Home›Capacity Costs›M13175›Evidence
Topic/Matter Intersection

Topic:"Capacity Costs" in M13175

Matter: Nova Scotia Power Inc. - 2027 Annually Adjusted Rates (AARs)
12 passages 1 document

Capacity Costs across all matters →

N-1Application - Redacted 12 passages
16 7.3 Standby Service Tariff p. pp. 27-29
16 7.3 Standby Service Tariff 17 18 The Standby Service (SS) Tariff is a mandatory tariff applicable to LRSs for supplemental standby 19 generation capacity service provided in combination with EBS under the EBS Tariff. The SS Tariff 20 ha...

AI summary The text introduces the Standby Service (SS) Tariff, which is a mandatory tariff for Load Resource Systems (LRSs) providing supplemental standby generation capacity in conjunction with Electricity Bulk Supply (EBS). The tariff consists of two primary rate components: the Administration Charge and the Demand Charge. The Administration Charge is applied to each LRS account and is established annually based on anticipated administration costs and the forecasted number of LRS accounts.

6 7.5.1.2 Annually Adjusted Energy Savings Credit p. p. 30
6 7.5.1.2 Annually Adjusted Energy Savings Credit 7 - 8 The Annually Adjusted Energy Savings Credit is designed to credit the LRS with any non-fuel - 9 energy-related cost savings arising from freed-up capacity on NS Power's system as a re...

AI summary The text discusses the Annually Adjusted Energy Savings Credit, which is intended to credit the Load Resource System (LRS) for non-fuel energy-related cost savings when bundled service loads depart for the Real-Time (RtR) market. However, Nova Scotia Power argues that these savings are limited because it must maintain generation capacity to accommodate potential customer returns. Consequently, the Company does not project any savings in this category and proposes maintaining the current value of zero for 2027.

AVAILABILITY p. p. 37
AVAILABILITY - (1) This tariff is available to port authorities of Nova Scotia for the sole purpose of providing port electricity to cruise ships docked in ports to meet their own consumption needs in displacement of the on-board self-gene...

AI summary The document outlines the availability and conditions of a specific tariff for Nova Scotia port authorities. The tariff is intended solely for providing electricity to docked cruise ships to displace on-board self-generation, provided the regular demand is at least 2,000 kVA or 1,800 kW. Customers under this tariff must accept supply interruptions. In the event of supply shortfalls, the tariff establishes a specific priority sequence for calling upon various rate classes to provide capacity to Nova Scotia Power Inc. (NSPI). The tariff is seasonal, active from April 1 to November 30.

WHOLESALE MARKET BACKUP/TOP-UP SERVICE TARIFF Page 2 of 6 p. p. 37
WHOLESALE MARKET BACKUP/TOP-UP SERVICE TARIFF Page 2 of 6 (b) For dispatchable generation, GC = the supplier's maximum capacity contracted to provide its wholesale customers' demand. CD is the customer's Contract Demand CCF is the capacity...

AI summary This section of the Wholesale Market Backup/Top-Up Service Tariff defines key technical parameters for dispatchable generation and capacity measurements. It establishes that Generating Capacity (GC) represents the maximum contracted capacity a supplier can provide to its wholesale customers. Additionally, it defines Contract Demand (CD) and the Capacity Contribution Factor (CCF), which is used by Nova Scotia Power Inc. (NSPI) to determine the contribution of third-party supplier generation to the system at the start of each billing year based on planning studies.

WHOLESALE MARKET BACKUP/TOP-UP SERVICE TARIFF Page 6 of 6 p. p. 37
WHOLESALE MARKET BACKUP/TOP-UP SERVICE TARIFF Page 6 of 6 - (d) The capacity derived based on the CCF is procured and available to the wholesale customer on a minimum three-year forward basis, unless this requirement is waived by NSPI. - (...

AI summary This section of the Wholesale Market Backup/Top-Up Service Tariff outlines the procurement and delivery obligations for wholesale customers. It specifies that capacity based on the capacity contribution factor (CCF) is generally procured on a minimum three-year forward basis. It also establishes a penalty mechanism where wholesale customers must compensate Nova Scotia Power Inc. (NSPI) for the costs of procuring replacement energy or capacity in the event of a resource failure. Furthermore, it provides a process for negotiating CCF adjustments if a resource's performance is inconsistent with provided documentation, with the option for expedited Board adjudication.

BUTU Capacity Credit Calc. p. p. 37
BUTU Capacity Credit Calc. Installed Capacity Approved Contract FAM-related Gross Demand Net Demand payment Capacity Capacity Credit Demands (kWs) Demand Charge Payment bfr Credits Credit Ellershouse Imports 23,500 20.54% 0% 7,549 $8.142 $...

AI summary The document presents a capacity credit calculation for Ellershouse Imports as part of an appendix for the 2027 Annual Adjustment Rate (AAR). It details specific metrics including installed capacity (23,500), a 20.54% capacity credit, approved contract demands of 7,549 kWs, and associated demand charges. The table concludes with a total capacity credit of -$392,997. The information is noted as redacted and confidential.

Annual Peak of ATL 2,347,983 Annual Energy Requirement of ATL 10,656,168,727 p. p. 37
Annual Peak of ATL 2,347,983 Annual Energy Requirement of ATL 10,656,168,727 System Coincident Load Factor 51.81% Generation-related Trans Assets Plant $ 60,407 $ 58,575 $ 62,240 Generation-related Trans Assets CWIP $ - $ - $ - Total Gener...

AI summary The document provides a detailed breakdown of the Annual Total Load (ATL) and associated energy requirements, including a system coincident load factor of 51.81%. It presents a financial table categorizing plant costs into generation, distribution, transmission, communication, and retail components. Notably, it includes a classification of the Generation Rate Base, detailing 'Steam Plant' assets across various categories such as Demand, Energy, and Customer, while distinguishing between initial and further classifications.

- o "CMDAFi" is the Class Monthly Demand Adjustment Factor applicable to each class as set out below: p. p. 37
- o "CMDAFi" is the Class Monthly Demand Adjustment Factor applicable to each class as set out below: Classes Jan, Feb, Dec Mar, Apr May, Jun Jul, Aug, Sep Oct, Nov Domestic 1.00 1.34 2.15 2.29 1.64 Small General 1.00 1.23 1.63 1.59 1.35 G...

AI summary The text defines the Class Monthly Demand Adjustment Factor (CMDAFi) for various customer classes (Domestic, General, Industrial, etc.) across different months of the year. It also specifies that the Planning Reserve (PR) is based on Northeast Power Coordinating Council planning criteria, typically set at 20% or as updated.

Preamble p. p. 37
- "CCi" is a capacity contribution factor of LRS' generator to NS Power's system peak as determined by NS Power. The capacity contribution factor may be the subject of periodic adjustment if operating conditions of the generator, such as a...

AI summary The text defines the Capacity Contribution Factor (CCi), which measures a Licensed Retail Supplier's (LRS) generator contribution to Nova Scotia Power's system peak. It establishes that NS Power determines this factor and notes that it is subject to periodic adjustment if generator operating conditions, such as prolonged deration, deviate from initial assumptions. For non-dispatchable resources, the CCi must be determined using the Effective Load Carrying Capability (ELCC) methodology as specified in the Integrated Resource Plan.

DETERMINATION OF MONTHLY STANDBY CONTRACT DEMAND p. p. 37
DETERMINATION OF MONTHLY STANDBY CONTRACT DEMAND Monthly Standby Contract Demand (MSCD) in kW is determined using the following formula: MSCD = LWPFD - min (LWPFD, (\sum_{i=1}^{nn} CCi \ GCi)/(1+PR))

AI summary The document defines the formula for calculating Monthly Standby Contract Demand (MSCD) in kilowatts (kW). The calculation determines MSCD by taking the Load Weighted Planning Factor Demand (LWPFD) and subtracting the lesser of the LWPFD or the total Generating Capacity (GCi) adjusted by the Customer Capacity Factor (CCi) and the Planning Reserve (PR).

STANDBY SERVICE TARIFF p. p. 37
STANDBY SERVICE TARIFF Renewable to Retail LWPFD = \sum_{i=1}^{k} (CMPFDi \ CMDAFi)

AI summary The document snippet introduces the 'Renewable to Retail' component of the Standby Service Tariff. It provides a specific mathematical formula for calculating the Load Weighted Planning Factor Demand (LWPFD), which is defined as the summation of the product of the Contract Maximum Planning Factor Demand (CMPFD) and the Contract Maximum Demand Adjustment Factor (CMDAF) across multiple components.

2027 AAR Appendix G8 (redline) Page 5 of 5 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 37
2027 AAR Appendix G8 (redline) Page 5 of 5 REDACTED (CONFIDENTIAL INFORMATION REMOVED) STANDBY SERVICE TARIFF Page 5 of 5 Renewable to Retail - (ii) If the LRS' resource is non-dispatchable, that it makes its full output for which it is pr...

AI summary This section of the Standby Service Tariff outlines the obligations of a Load Resource Supplier (LRS) regarding non-dispatchable renewable resources. It requires the LRS to make energy available to NS Power during resource adequacy needs, coordinate on planned outages, and recall export transactions if necessary. Additionally, it establishes a penalty mechanism where the LRS must compensate NS Power for the costs of procuring replacement capacity if the LRS fails to deliver scheduled energy or capacity as directed by the NSPSO.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →