& lt;sup>4 Burnside Unit #4 (winter capacity of 33 MW) was unavailable at the time but was planned to be returned to service by the end of Q2 2018. IPPs & Renewables Pre-2001 Renewables Biomass/Hydro 25.8 Post-2001 Renewables (firm)5 Bioga...
AI summary Burnside Unit #4, with a winter capacity of 33 MW, was unavailable at the time but was planned to be returned to service by the end of Q2 2018. The table provides details on various renewable energy sources and their capacities, including pre- and post-2001 renewables, NS Power wind, and community feed-in-tariff projects.