2025 Annual FAM Report (NSEB M12742) NSPI Responses to NSEB Information Requests 1 Request IR-2: 18 in 2024, and the average net load increased from approximately 76 MW to 100 MW over 19 the same period. The combination of longer duration...
AI summary The 2025 Annual FAM Report discusses increased generation output due to higher net load and the dispatch of Lingan 2. The SO2 Certificate of Variance (CoV) allowed NS Power greater operational flexibility, enabling more use of solid fuel. Discrepancies exist between the FAM Report and the 10-year system outlook report regarding hydro generation capacity.
REDACTED 1 Request IR-6: 2 3 Reference: Tab A6NC 4 5 (a) Please explain why, as a solid fuel generator, Point Aconi's capacity factor was lower 6 than budgeted, when solid fuel production overall was much higher than budgeted 7 across the...
AI summary The document discusses Point Aconi's lower-than-budgeted capacity factor despite higher overall solid fuel production, attributing it to changes in SO₂ certificate of variance and dispatch decisions influenced by system economics. It also addresses lower-than-budgeted availability factors for multiple generating units, with NSPI citing planned outages as the basis for budgeted figures.