N-1Report 2 passages
Section 10
1 LIST OF FIGURES 2 3 Figure 1: Net System Requirement with Future DSM Program Effects (actuals not weather adjusted) ...... 7 4 Figure 2: Coincident Peak Demand and Future DSM Program Effects .................................................

AI summary The document lists figures analyzing energy system planning, including demand-side management (DSM) impacts, generating capacity forecasts, energy mix trends, utilization factors, capital investments, transmission queues, and greenhouse gas emissions. Key themes involve capacity planning, DSM program effects, and emissions compliance.

Section 72
they typically have material volume-based failure mechanisms. In contrast, 10 the UF is directly applicable to the investment associated with turbines, boilers and high energy 11 piping. Major assets are regularly reassessed in terms of th...

AI summary The text discusses investment strategies for maintaining unit reliability in thermal fleet operations, focusing on extending major outage intervals to reduce capital investment and managing risks through less intensive investment approaches. It also references a 2024 10-Year System Outlook document.

N-3NSPI (NSUARB) RIR-1 - RIR-18 4 passages
Section 20
2024 10-Year System Outlook Report (NSUARB M11764) NSPI Responses to NSUARB Information Requests NON-CONFIDENTIAL 1 Request IR-7: 2 3 On page 28 of 67, Figure 11 presents forecasted sustaining capital investments by unit in 4 graphical for...

AI summary NSPI responds to NSUARB's IR-7 request by revising sustaining capital investment forecasts, reorganizing data by plant, updating cost estimates, and noting Lingan 2's delayed retirement. Changes reflect revised utilization forecasts, condition assessments, and project-specific updates like POT gas conversion and LM6000 turbine fleet breakdowns.

Section 24
$0 $0 $0 $0 $0 $5,535,000 $10,290,716 $8,731,580 $7,372,083 $8,175,943 $13,534,597 $53,639,920 PtTupper - Gas $0 $0 $0 $0 $4,981,500 $11,319,796 $2,570,938 $1,914,276 $3,922,145 $2,444,657 $4,424,311 $31,577,623 Forecasted Sustaining Capit...

AI summary The text presents financial data and a forecasted capital investment graph for various energy generation units in Nova Scotia, including PtTupper - Gas, Lingan - Oil, Biomass, and others. It details sustaining capital investment amounts across different projects and time periods, highlighting expenditures related to gas, oil, biomass, and combustion turbine facilities.

Section 25
Lingan TuftsCove $20,000,000 $0 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2024 10-Year System Outlook Report (NSUARB M11764) NSPI Responses to NSUARB Information Requests NON-CONFIDENTIAL 1 Request IR-8: 2 3 Referencing Figure...

AI summary NSPI submitted one capital project (NS Power BESS) for Board approval in January 2024 with a $237.8M cost, while other projects in Figure 6 remain unscoped and will be submitted closer to their installation dates. The response addresses NSUARB's IR-8 request regarding capital expenditures.

Section 26
27/2028 - 2025 $940M 2 Stage 1 1F Fast Acting Gen - 300 2029/2030 - - - Stage 2 Gas Conversion 150 2028/2029 - - $39M 3, 4 (Point Tupper) 2F 3F HFO Operation - 459 2029/2030 - - $0.6M3,4 Lingan 1/3/4 14 1 N-12, UARB Approval Sheet, Nova Sc...

AI summary The document outlines capital expenditures for energy projects in Nova Scotia, including a Battery Energy Storage System (BESS) and gas conversion initiatives. It references the 2024 ACE Plan and Evergreen IRP assumptions, with costs estimated in 2022 dollars. NSPI seeks NSUARB approval for these projects, citing directional cost estimates.

N-4NSPI (SBA) RIR-1 to RIR-6 1 passage
Section 13
Path to 2030 2024 10 YSO Project Reconciliation Capacity (MW) Year Capacity (MW) Winter As indicated in the Nova Scotia Power Incorporated Battery Energy Storage System (BESS) Project Capital Cost Approval Application (M11539) two NS Power...

AI summary The Nova Scotia Power Inc. BESS Project (M11539) seeks approval for two 50 MW battery storage sites in 2025 and a third in 2026, with capacities available for winter periods. The application details implementation timelines and aligns with provincial regulatory processes under Section 4D.

95171NSUARB (NSPI) IR-1 to IR-18 2 passages
Section 9
Document: 305605 Date Filed: Aug. 27, 2024 NSUARB (NS Power) Page 3 of 6 1 2 Request IR-7: 3 On page 28 of 67, Figure 11 presents forecasted sustaining capital investments by unit in 4 graphical form. Please provide this investment informa...

AI summary The document outlines five regulatory requests (IR-7 to IR-11) directed at NS Power, seeking details on capital investments, project timelines, withdrawn PPA documentation, utilization factor usage by other utilities, and transmission study requirements. Requests focus on transparency in procurement, project approvals, and technical methodologies for system integration.

Section 14
rrently anticipated to begin in 2025 and conclude in 2027. 34 (f) NS Power expects to file a capital application for the Reliability Tie with the NSUARB 35 in Q3 2024. 36

AI summary NS Power plans to file a capital application for the Reliability Tie project with the NSUARB in Q3 2024, with the project anticipated to begin in 2025 and conclude in 2027.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →