Matter: Nova Scotia Power Inc. - CI C0059483 – 83V L-5017 and L-5046 Rebuild Tap - $1,558,116
1 passage 1 document

Capacity Costs across all matters →

N-3NSPI (NSEB) RIR 2 to 3 - Redacted 1 passage
PARTIALLY CONFIDENTIAL (Attachment Only) p. p. 4
PARTIALLY CONFIDENTIAL (Attachment Only) Cost Element Phase 1 – L5017/L5046 tap ($ cost) Phase 1 – L5017/L5046 tap (estimate comments) Phase 2 – 83V-504 switch ($ cost) Phase 2 – 83V-504 switch (estimate comments) T-line Material 155,799 P...

AI summary The document presents a cost breakdown for two phases of a project involving T-line materials, substation materials, and various other expenses. The costs are partially confidential and referenced in several attachments, with some estimates based on initial scopes and ongoing design work by CBCL.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →