N-1Redacted Work Order
7 passages
UARB APPROVAL SHEET Project Title: Kem pt Road Transforme r CI Number: 40425 Capital Project Authorization Head Office Use: T ATO Project Number: Final Cost Date: November 24, 2010 Location: Division: Expenditure Prof file Schedule YEAR Bu...
AI summary The document is an approval sheet for the Kempt Road Transformer project submitted by Nova Scotia Power Inc. to the Nova Scotia Utility and Review Board. The project has a total estimated cost of $1,093,699 and was submitted under section 35.
Parent CI Number Cost Centre 800 - 800-Services - Admin. Budget Version - 2010 10/02 Forecast Forecast Start 10/20/2010 Operational 08/30/2011 Final Cost 08/30/2011 2010 $280,115.30 2011 $813,584.08 Total: $1,093,699.38 Original Cost: $0.0...
AI summary The document outlines a budget forecast for the acquisition of an additional transformer at Kempt Road Substation to serve as an energized spare in case of failure. The forecast includes costs for 2010 and 2011, with a total projected cost of approximately $1,093,699.38.
Original Cost: T647 11/2/2010 201010102 Forecast Variance 1,457 10,200 34,325 15,539 2,220 2,698 785 671 0 336 0 1,342 0 16,779 7,381 5,752 1,610 920,126 11,500 805 46,000 3,237 0 0 0 10,401 0 0 0 0 535 1,093,699 Kempt Road Transformer Adm...
AI summary The document presents a detailed cost breakdown for the Kempt Road Transformer project, including various line items and activities such as design, commissioning, and field supervision. It includes original cost forecasts and variance data from 2010.
Parent CI Number Cost Centre 800 800-Services - Admin. Kempt Road Transformer Project Number T647 Approved Date 11/2/2010 Capital Item Justification Justification Criteria: Transmission Plant Sub-Criteria: Equipment Replacement Name of Rep...
AI summary The document outlines a capital item justification for the Kempt Road Transformer Project, under Cost Centre 800, approved on November 2, 2010, with the justification criteria focusing on transmission plant equipment replacement.
Why do this project? Currently there are three 138-25 kV transformers at Kempt Road Substation that supply area load. Since 2001 there have been four transformer failures at Kempt Road. Most recently there have been two transformer failure...
AI summary Three 138-25 kV transformers at Kempt Road Substation have experienced multiple failures since 2001, with two recent units removed for rewinding. The remaining transformer is at risk of failure due to high fault levels in the area, prompting a proposal to purchase a spare transformer to prevent extended power outages.
Why do this project this way? Purchasing a spare transformer will increase the capacity of the Kempt Road Substation along with providing an energized and tested spare unit in the event of a transformer failure. The remaining unit has been...
AI summary The project involves purchasing a spare transformer for the Kempt Road Substation to increase capacity and mitigate risks from potential transformer failure. The existing unit faces similar conditions, increasing its failure risk. NSPI will execute this work.
The following is a breakdown of costs associated with the Kempt Road Transfonner • Administrative Overheads and Interest $67,224 • Labour $29,120 • Materials $936,905 • Contracts $11,500 • Other $48,950 • Total $1,093,699 The major costs a...
AI summary The document provides a breakdown of costs associated with the Kempt Road Transfonner project, including administrative overheads, labour, materials, and contracts. The major costs are labour and materials, with materials primarily consisting of the Transfonner, Transfonner Oil Filtering, Surge Arrestors, and Misc. Connectors.