REDACTED (CONFIDENTIAL INFORMATION REMOVED) C0070486 HYD Lower Great Brook Stoplog Replacement REDACTED December 1, 2025 REDACTED (CONFIDENTIAL INFORMATION REMOVED) NSEB APPROVAL SHEET Project Title: HYD Lower Great Brook Stoplog Replaceme...
AI summary This document is an NSEB approval sheet for the HYD Lower Great Brook Stoplog Replacement project, with details on budget amounts, project estimates, and authorization types for various years. The project is submitted by Nova Scotia Power Incorporated and approved by the Nova Scotia Energy Board.
Summary of Related CIs +/- 2 years Pursuant to Section 11.2 of the CEJC, related CIs for Hydro projects include "work completed on the same generating unit and dam structures, but not necessarily the same asset." • No other projects in 202...
AI summary The document outlines related Capital Investments (CIs) for Hydro projects under the CEJC, specifying that they include work on the same generating unit and dam structures but not necessarily the same asset. No other projects are listed for the years 2023 to 2027. The depreciation class is listed as 'Hydraulic Production Plant - Mersey River Hydro System' with an estimated asset life of 25 years.
REDACTED C0070486 Page 4 of 6 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Execution Year: 2025-2026 Unit Cost Support Description Unit Quantity Estimate Total Estimate Reference Completed Similar Projects (FP#'s) Regular Labour Hydro Maint...
AI summary The document outlines a detailed cost breakdown for various projects and activities related to hydro operations, environmental work, and other expenses, including labor, materials, travel, and administrative overhead. It includes estimates and subtotals for different categories of costs, such as labor, materials, and consulting services.
This project is being filed as a AACE Class 1 estimate. The defined deliverables for this project indicate that 100% of Class 1 deliverables are completed. A contingency value of 2% has been selected to support offsetting detailed engineer...
AI summary The project is submitted as an AACE Class 1 estimate with 100% of deliverables completed. A 2% contingency is included to address residual impacts on fish and fish habitat due to the Lower Great Brook water reservoir drawdown.
100136Letter NSPI re: Capital Items Filed Outside the Quarter Package
5 passages
December 1, 2025 Crystal Henwood Clerk of the Board Nova Scotia Energy Board 1601 Lower Water Street, 3rd Floor Halifax, NS B3J 3S3 Re: Capital Items Filed Outside the Quarter Package Dear Ms. Henwood: Enclosed for your review and approval...
AI summary A document dated December 1, 2025, addressed to Crystal Henwood, Clerk of the Board at the Nova Scotia Energy Board, includes capital items filed outside the quarter package for review and approval.
2025 ACE Plan Capital Items for Subsequent Approval • CI C0053699 – Renewable to Retail Implementation - $5,644,468 2025 ACE amount $5,062,652 $4,635,351 spent as at September 30, 2025 Technical setup work and business process updates have...
AI summary The document outlines two capital items under the 2025 ACE Plan for subsequent approval. The first involves the implementation of a renewable to retail project with remaining commissioning work pending the LRS's commercial operation date. The second relates to the replacement of a stoplog at HYD Lower Great Brook, with partial confidentiality applied to the details.
2024 ACE Plan Capital Items for Subsequent Approval • CI C0032664 – Energy Control Centre – Optimization Tools - $7,486,068 2024 ACE amount $4,329,150 $1,776,697 spent as at September 30, 2025 Non-Confidential
AI summary The document outlines capital items under the 2024 ACE Plan, including an Energy Control Centre optimization tool with a total cost of $7,486,068, of which $4,329,150 was allocated under the 2024 ACE Plan and $1,776,697 had been spent by September 30, 2025.
Final Cost (FIN) Capital Items - CI 52314 1C-GT1 and 1C-UT1 Transformer Replacement $1,678,006 Original approval received in the 2018 ACE Plan for $2,032,393 Decreased spend amount $354,387 Non-Confidential - CI 51956 6P Mobile Substation...
AI summary The document outlines two capital items with reduced spending amounts compared to their original approvals. The first is the replacement of transformers with a decreased spend of $354,387, and the second is a mobile substation rewind with a decreased spend of $880,345. Both were originally approved under the 2018 ACE Plan.
Unforeseen & Unbudgeted (U&U) Capital Items • CI C0080228 – HYD Hollow Bridge Generator Refurbishment - $2,587,170 $0 spent as at September 30, 2025 Partially Confidential
AI summary The document outlines an unforeseen and unbudgeted capital item related to the refurbishment of the HYD Hollow Bridge Generator, with a total cost of $2,587,170 and no funds spent as of September 30, 2025. The item is partially confidential.