Topic/Matter Intersection

Topic:"Capacity Market Participation" in M12916

Matter: Nova Scotia Independent Energy System Operator (IESO Nova Scotia) - 10-Year System Outlook Report for 2026
13 passages 8 documents

Capacity Market Participation across all matters →

N-12026 10-Year System Outlook Report 2 passages
3.1 Existing Generation Resources p. pp. 7-8
with weather, time of day, state of charge, or program design, and therefore may not coincide with periods of resource need. As a result, energy limited resources contribute less to resource adequacy. Effective Load Carrying Capability (EL...

AI summary The text discusses Effective Load Carrying Capability (ELCC), a method used in Nova Scotia to quantify the capacity contribution of energy-limited resources. ELCC is expressed as a percentage of a resource's installed capacity and declines with increased penetration of such resources. Energy+Environmental Economics (E3) conducted ELCC studies in 2019 and 2026 as part of the Integrated Resource Plan (IRP) process.

Winter 2026/ 2027 2027/ 2028 2028/ 2029 2029/ 2030 2030/ 2031 2031/ 2032 2032/ 2033 2033/ 2034 2034/ 2035 2035/ 2036 p. pp. 18-19
Winter 2026/ 2027 2027/ 2028 2028/ 2029 2029/ 2030 2030/ 2031 2031/ 2032 2032/ 2033 2033/ 2034 2034/ 2035 2035/ 2036 1 Load Forecast 2 System Peak (with DSM) 2,497 2,526 2,549 2,563 2,593 2,620 2,652 2,689 2,730 2,765 3 Interruptible Load...

AI summary The table presents a 10-Year System Outlook (10YSO) with load forecasts, system peak, required capacity, existing and new firm resources, retirements, and reserve margin percentages for various years from 2026/2027 to 2035/2036. It outlines the capacity additions and retirements, including wind, storage, and coal-to-gas conversions, along with the resulting reserve margins.

N-2IESO (CA) RIR 1 to 9 1 passage
9 a) Maritime Link Energy includes the following contracts: p. p. 1
9 a) Maritime Link Energy includes the following contracts: Block Firm Capacity (MW) Total Annual Energy (GWh) Applicable in Period Base Block 153 895 2027, 2028, 2030 Supplemental Block Non-Firm 240 2027 Surplus Energy Non-Firm 1200 2027,...

AI summary The text details Maritime Link Energy contracts, including Base Block, Supplemental Block, and Surplus Energy with specific capacities and applicable periods. It also provides a table showing curtailment by source in the RES Compliance Forecast for wind and solar energy across 2027, 2028, and 2030.

N-4IESO (NSEB) RIR 1 to 19 1 passage
Preamble p. p. 10
- Thermal conversions are reflected as firm capacity additions in the year they come into service: the Coal-to-Gas conversion (150 MW) represents the Point Tupper 2 conversion in 2028/2029, and Coal-to-HFO (459 MW) represents the Lingan un...

AI summary The document discusses two thermal conversion projects: Coal-to-Gas (150 MW) and Coal-to-HFO (459 MW), which are expected to be completed in 2028/2029 and involve the Point Tupper 2 and Lingan units 1, 3, and 4, respectively. The text raises questions about the start and end dates of these projects and the alternative resources that will replace their capacity and energy during the conversion process.

N-7IESO (SBA) RIR 1 to 22 3 passages
1 Request IR – 7 p. p. 11
1 Request IR – 7 - 2 Refer to the 2026 Report Section 3 Existing Generation Resources, page 9, footnote 9. Please - 3 describe how much of the installed capacity in Table 2 is attributable to the Community Feed-In- - 4 Tariff (FIT) program...

AI summary The response to Request IR–7 indicates that 2.5 MW of the 27.6 MW of Biomass IPP capacity is attributable to the Community Feed-In-Tariff (FIT) program. Biogas FIT projects were aggregated with biomass projects due to their small volume. A list of all FIT projects is available in the 2025 Comfit Annual Report (M12687).

Preamble p. p. 14
- NS states that it has contracted 100 MW of firm generation capacity from NB Power under a 10- - year agreement, with delivery beginning "as early as 2028." - a) Please describe the basis for the delivery timing assumption of Winter 2028/...

AI summary Nova Scotia has contracted 100 MW of firm generation capacity from NB Power under a 10-year agreement, with delivery starting as early as Winter 2028/2029. The proceeding seeks clarification on the basis for this timing assumption and the alternative plan if the import does not materialize.

2026 10 Y 3 10 YSO - Table 3 2025 10 Y SO - Figure 7 p. p. 17
2026 10 Y 3 10 YSO - Table 3 2025 10 Y SO - Figure 7 Name Addition/ Retirement/ Conversion Installed Capacity (MW) Winter Installed Capacity (MW) Winter Reconciliation and Drivers for Change Rate Base Procurement Addition 33 273 in-service...

AI summary The document presents a table with information on installed capacity and project timelines related to the Rate Base Procurement. It also mentions the Nova Scotia Independent Energy System Operator (IESO Nova Scotia) responding to the Small Business Advocate (SBA) information requests.

103608NSEB (IESO) RIR 1 to 19 1 passage
Request IR-8:
Request IR-8: - Table 3, pdf page 15, of the report identifies additions and retirements over the next 10 years. - Table 4, pdf page 18, of the 10-Year Load and Resource Outlook. - a) Please explain whether the firm capacity values listed...

AI summary The document requests clarification on whether the firm capacity values and additions in Tables 3 and 4 are based on Effective Load Carrying Capacity (ELCC) or nameplate values, and whether ELCC percentages are factored into the 10-year projections.

103637CA (IESO) IR 1 to 9 1 passage
Request IR-6:
Request IR-6: Reference : Exh. N-1, Appendix A - a) Please provide a discussion of this table, with a particular focus on the forecast surplus of 3 GWh in 2030 and also a discussion of IESO-NS's expectations for 2031 and 2032 compliance. b...

AI summary Request IR-6 asks IESO-NS to discuss a forecast surplus of 3 GWh in 2030 and expectations for 2031 and 2032 compliance. It also inquires about IESO-NS's plans for addressing potential shortfalls in renewable energy and load exceedances.

104079Submissions - IG 2 passages
Delivered by Email p. p. 1
Delivered by Email Crystal Henwood Regulatory Affairs Officer/Clerk Nova Scotia Energy Board 3rd Floor, 1601 Lower Water Street PO Box 1692, Unit M Halifax, NS B3J 3S3 Dear Ms. Henwood: Re: M12916 – IESO NS– 10-Year System Outlook Report T...

AI summary The Industrial Group submits comments regarding the IESO-NS 10-Year System Outlook Report, highlighting concerns about the Planning Reserve Margin, reliance on third-party projects, Renewable Electricity Standards compliance, and forecasting capabilities. The Group emphasizes the need for greater clarity and continued Board oversight.

CONCLUSION p. p. 5
CONCLUSION IESO-NS has the opportunity to file rebuttal submissions and may be prepared to accept the IG's recommendations. If so, the IG welcomes those commitments. In the absence of those commitments, the IG respectfully requests that th...

AI summary The IG recommends that IESO-NS provide specific updates and reports in its filings regarding PRM reassessment, project statuses, RES compliance, interconnection requests, coordination with NSPI, and forecasting capabilities. The IG also welcomes IESO-NS's potential acceptance of its recommendations.

104080Submissions - CA 2 passages
B. Trenton and Lignan Retirements p. p. 2
B. Trenton and Lignan Retirements With respect to the Trenton and Lingan coal units, the Report states: Previous 10-year load and resource outlooks presented retirements of Trenton 5 and Lingan 2 in Winter 2027/2028. Based on the current e...

AI summary The report discusses the retirement timeline for the Trenton 5 and Lingan 2 coal units, noting that they may need to remain in service until Winter 2029/2030 due to the need for reliable replacement capacity. The IESO NS highlights the need for coordination with NS Power and the lack of detailed cost information for maintaining these units.

D. Large Load Service Requests p. pp. 3-5
D. Large Load Service Requests IESO Nova Scotia has received load interconnection requests for ten proposed projects, mainly commercial and industrial, representing 855 MW of potential new load interconnected by 2029.[18](#page-4-4) Other...

AI summary IESO Nova Scotia has received large load interconnection requests totaling 855 MW, which could significantly impact system capacity and reliability. The IESO has not established formal criteria for including these requests in its load forecasts, raising concerns about potential capacity shortfalls. The Consumer Advocate recommends that IESO Nova Scotia review alternative forecasting practices that account for generation and transmission upgrades.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →