e. The securing of resources (both 20 internal and external), opening of the EOC, and the booking of accommodations and meals had to 21 be done in advance of the storm impacting the province. 22 DATE FILED: April 1, 2026 Page 5 of 15 NS Po...
AI summary The document outlines NS Power's preparation for storm impacts, including resource allocation and EOC activation, and summarizes 2025 storm restoration costs categorized by storm levels, detailing capital and OM&G expenditures.
Total Combined Cost Category Level 1 & 2 Storms Level 3 & 4 Storms Storms Capital $561,125 $3,066,360 $3,627,485 OM&G $9,561,293 $3,222,802 $12,784,095 Total Combined Costs $10,122,419 $6,289,162 $16,411,580 7 8 Storm restoration costs are...
AI summary The document details NS Power's 2025 storm restoration costs, categorizing capital and OM&G expenses for Level 1-4 storms. Total combined costs reached $16.4 million, with Level 3 and 4 storms accounting for the majority of capital expenditures and operating expenses.
Page 6 of 15 NS Power 2025 Storm Restoration Costs Non-Confidential 1 Figure 4 is a breakdown by cost category of the types of capital and operating storm costs: 2 3 Figure 4 – Breakdown of 2025 Storm Restoration Costs by Category Total Co...
AI summary The document details NS Power's 2025 storm restoration costs, categorizing capital expenditures ($3.6M) and operating expenditures ($12.8M) across Level 1–4 storm events. Bell Contributions are noted as zero for both capital and operating costs. Total combined costs amount to $16.4M.
122,419 $6,289,162 $16,411,580 4 5 Figure 5 provides a breakdown of operating costs by account: 6 7 Figure 5 – Breakdown of 2025 Operating Storm Restoration Costs by Account Total Combined Account Level 1 & 2 Storms Level 3 & 4 Storms Stor...
AI summary The document details NS Power's 2025 storm restoration costs, breaking down operating expenses by account for Level 1-4 storms, including contracts, overtime labor, materials, and regular labor. Total combined costs for all storms reached $12,784,095, with Figure 6 addressing capital costs.
of 15 NS Power 2025 Storm Restoration Costs Non-Confidential 1 Figure 6 provides a breakdown of capital costs by account: 2 3 Figure 6 – Breakdown of 2025 Capital Storm Restoration Costs by Account Total Combined Account Level 1 & 2 Storms...
AI summary The document details NS Power's 2025 capital storm restoration costs, categorizing expenses into labor, materials, contracts, and administrative overheads. Level 3 & 4 storms incurred significantly higher costs, particularly in overtime labor and contracts. Section 4.0 emphasizes 'storm readying' and 'storm response' as key cost drivers.
Page 14 of 15 NS Power 2025 Storm Restoration Costs Non-Confidential 1 7.0 PREDICTED AND ACTUAL STORM LEVELS FOR REPORTED EVENTS 2 3 For the two Level 3 EOC activations in 2025 referenced above, December 5th and December 19th, 4 the predic...
AI summary NS Power's 2025 storm restoration report details two Level 3 EOC activations, showing significant discrepancies between predicted and actual customer impacts during storms on December 5 and December 19-20, 2025. The report includes capital expenditures incurred.