1. Changes to Avoided Costs
p. p. 29
1. Changes to Avoided Costs The model will be modified to calculate the levelized system avoided costs in two parts. The current $/MWh avoided cost will be replaced with an avoided energy related costs ($/MWh) and an avoided demand related...
AI summary The model for calculating levelized system avoided costs will be revised to include separate components for energy and demand-related costs. NS Power will need to provide specific values for generation, transmission, distribution capacity, and fuel costs.