certain reservation and option charges.

AVAILABILITY
AVAILABILITY This Rider is available only in conjunction with Company's Lighting and Power (LP) or Large Lighting and Power (LLP) rate schedules to Customers who contract for not less than 1000 kW of curtailable power. The applicable rate...

AI summary This section outlines the eligibility and limitations for a specific Rider related to curtailable power. It is available only to customers contracting at least 1000 kW of curtailable power under Lighting and Power or Large Lighting and Power rate schedules. Key constraints include a single point of delivery, exclusion of backup power for customer-owned generation, and a capacity limit of 5% of the Company's projected aggregate peak demand. Customers must also ensure that curtailment does not cause damage or impact public safety.

N-40RIRs Attachment SEB-NSPI - 2a, pt. 2 (Large File - 15 MB) 1 passage
41.2.6. CAPACITY SHORTAGE CONDITIONS
41.2.6. CAPACITY SHORTAGE CONDITIONS Capacity Shortage Conditions are defined as those conditions on any day in which the Company has insufficient generating resources, including firm purchases, capable of supplying its load requirements w...

AI summary The document provides a formal definition for Capacity Shortage Conditions. These conditions occur on any given day when the Company lacks sufficient generating resources, including firm purchases, to meet the load requirements within the Entergy Arkansas, Inc. (EAI) service area.

N-40RIRs Attachment SEB-NSPI - 2a, pt. 5 (Large File - 20 MB) 1 passage
Southwestern PUBLIC SERVICE Company
Southwestern PUBLIC SERVICE Company COMMISSION SCHEDULE SHEET RATE SCHEDULE #- With Finn RATE SCHEDULE # - Without Finn PUCTIV-147 Distribution No Notice 714.715.716 Distribution No Notice 684.685,686 Distribution Noticed 717,718.719 Distr...

AI summary The document presents a comparison of rate schedules for Southwestern Public Service Company, specifically contrasting rates with and without 'Finn'. It lists various distribution, transmission, and backbone service categories, including Fuel Factors #3, #5, #7, and #9. Additionally, it notes the cancellation of the Experimental Industrial Interruptible Rate Rider, which was previously available to customers with specific interruptible demand and telemetering capabilities.

N-40RIRs Attachment SEB-NSPI - 2a, pt. 3 (Large File - 23 MB) 9 passages
Availability of Service.
Availability of Service. Available for interruptible service to customers operating at 34,500 volts or higher if the Company has surplus capacity in operative generating equipment, transmission lines, and principal substation transformers...

AI summary The document outlines the conditions under which interruptible service is available to customers operating at 34,500 volts or higher. Service is contingent upon the Company having surplus capacity in its generating equipment, transmission lines, and principal substation transformers that exceeds the requirements of other customers. Customers must contract for sufficient capacity to meet normal maximum requirements, with a minimum contractual capacity of 10,000 kVA.

Terms of Contract.
Terms of Contract. The Company reserves the right to limit the total contract capacity for all customers served under this tariff to 100,000 kVA. (Cont'd on Sheet No. 14.3) ISSUED BY COULTER R. BOYLE, III VICE PRESIDENT FORT WAYNE, INDIANA...

AI summary The document outlines the terms of contract for a specific electric service tariff, noting that the Company reserves the right to limit the total contract capacity to 100,000 kVA for all customers served under this tariff. The document was issued by Coulter R. Boyle, III of Atlantic Power under the authority of the Indiana Utility Regulatory Commission and became effective on December 23, 1997.

Agers, Donna
Agers, Donna From: jrw : [email protected] Sent: F Friday, December 08, 2006 8:32 AM To: Agers, Donna Subject: Re: Kentucky Power Adjustments Hi Donna, The fuel adjustment, environmental and net merger credit factors are the same for all cu...

AI summary Donna Agers received a correspondence from Atlantic Power (AEP) regarding Kentucky Power adjustments. The communication clarifies that fuel adjustment, environmental, and net merger credit factors apply uniformly across residential, commercial, and industrial customer classes. It further specifies that residential customers are subject to additional surcharges, including a Home Energy Assistance fee of ten cents per month, a capacity charge, and a demand-side management factor, excluding school taxes or franchise fees.

Month Fuel Adj (/kWh) Capacity Net Merger DSM (/kWh) HEA (per meter)
Month Fuel Adj (/kWh) Capacity Net Merger DSM (/kWh) HEA (per meter) Charge(/kWh) Credit (/kWh) (/dollar) January 06 .0024319 .000847 000595 .000472 .10 .072271 April 06 .0028528 .000824 000595 .000248 .10 003053 July 06 .0072478 .000824 0...

AI summary The provided text is a data table presenting monthly values for various utility charges and adjustments for the year 2006. It includes specific rates for Fuel Adjustment (/kWh), Capacity charges and credits, Demand Side Management (DSM) costs, Home Energy Assessment (HEA) costs per meter, and Net Merger values. The data points are listed for January, April, July, and October of 2006.

TERM OF CONTRACT
TERM OF CONTRACT Contracts under this tariff will be made for an initial period of not Jess than 5 years and shall remain in effect thereafter until either party shall give at least 12 months' written notice to the other of the intention t...

AI summary This section outlines the contractual terms for services under the tariff, establishing a minimum initial contract period of five years. It specifies that contracts remain in effect until 12 months' written notice is provided by either party. The Company maintains the right to require longer initial contract periods if new facilities are necessary. Furthermore, it clarifies that existing customers increasing requirements do not need to restart their initial period unless new facilities are required, and the Company is not obligated to supply capacity beyond contracted amounts without mutual agreement.

Large General Service, LNP/LNO , continued
curtailment periods. c c T 3rd Revised Sheet No. I'M7.10 Canceling 2nd Revised Sheet No. N-4 7.1 0 Rider No. 57 to Electric General Service and Large General Service· Curtailment Service (can't) Option B customers may request a change in t...

AI summary The text outlines the terms for Rider No. 57 (Curtailment Service) for Electric General Service and Large General Service. It specifies procedures for customers choosing Option A or Option B regarding firm power level changes and service cancellations. Key provisions include the forfeiture of credits upon cancellation for Option B, the Company's requirements for accommodating firm power increases, and the methodology for verifying and adjusting curtailable load based on historical demand during curtailment periods.

Rider No. 57 to Electric General Service and Large General Service- Curtailment Service (con't)
Rider No. 57 to Electric General Service and Large General Service- Curtailment Service (con't) customer, provided the customer was alerted to the possibility of curtailment 12 or more hours prior to the beginning of the curtailment period...

AI summary The text outlines the operational rules for Rider No. 57, which governs the Curtailment Service for Electric General Service and Large General Service. It specifies notice requirements for curtailments intended to avoid MAPP capacity purchases (12 hours notice, with a 2-hour minimum) and those due to operating conditions. It also defines the maximum duration of curtailment periods, the annual limit of 16 such periods during summer peak months, and the methodology for randomly rotating curtailable groups. Finally, it establishes a statewide limit of 190,000 kW for total curtailable load.

Rider No. 2 to Electric General Service and Large General Service (Except Price Schedule LCL) -Curtailment Service (can't)
Rider No. 2 to Electric General Service and Large General Service (Except Price Schedule LCL) -Curtailment Service (can't) Option B customers may request a change in the firm power level annually. In addition, on 24 hours' notice, customer...

AI summary This document outlines Rider No. 2 for Electric General Service and Large General Service regarding Curtailment Service. It details two options for customers: Option B allows for annual firm power level changes and 24-hour service cancellation (with forfeiture of summer credits), while Option A requires immediate notification for increases. The Company reviews expected loads annually and may adjust minimum firm power levels based on historical demand. It also includes provisions for standby generators, minimum billing, and tax adjustments.

Rider No.2 to Electric General Service and Large General Service (Except Price Schedule LCL) -Curtailment Service (con't)
Rider No.2 to Electric General Service and Large General Service (Except Price Schedule LCL) -Curtailment Service (con't) r customer, provided the customer was alerted to the possibility of curtailment 12 or more hours prior to the beginni...

AI summary The text outlines the operational procedures for Rider No.2 Curtailment Service, specifically regarding notice periods and duration for load curtailment. It specifies that customers must be notified 12 hours in advance, unless the Company provides 2-hour notice to avoid MAPP capacity purchases. Curtailment periods are capped at 6 hours or until notice of termination. The Company will randomly group participants by net C loads and rotate between groups. Participation is limited to a state-wide total of 190,000 kW.

N-41RIR 1 Dr. Alan Rosenberg to NSUARB -REDACTED (Large File - 10 MB) 1 passage
DEVELOPMENT OF ALLOCATION FACTORS FOR THE YEAR ENDING DECEMBER 31, 2007 (IN THOUSANDS OF DOLLARS)
DEVELOPMENT OF ALLOCATION FACTORS FOR THE YEAR ENDING DECEMBER 31, 2007 (IN THOUSANDS OF DOLLARS) (1) (2) Pole & Wire Inv Demand % Responsibility (1) TOTAL COMPANY 147,218 100,00% (2) DOMESTIC 87,119 59,18% (3) SMALL GENERAL 5,749 3,91% (4...

AI summary The text presents a detailed breakdown of allocation factors for various infrastructure and customer categories for the year ending December 31, 2007, with percentages of responsibility attributed to different customer segments and infrastructure components.

N-44RIRs 76 to 136 - CA to NSPI - REDACTED (Large File - 19 MB) 2 passages
- ☐ Holidays scheduled for Dec 25, 26, and Jan 1
- ☐ Holidays scheduled for Dec 25, 26, and Jan 1 Key Milestones Target Date Status Conduct current state assessment 12/15 Complete Document leading practices in terms of 12/19 Complete capability and performance Evaluate NSPI performance a...

AI summary The document outlines key milestones for a project involving the assessment of NSPI's performance and the development of future operating capabilities, with a report submission to the UARB and scheduled workshops.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CA Question IR-107: Referring to page 15, for each system discussed on this page (i.e., WMS, CMS, WPI & CIS), what were the specific issues that led to the conclusion 5 that these systems shou...

AI summary NSPI has conducted technical reviews of several systems, including the Customer Information System (CIS), and found that while CIS currently meets business needs, its performance is degrading due to data accumulation and lack of flexibility. The system is rated as medium risk due to outdated software and limited adaptability to changing requirements.

N-46Rebuttal Evidence of NSPI - Appendix A to J - REDACTED (Large File 27 MB) 1 passage
Emera Inc. Generation Asset Performance
Emera Inc. Generation Asset Performance 2005 2004 2003 2002 2001 Thermal capacity utilization (%) 78 82 78 77 77 Generating capacity availaiblity (%) 90 92 91 91 91 Cost of fuel and purchased power (mil. C$) 374 303 278 336 302 NSPI's gene...

AI summary The document provides a performance overview of Emera Inc.'s generation assets, specifically focusing on thermal capacity utilization, generating capacity availability, and fuel and purchased power costs from 2001 to 2005. It notes that while Nova Scotia Power Inc. (NSPI) relies on coal-fired facilities, its generation portfolio benefits from diversification within its fossil fuel-fired assets. The utility asserts that it maintains adequate capacity and reserves to satisfy provincial load obligations.

57966Supplementary Board Order 2 passages
OP - Organization Profile
OP - Organization Profile - 1 . Latest regulated annual reports of NSPI and EMERA. - 2. Current organization chart of NSPI showing all positions reporting no further than two levels down from the President and CEO, including a full organiz...

AI summary The document outlines a list of information requests related to Nova Scotia Power Inc. (NSPI) and EMERA, including financial reports, organizational structure, asset details, maintenance schedules, fuel specifications, reliability statistics, customer data, and compliance with emissions targets.

OE - Operating expenses
ponent of the fuel price, so that the final plant-delivered cost is that used as input to the Strategist run. Include sources used to derive the requested data, and the date the forecast was prepared. - (I) Provide a summary of the current...

AI summary The text outlines a series of requests related to fuel transportation contracts, hedging programs, fuel supply studies, and fuel-related affiliate transactions. It also includes requests for data on gas usage, export and import power calculations, and cost and recovery calculations for fuel resale.

57966Supplementary Board Order 1 passage
OE - Operating expenses
ponent of the fuel price, so that the final plant-delivered cost is that used as input to the Strategist run. Include sources used to derive the requested data, and the date the forecast was prepared. - (I) Provide a summary of the current...

AI summary The document outlines a series of data requests related to fuel transportation contracts, hedging programs, fuel prices, gas usage, affiliate transactions, fuel supply studies, export/import calculations, force majeure issues, and fuel resale cost recoveries. These requests aim to provide transparency on fuel management and related financial aspects.

57968Amended Board Order (and attached Schedules A to C) 1 passage
Use of Self-Generation
Use of Self-Generation Unless existing customer-owned generation is to be retired, for purposes of determining forecast CBL energy, the continued use of such generation is to be appropriately accounted for in the customer's CBL energy requ...

AI summary The document outlines that customer-owned generation should be considered in the calculation of CBL energy requirements unless it is to be retired. Customers are expected to use their existing generation as they see fit, with the policy being approved by the Nova Scotia Utility and Review Board in 2007.

57974NSPI Compliance Filing 2007 Rate Application - REDACTED (Large File - 36 MB) 1 passage
FOR THE YEAR ENDING DECEMBER 31, 2007
FOR THE YEAR ENDING DECEMBER 31, 2007 (1) TOTAL (2) (3) SMALL (4) (5) GENERAL (6) SMALL (7) MEDIUM (8) LARGE (9) EXTRA LI (10) (11) (12) ALLOCATION COMPANY DOMESTIC GENERAL GENERAL LARGE INDUSTRIAL INDUSTRIAL INDUSTRIAL INTERR 2 MUNICIPAL...

AI summary The document presents a table with various metrics related to demand, responsibility percentages, and energy generation and purchase figures for different categories, including small, general, and large industrial sectors, as well as municipal and unmetered entities, for the year ending December 31, 2007.

86472Submission - Re: Future Filing Requirements and comments on Board Draft Strawman 1 passage
OP - Organization Profile
OP - Organization Profile - 1. Latest regulated annual reports of NSPI and EMERA - 2. Current organization chart ofNSPI showing all positions reporting no further than two levels down from the President and CEO, including a full organizati...

AI summary The document outlines a list of requested information for a regulatory proceeding, including organizational profiles, financial documents, and operational data related to NSPI and EMERA. It includes details on assets, reliability statistics, customer information, and emissions targets.

86475Board Letter - Re: NSPI Future Filing Requirements - Strawman Proposal - April 10, 2007 1 passage
OP - Organization Profile
OP - Organization Profile - 1. Latest regulated annual reports of NSPI and EMERA - 2. Current organization chart of NSPI showing all positions reporting no further than two levels down from the President and CEO, including a full organizat...

AI summary This document outlines a list of information requests related to Nova Scotia Power Inc. (NSPI) and EMERA, covering financial reports, organizational structure, asset details, maintenance schedules, fuel specifications, reliability statistics, customer data, and emissions compliance.

86477Submission - Re: Rate Hearing Future Filing Requirements 1 passage
12. In P-886, SEB IR-42 asked NSPI:
12. In P-886, SEB IR-42 asked NSPI: For each fossil fuel generating unit in NSPI's anticipated 2007 generating fleet (e.g. Tufts Cove Units 1 through 5, Point Aconi, etc.) please provide the following data: - (a) Book Value as of December...

AI summary SEB IR-42 requested NSPI to provide detailed data on fossil fuel generating units in its 2007 generating fleet, including book value, environmental book value, generation data, and fuel burn for 2006 and 2007.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →