Topic:"Capacity Costs" in M12420

Matter: Nova Scotia Power Inc. - CI C0067183 – TUC Wharf Access Bridge Replacement - $2,426,669 (U&U)
2 passages 2 documents

Capacity Costs across all matters →

N-1Application - CI C0067183 - TUC Wharf Access Bridge Replacement - Redacted 1 passage
Document No: XXX-XX-XXXX-XXXX p. p. 5
Document No: XXX-XX-XXXX-XXXX Project Cost Estimate Input Checklist and Maturity Matrix Process Industries Required fields: Estimate Classification Project Name: TUC Wharf Access Bridge Replacement Started or Preliminary Class 5 Class 4 Cl...

AI summary The document outlines a Project Cost Estimate Input Checklist and Maturity Matrix for the TUC Wharf Access Bridge Replacement. It includes sections on project scope, location, requirements, technology selection, and strategy, with maturity levels for each category.

99919Board Decision Letter 1 passage
Section 1 p. pp. 0-1
November 7, 2025 [[email protected]](mailto:[email protected]) Lana Myatt Senior Regulatory Analyst Nova Scotia Power Inc. 1223 Lower Water Street PO Box 910 Halifax, NS B3J 3S8 Dear Ms. Myatt: M12420 – Nova Scotia Power Inc. (NS P...

AI summary NS Power submitted an application for approval of the TUC Wharf Access Bridge Replacement project, costing $2,426,669. The Board reviewed the request and approved it, citing the bridge's critical role in fuel supply and the necessity of replacement due to structural deterioration.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →