NON-CONFIDENTIAL 5 Interruptible Load (129) (135) (142) (141) (140) (140) (139) (139) (138) (138) 6 Firm Peak (with DSM) 2,367 2,391 2,407 2,422 2,453 2,480 2,513 2,550 2,592 2,628 7 Required Capacity 8 Required Reserve (20%) 473 478 481 4...
AI summary The document presents a table detailing the capacity planning for the energy system, including existing and new resources, retirements, and reserve margin calculations. It outlines the changes in firm capacity and reserve margin percentages for various years, reflecting the impact of new renewable energy additions, retirements of older facilities, and demand response contributions.