HomeCapacity CostsM12596Evidence
Topic/Matter Intersection

Topic:"Capacity Costs" in M12596

Matter: Nova Scotia Power Inc. - CI C0080228 – HYD Hollow Bridge Generator Refurbishment - $2,587,170 (U&U)
3 passages 1 document

Capacity Costs across all matters →

N-1Application - Redacted 3 passages
JUSTIFICATION: p. p. 7
JUSTIFICATION: Justification Criteria: Hydro, Wind and Biomass

AI summary The justification criteria for hydro, wind, and biomass projects are being discussed, focusing on the evaluation standards used to assess their feasibility and alignment with energy goals.

Why do this project? p. p. 7
Why do this project? NS Power operates a comprehensive preventative maintenance program that includes inspections, condition assessments, and targeted maintenance to ensure safe and reliable hydro operations. The Hollow Bridge generator ro...

AI summary NS Power's preventative maintenance program failed to prevent a stator fault in the Hollow Bridge generator, leading to significant damage and the need for a complete rewind. The fault necessitates refurbishment to ensure reliable hydro operations and compliance with downstream water management requirements.

REDACTED C0080228 Page 3 of 5 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 7
Engineering Lift Plan Meals Freigh Stator Transport Rotor Transport Rental/ Crane Rental for Stator Crane Rental for Rotor Scaffolding Other C Contingency Consulting lot Meals lot t Postage De lot lot lot Maint of Equ lot lot soods and Se...

AI summary The text presents a table with various line items and associated costs, including categories such as Engineering Lift Plan, Meals, Freight, Stator Transport, Rotor Transport, and others, with corresponding dollar amounts and subtotals. The table includes line numbers, descriptions, quantities, and costs, as well as references to attachments and line numbers.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →