Matter: E-ENSC-R-10 - Efficiency Nova Scotia Corporation - Electricity Demand Side Management Plan for 2012A request by Efficiency Nova Scotia for approval of a $43.7 million Demand Side Management plan for the 2012 operating year.  (Also see Matter Nos. M04538 and M04539)
5 passages 4 documents

Capital Expenditures across all matters →

E-6ENSC (EAC) IR-1 to IR-43 (Revised April 6, 2011) 3/29/2011 2 passages
Context for Responses p. p. 253
is generation, are matters determined when the procurement programs are executed. 13 Stakeholder NPB Topic Fuel Suggestions/Comments Natural Gas Base Case should use NYMEX rather than PIRA. Response Forward strips are not appropriate for l...

AI summary Stakeholders are providing feedback on fuel pricing models, capital cost assumptions, and renewable energy capacity factors in the context of a regulatory proceeding. NSPI responds by emphasizing the use of long-term forecasting models, adjusting capital cost ranges, and confirming the appropriateness of on-shore wind capacity factors.

23 Stakeholder NPB p. p. 253
ground. 31 Stakeholder NSDOE Topic Emissions Suggestions/Comments 25% of renewables by 2020 doesn't net out for DSM. Response Adding pre-2001 renewables of 8.5% + 14% RES 2019, to get 22.5%, does not factor in the effect of forecast energy...

AI summary The NSDOE provided responses to stakeholder comments regarding renewable energy targets, capital cost modeling, and the differences in delta costs between IGCC and PC units. The NSDOE clarified that DSM effects must be considered in RES calculations and that capital cost models use 2008 dollars with escalation factors. The difference in delta costs is attributed to technological advancements and the nature of CO2 capture integration.

E-19Proof of Advertising 4/18/2011 1 passage
Now's the time for Beauiolais Nouveau p. pp. 3-4
Now's the time for Beauiolais Nouveau It's the third week in November, which can only mean one thing to wine buffs — the release of this year's Beaujolais Nouveau. The Nova Scotia Liquor Corp. ine Nova Scotta Liquor Corp. will offer a sele...

AI summary The document discusses the failed deployment of a $10 million demonstration turbine by Nova Scotia Power and OpenHydro, with blade damage discovered via underwater camera. The turbine, part of renewable energy efforts in the Bay of Fundy, was retrieved due to failed acoustic modems and data recovery issues. Two other test turbines are planned for 2012 by international partners including Alstom and Marine Current Turbines Ltd.

06798Undertaking U-3 4/21/2011 1 passage
Undertaking U-3
Undertaking U-3 Provide calculations similar to those in U-2 for other classes. Response U-3: The response to this Undertaking was initially filed on April 21 as Exhibit MCI-U3. This exhibit has been expanded to show the analysis on an inc...

AI summary Undertaking U-3 requests calculations similar to U-2 for other classes. The response includes an expanded exhibit (MCI-U3) analyzing energy savings from $53.4M spending ($158.5 GWh) and incremental analysis of an additional $9.7M for 34.4 GWh savings relative to ENSC's DSM Plan.

08030Efficiency Nova Scotia Corporation - Cost Allocation Methodology Report - Prepared by Elenchus Research Associates Inc. - September 2011 9/30/2011 1 passage
2 ENSC'S NEW SYSTEM OF ACCOUNTS p. pp. 3-4
2 ENSC'S NEW SYSTEM OF ACCOUNTS ENSC is in the process of implementing a new system of accounts. In this system of accounts each transaction will be coded in four ways: - 1. Account code: Each entry is assigned an account code. The account...

AI summary ENSC is implementing a new accounting system with four coding methods: account code, fund, department, and program. The system categorizes transactions into general, capital, EDSM, and PNS funds, 12 departments, and 26 programs, including subcategories like Solar (Provincial-Residential).

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →