Topic/Matter Intersection

Topic:"Capacity Market Participation" in M06319

Matter: P-886 Nova Scotia Power Inc. (NSPI) Rate Application 2007
4 passages 4 documents

Capacity Market Participation across all matters →

N-7-aRIRs 85 to 104 [105 to 107 (Filed 03/05/2007)] - NSUARB to NSPI - REDACTED 1 passage
Response IR-98:
Response IR-98: - a. The Net Operating Capability as used in reliability studies is the 2,283 MW within the accuracy noted. - b. The 1.3 MW is the installed capacity.

AI summary The response outlines the Net Operating Capability as 2,283 MW and the installed capacity as 1.3 MW, as noted in reliability studies.

N-7-bRIRs 142 to 143 - SEB to NSPI - REDACTED (Large File - 45 MB) 1 passage
Increasing returns at Bear Swamp
Increasing returns at Bear Swamp - Contracting significant portion of output to enhance consistency of returns - LICAP settlement adds substantial value

AI summary The text discusses the strategy for enhancing the consistency of returns at the Bear Swamp facility by contracting a significant portion of its output. Additionally, it notes that the settlement of the Load Investment Cost Adjustment Program (LICAP) provides substantial value to the project's financial profile.

N-14Evidence filed by John Antonuk, Donald T. Spangenberg, Jr. and John B. Adger, Jr. (on behalf of NSUARB) (Large File - 26 MB) 1 passage
Q. DID THE BOARD ADOPT THOSE RECOMMENDATIONS?
Q. DID THE BOARD ADOPT THOSE RECOMMENDATIONS? 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 A. Q. A. Q. A. Q. A. Yes. WHAT HAS HAPPENED IN RESPONSE TO YOUR RECOMMENDATION FOR ANOTHER COMPETITIVE SOLICITATION? NSPl retained a co...

AI summary The Board adopted recommendations, including conducting competitive solicitations for excess gas. NSPI retained a consultant to administer two competitions, both won by the affiliate. However, the Board found these competitions insufficient in terms of arm's-length dealing. Discussions with NSPI focused on evaluating term-sale offerings and market penetration strategies for natural gas.

86477Submission - Re: Rate Hearing Future Filing Requirements 1 passage
VII. Miscellaneous
VII. Miscellaneous - (a) Breakdown of Generati ng Capacity - (b) Reliability Statistics - (c) Plant Maintenance / Depreciation / Additions I Retirement Information - (d) Filings with the Board

AI summary This section outlines various miscellaneous topics including a breakdown of generating capacity, reliability statistics, plant maintenance and depreciation information, and filings with the Board.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →