Topic/Matter Intersection

Topic:"Capacity Market Participation" in M11764

Matter: Nova Scotia Power Inc. - 10-Year System Outlook Report - 2024
19 passages 7 documents

Capacity Market Participation across all matters →

N-1Report 9 passages
Section 4
.................................................................................................... 20 15 3.2.5 Rate Base Procurement ...........................................................................................................

AI summary The document outlines sections covering rate base procurement, unit utilization forecasts, system impact studies, environmental regulatory requirements, and resource adequacy. Key themes include energy mix evolution, transmission service queues, renewable electricity mandates, and environmental policy updates.

Section 31
Victoria Junction Light Fuel Oil 66 Total Combustion Turbine 231 Pre-2001 Renewables Independent Power Producers (IPPs) 25.7 Post-2001Renewables (firm) IPPs 64.3 NS Power wind (firm) Wind 14.5 Community-Feed-in-Tariff (firm) 8 7F IPPs 29.6...

AI summary The document corrects the Mersey system's firm capacity alignment with an ELCC adjustment, notes Annapolis out of service, Lingan Unit 2 in cold reserve until 2027, and specifies 18% firm capacity from ERIS/NRIS wind projects, referencing sections 3.1.2, 3.2.3, 3.2.4, and 6.3.

Section 36
3 The NS Power 2024 ACE Plan and Path to 2030 included sustaining capital investments in the 4 Mersey Hydro System (MHS) which will ensure safe and reliable water management throughout 5 the timeframe required to complete adequate prelimin...

AI summary NS Power's 2024 ACE Plan and Path to 2030 emphasizes sustaining investments in the Mersey Hydro System (MHS) regardless of redevelopment or decommissioning, citing economic benefits and contributions to renewable energy targets. The MHS provides 45.8 MW capacity and 220 GWh annually toward NS Power's goals, with updated reliability metrics reflecting its role in system planning.

Section 42
nitor the development of these potential resources and reassess as needed. Figure 22 5 below shows the anticipated DSM and firm capacity changes over the ten-year period 23 starting in 2025. 24 DATE FILED: June 27, 2024 Page 15 of 67 2024...

AI summary The text discusses the monitoring of potential resources and reassessment as needed, referencing Figure 22.5, which shows anticipated DSM and firm capacity changes over a ten-year period starting in 2025.

Section 50
MW • Firm capacity: 12 MW20 2033/2034 Wind – Future Procurements • Installed capacity: 200 MW • Firm capacity: 12 MW20 1 2 3.2.2 Brooklyn Power 3 4 Brooklyn Power owns a 24 MW firm dispatchable renewable energy biomass facility located in...

AI summary The document outlines the current status of various energy generation facilities, including Brooklyn Power's 24 MW biomass facility and Lingan Unit 2, which was placed in cold reserve in August 2022. Lingan Unit 2 was recalled multiple times during the 2023/2024 winter to support firm customer load. NS Power is maintaining existing thermal units in cold reserve to ensure planning reserve margin as new firm capacity resources are added to the system.

Section 54
Non-Confidential 1 6B(2)(b) of the Renewable Electricity Regulations 22 as part of meeting NS Power’s 2030 21F 2 Decarbonation Goals. 3 4 The RBP portfolio was announced on August 17, 2022 and subsequently updated on July 12, 2023 5 and Fe...

AI summary The RBP portfolio, part of NS Power's efforts to meet decarbonization goals, was initially announced in 2022 and has since been updated. One project withdrew, reducing the total capacity and energy from five to four projects. The withdrawn project's capacity will be added to the Green Choice procurement round, increasing its maximum capacity. The report also discusses unit utilization forecasts and the evolution of Nova Scotia's energy mix.

Section 71
Unit 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 TRE-5 L L L L - - - - - - - TRE-6 H H H H M L - - - - - TUC-1 M M L L L L UL UL UL UL UL TUC-2 H M M M M H H H M M H TUC-3 H H M H M H H H H H H TUC-4 H H H H H H H H H H H TUC-5...

AI summary The text discusses projected sustaining investments for various units, based on utilization forecasts and failure mechanisms. It highlights that NS Power does not account for unplanned failures in these estimates and explains how different asset classes are evaluated, with some prorated by utilization factor and others influenced by additional factors.

Section 109
1 6.3 Capacity Contribution of Renewable Resources in Nova Scotia 2 3 Due to their variability, renewable energy resources such as wind and solar are not always available 4 to contribute during peak demand hours. The Effective Load Carryin...

AI summary The document discusses the capacity contribution of renewable resources in Nova Scotia, focusing on the Effective Load Carrying Capability (ELCC) of wind and solar energy. The NSUARB directed NS Power to conduct a Capacity Study to calculate ELCC values for existing and potential new wind resources, with results showing a declining marginal ELCC as more wind is added to the system.

Section 115
1 NS Power supports updating the capacity study prior to the next IRP analysis, with the focus of 2 the update being an examination of the interactive effect of the identified clean resources (wind, 3 solar, battery energy storage, and dem...

AI summary NS Power supports updating the capacity study prior to the next Integrated Resource Plan (IRP) analysis, focusing on the interactive effects of clean resources. Municipal load in certain areas is served by a wind farm not included in NS Power’s sourced wind generation. Due to increased firm peak demand and delays in the Wreck Cove LEM Project, NS Power will not meet the 20% PRM target for the 2024/2025 Winter period and will implement strategies like keeping Lingan 2 in cold reserve.

N-2NSPI (CA) RIR-1 to RIR-6 - Redacted 1 passage
Section 11
2024 10-Year System Outlook Report (NSUARB M11764) NSPI Responses to CA Information Requests NON-CONFIDENTIAL 1 (d) Achieving Hybrid Peak scenario peak reductions are contingent on the completion of work 2 referenced in part (b). The compl...

AI summary NSPI states that achieving Hybrid Peak scenario reductions depends on completing a Hybrid Peak study. Current peak reductions rely on DR activities (including DLC, TVP, BNI curtailment), while customer growth and electrification increase peak demand. NS Power's resource plan includes DSM/DR programs and maintains a Planning Reserve Margin (PRM) to buffer uncertainties.

N-3NSPI (NSUARB) RIR-1 - RIR-18 3 passages
Section 5
ed clean resources (wind, solar, battery 31 energy storage, and demand response). As a starting point for this work, NS Power will 32 develop a draft scope of work and project schedule to be circulated to IRP stakeholders for 33 comment by...

AI summary NS Power is developing 300 MW of new firm capacity for Winter 2027/2028, with studies on technology, supply chain, and grid integration progressing. A second 300 MW for 2029/2030 will follow a similar model. Environmental studies and permitting will continue into 2025. The Hybrid Peak mitigation program is referenced in another document.

Section 8
1 Request IR-3: 2 3 Figure 3 shows the Nova Scotia Block with a maximum rated capacity of 145.4 MW 4 during the winter peak period. In its response to Board IR-3 in Matter M11221, NS 5 Power stated that the NS Block includes the provision...

AI summary The document discusses NS Power's use of a 95% ELCC (Effective Load-Carrying Capacity) assumption for the Nova Scotia Block in its 10-Year System Outlook Report, contrasting with a 98% ELCC in prior studies. It requests updated data, continuation of the assumption, and examples of peak demand periods exceeding 145.4 MW. NS Power references recent reports from NSPML and ENL on system reliability but does not confirm new data acquisition.

Section 158
units or transmission assets, etc. The amount of available reserve capacity for the Winter 29 2024/2025 means NS Power has sufficient capacity to serve firm customers uninterrupted Date Filed: September 19, 2024 NSPI (NSUARB) IR-17 Page 1...

AI summary NS Power has sufficient reserve capacity to serve firm customers uninterrupted during the Winter 2024/2025, as outlined in the 2024 10-Year System Outlook Report. The report was filed on September 19, 2024, as part of NSPI's responses to NSUARB Information Requests.

N-4NSPI (SBA) RIR-1 to RIR-6 1 passage
Section 11
Path to 2030 document. 25 2026/2027 The forecast was updated for the 10-Year System 25 2027/2028 Outlook with the 25 2028/2029 maximum capacity of the program (100 MW). As of the writing of the report, Community the first solar gardens Sol...

AI summary The 2024 10-Year System Outlook Report updates the Community Solar Program's capacity to 100 MW, with 25 MW annual potential. Solar gardens under the program are expected online by spring 2026. The document, filed by NSPI (SBA) as NSUARB M11764, outlines program development timelines and capacity projections.

N-6Rebuttal Evidence - NSPI 2 passages
Section 5
1 1.0 INTRODUCTION 2 3 On June 27, 2024, Nova Scotia Power Incorporated (NS Power, Company) submitted its 10-Year 4 System Outlook Report (Report) to the Nova Scotia Utility and Review Board (NSUARB, Board). 5 By Hearing Order on July 26,...

AI summary NS Power submitted a 10-Year System Outlook Report to the NSUARB, prompting stakeholder interventions. The SBA noted the report's consistency with prior planning documents (Evergreen IRP, Path to 2030) but highlighted discrepancies, such as reduced wind capacity from Rate Base Procurement (306 MW vs. 373 MW). NS Power responded to IRs, with SBA and CA submissions leading to this rebuttal.

Section 12
Canada (ECCC) has acknowledged the 29 requirement for emitting resources operating in a peaking capacity as part of the 30 CER. In response to stakeholder feedback on the CER, ECCC released an update 31 that refers to the concern raised by...

AI summary Environment and Climate Change Canada (ECCC) acknowledged the need for peaking capacity resources in the Clean Energy Regulation (CER). Stakeholder feedback led to an ECCC update addressing flexibility for grid reliability and demand. The Small Business Advocate (SBA) submitted evidence related to Nova Scotia Power Inc.'s (NSPI) 2024 10-Year System Outlook Report (M11764).

95171NSUARB (NSPI) IR-1 to IR-18 2 passages
Section 4
ak mitigation scenario, 26 and an updated analysis of battery energy storage capacity, prior to any significant 27 commitment regarding 2029 or 2030 CT additions. This work needs to proceed. 28 29 Figure 6 on page 18 notes the addition of...

AI summary The text requests updates on NS Power's progress with two recommendations related to mitigation scenarios and battery storage analysis. It references combustion turbine capacity additions (300 MW in 2027/2028 and 2029/2030) and cites a prior response to Board IR-3 in Matter M11221 regarding Nova Scotia Block's winter peak capacity.

Section 15
Document: 305605 Date Filed: Aug. 27, 2024 NSUARB (NS Power) Page 5 of 6 1 Please provide the latest update regarding this project. 2 3 Request IR-15: 4 On page 59, NS Power stated that in collaboration with Manitoba Hydro International (M...

AI summary The document contains regulatory requests to NS Power regarding project updates, integration of inverter-based resources (IBR), expansion of the 10-Year System Outlook, and planning reserve criteria. Requests include filing a report on IBR integration, assessing distribution system inclusion in the System Outlook, and clarifying confidence in meeting winter peak demand and reserve margin targets.

95185CA (NSPI) IR-1 to IR-6 1 passage
Section 7
to part (b) that has does not have a firm delivery 29 date consistent with the target in-service date of 2028, please describe NS Power’s risk 30 mitigation plan for late delivery. 31 32 Request IR-4: 33 34 Re: Exh. N-1, p. 19. 35 36 a) Pl...

AI summary The document contains regulatory requests directed at NS Power, including inquiries about risk mitigation for project delays, cost breakdowns from Lingan Unit 2 recalls, and infrastructure reliability data for a 345 kV transmission line. Requests also address planning reserve margins and outage history.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →