Capacity Costs across all matters →

N-7NSPI (Synapse) RIR-1 to RIR-46 - Redacted 7 passages
Section 893
contingency event to satisfy 10 Avoided Generation & • Battery control signal latency (seconds) discharge capacity and energy ($/kW, (can help forecast potential None Pilot 2/R3A Industrial Rate charge and discharge rates • Aggregated Batt...

AI summary The text discusses battery control signal latency, charge and discharge rates, and response times for industrial rates, relating to capacity and energy costs. It mentions pilot programs and reserve requirements.

Section 895
and discharge power (kW) and energy (kWh) versus actuals (%)

AI summary The text discusses the comparison between projected and actual values for discharge power (kW) and energy (kWh), highlighting the percentage differences.

Section 1121
general/administrative, customer care, non-union trade) minus those counted in (b) through (e). 2) Of the total in (1), above, how many FTEs were “Highly Skilled" 1,023.00 4) Of the total in (3), above, how many FTEs were "Highly Skilled"...

AI summary The text discusses the calculation of Full-Time Equivalents (FTEs) and specifically 'Highly Skilled' FTEs, as well as the potential for employment-related commitments in the Contribution Agreement (CA) that may not be fully captured by standard reporting methods.

Section 1123
5) Of the FTEs reported in 3), how many FTEs were in positions that did not exist prior to the project's start date (Sep 14, 2018) (i.e., new FTEs)? Include only FTE's working in positions that Existing employees that were working on the p...

AI summary The text asks about the number of full-time equivalents (FTEs) hired for new positions that did not exist prior to the project's start date in September 2018. It also requests an estimate of how many of these FTEs were in specific occupations.

Section 1125
a) Management b) Professional occupations in natural and applied sciences c) Technical occupations in natural and applied sciences d) Other professional occupations e) Trades (incl. construction) equipment operators and transport f) Occupa...

AI summary The text outlines various occupational categories and asks for the number of Full-Time Equivalents (FTEs) classified as 'Highly Skilled' within those categories, with a reported value of 0.00.

Section 1149
0 currently 0 entries in the Licensing Table. Is this correct? You have indicated that your business or institution did not file a patent application(s) in your fiscal year ending Dec, 2021. There are ← Patent Application Data Sheet 0 curr...

AI summary The text discusses data validation for a project spending block, indicating that if a SIF-funded project is part of a larger project, the spending must be less than total project expenditures. It also references patent application data with no entries in the Licensing and Patent Application Tables.

Section 1183
Unless otherwise specified, employment figures should be reported by using the following definition of a Full Time Equivalent (FTE): each 'employee', as defined above, who works for the client on a full-time basis (i.e. they are scheduled...

AI summary The text outlines the methodology for calculating Full-Time Equivalents (FTEs) for employment reporting, specifying that employees working at least 2,000 hours annually are considered full-time, and part-time equivalents are calculated by dividing total hours worked by 2,000. It also requests total employment in FTEs and breakdowns by occupation for the past fiscal year and on-project employment.

N-9-(i)J. Wilson CV 2 passages
Section 20
and Southern Alliance for Clean Energy. Methods for calculating dependable capacity credit for renewable resources and application to determination of avoided cost.

AI summary The text references the Southern Alliance for Clean Energy (SACE) and discusses methods for calculating dependable capacity credit for renewable resources, focusing on their application to determining avoided costs in regulatory proceedings.

Section 24
John D. Wilson  Grid Strategies, LLC Page 8 California PUC Docket A.19-08-013, direct testimony in Southern California Edison’s 2021 general rate case (track 2) on behalf of the Small Business Utility Advocates. Reasonableness of remedial...

AI summary John D. Wilson of Grid Strategies, LLC provided testimony in multiple regulatory proceedings across California, Georgia, and Nova Scotia, focusing on utility rate design, cost recovery, compliance with regulatory orders, and modifications to pricing programs. Key issues included the reasonableness of fuel contract costs, capacity cost calculations, and adjustments to time-of-use pricing.

90033Synapse (NSPI) IR-1 to IR-46 1 passage
Section 26
n Figures 68 and 30 69 including the actual load values as well as the percentages. Please provide the same 31 data and calculations for 2033. 32 33 Request IR-31: 34 Peak Demand (Section 10 Coincident Peak Demand Research, pp 90-94)

AI summary The text requests data and calculations related to load values and percentages from Figures 68 and 69 for 2033 and references a peak demand research section in the document.

90074E1 (NSPI) IR-1 to IR-7 1 passage
Section 3
cluded in the Load Forecast. Please provide all assumptions for each type 25 of heat pump included in the models. Please provide the supporting rationale for the 26 assumptions made. Date Filed: May 30, 2023 E1 (NS Power) Page 1 of 4 Effic...

AI summary EfficiencyOne (E1) requests Nova Scotia Power Inc. (NSP) to provide assumptions and supporting rationale for heat pump models included in the 2023 Load Forecast Report. The request focuses on clarifying modeling parameters and their justification.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →