Topic/Matter Intersection

Topic:"Capacity Market Participation" in M12768

Matter: Nova Scotia Power Inc. - Extra Large Industrial Active Demand Control Tariff (ELIADC) - 2025 Annual Report
2 passages 2 documents

Capacity Market Participation across all matters →

N-3NSPI (IG) RIR 1 to 15 - Redacted 1 passage
Part D – Operating Mode Characteristics Schedule p. pp. 11-12
Part D – Operating Mode Characteristics Schedule For the purpose of planning, dispatch and forecasting, PHP's loading levels will be separated into 9 distinctive operating modes. Only one mode will be able to operate at any given time. The...

AI summary Part D outlines the Operating Mode Characteristics Schedule for PHP, detailing nine operating modes with specific parameters such as maximum and minimum loading levels, ramp rates, and energy requirements. This schedule is crucial for planning, dispatch, and forecasting, and must be followed by NS Power and NSPSO. It may be updated with agreement between PHP and NS Power.

N-4NSPI (SBA) RIR 1 to 4 1 passage
1 Request IR-1: p. p. 4
1 Request IR-1: 4 Proceedings, 1. 2022-2023 FAM Audit Report Recommendation XV-1, on page 7: 5 6 (a) Please provide an example of the overlapping, incomparable dispatch results ("e.g., 7 unit starts and shutdowns which are in conflicting p...

AI summary The text contains a request (IR-1) asking for an example of overlapping, incomparable dispatch results from different models, specifically unit starts and shutdowns in conflicting positions. It also asks whether these conflicts involve many resources or specific units, including the biomass plant, and inquires about the precision tolerance of the PortOps model and its ability to model system output on an hourly basis. A response (IR-3) is indicated but not provided.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →