N-1CI C0044172 – L7005 Canso Crossing Vibration Mitigation - $2,431,095 - Redacted
3 passages
REDACTED CI C0044172 Page 2 of 5 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Estimated Life of the Asset: 45 years JUSTIFICATION: Justification Criteria: Transmission Plant
AI summary The document states an asset's estimated lifespan of 45 years and cites 'Transmission Plant' as the justification criteria. No further details or arguments are provided in the redacted text.
REDACTED CI C0044172 Page 3 of 5 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Capital Project Detailed Estimate Location: Transmission C0044172 CI#: L7005 Canso Crossing Vibration Mitigation Title:
AI summary The document provides a detailed estimate for a capital project related to vibration mitigation at the Canso Crossing transmission location.
Execution Year: 2023-2025 Description Unit Quantity Unit Estimate Total Estimate Cost Support Reference Completed Similar Projects (FP#'s) Regular Labour Engineering - Design PD 49 $ 452 $ 21,979 Project Management PD 52 $ 452 $ 23,591 Tec...
AI summary The document presents a detailed cost estimate for a project spanning 2023-2025, including labor, materials, and other expenses. It outlines various categories of costs, such as regular and term labor, overtime, materials, and contracts, with specific dollar amounts and quantities. The total estimated cost, including administrative overhead and capitalized interest, is provided.
N-2CI C0044172 REFILE - Redacted
5 passages
REDACTED (CONFIDENTIAL INFORMATION REMOVED) CI C0044172 Canso Crossing Vibration Mitigation REDACTED Date Revised: June 19, 2026 NSEB APPROVAL SHEET Project Title: L7005 Canso Crossing Vibration Mitigation CI Number: C0044172 Date: May 4,...
AI summary The document outlines the Canso Crossing Vibration Mitigation project, including its expenditure profile and approval status. The project, submitted by Nova Scotia Power Incorporated, has a total estimated cost of $2,431,095, with budget amounts allocated across multiple years. The Nova Scotia Energy Board approved the project on May 4, 2026.
Why do this project this way? Installation of the new dampening system provides a long-term solution to conductor vibration compared with further interventions using the originally installed dampening system which is now at end-of-life. In...
AI summary The installation of a new dampening system offers a long-term solution to conductor vibration, replacing an end-of-life system. It is more cost-effective than replacing the entire conductor section, which would cost approximately $2.5 million and still require the new dampening system.
REDACTED CI C0044172 Page 3 of 5 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Capital Project Detailed Estimate Location: Transmission C0044172 CI#: L7005 Canso Crossing Vibration Mitigation Title:
AI summary This document provides a detailed estimate for a capital project related to vibration mitigation at the Canso Crossing in the Transmission sector. The project is identified by the CI# L7005 and is part of a larger regulatory proceeding.
Execution Year: 2023-2025 Description Unit Quantity Unit Estimate Total Estimate Cost Support Reference Completed Similar Projects (FP#'s) Regular Labour Engineering - Design PD 49 $ 452 $ 21,979 Project Management PD 52 $ 452 $ 23,591 Tec...
AI summary The document presents a detailed cost estimate for a project spanning 2023-2025, including labor, materials, contracts, and overhead costs. It outlines various categories such as regular and term labor, overtime, travel, meals, materials, and capitalization of interest, with a total estimate of $2,431,095 when including administrative overhead and AFUDC.
Applicable (NA) NR NR/S Not Applicable (NA) NR NR Not Applicable (NA) NR NR Total # Deliverables for this 10 26 27 27 27 Project % Defined/Complete 100% 100% 100% 100% 100% towards Class Estimate
AI summary The document contains a table with project deliverables, completion percentages, and other project-related metrics. The table appears to be related to infrastructure or capital improvement planning, though specific context is limited.
101854Letter NSPI re:First Quarter 2026 Capital Items
6 passages
May 4, 2026 Crystal Henwood Clerk of the Board Nova Scotia Energy Board 1601 Lower Water Street, 3rd Floor Halifax, NS B3J 3S3 Re: First Quarter 2026 Capital Items Dear Ms. Henwood: Enclosed for your review and approval are the following c...
AI summary A letter dated May 4, 2026, submitted to Crystal Henwood, Clerk of the Board at the Nova Scotia Energy Board, encloses capital items for first-quarter 2026 review and approval. The document requests formal consideration of these items by the Board.
2026 ACE Plan Capital Items for Subsequent Approval - CI C0061552 L6043 Replacements and Upgrades- $3,603,351 2026 ACE amount $2,457,629 $0 spent as at December 31, 2025 Non-Confidential - CI C0082133 IT-Renew Microsoft Enterprise Agreemen...
AI summary The document lists three capital items under the 2026 ACE Plan requiring subsequent approval, including project IDs, total costs, allocated ACE funds, and spending status as of December 31, 2025. All items show $0 spent to date, with varying confidentiality designations.
Unforeseen & Unbudgeted (U&U) Capital Items • CI C0080150 – TUC1 HP Turbine Refurbishment - $2,527,606 $2,527,606 spent as at December 31, 2025 Partially Confidential - CI C0083589 IR751 Brooklyn Community Solar $0 $0 spent as at December...
AI summary The document lists two Unforeseen & Unbudgeted (U&U) capital items: a $2.5 million turbine refurbishment (CI C0080150) fully spent by December 2025, and two zero-cost community solar projects (CI C0083589, CI C0083591) with no expenditures as of December 31, 2025. Both entries are marked as partially confidential.
Planned & Advanced (P&A) Capital Items • CI C0044172 – L7005 Canso Crossing Vibration Mitigation - $2,431,095 $2,431,095 spent as at December 31, 2025 Partially Confidential
AI summary The document lists a completed capital project (CI C0044172) for vibration mitigation at Canso Crossing, costing $2.43 million, fully spent by December 31, 2025, with partial confidentiality applied.
Capital Reports NS Power is working to compile its Q1 capital reports, and expects to file them in the coming weeks.
AI summary NS Power is compiling its Q1 capital reports and expects to file them in the coming weeks, indicating ongoing regulatory compliance and transparency efforts.
2010 ACE Plan Directive The Board's Order dated May 11, 2010, included the following directive: …a process whereby the Board will be informed in advance, to the extent possible, of proposed Unforeseen and Unbudgeted ("U&U") expenditures, t...
AI summary The Board's 2010 directive requires advance notification of Unforeseen and Unbudgeted (U&U) expenditures, their justification, and project updates. NS Power reports no such expenditures requiring approval at this time, as stated by Manager Lana Myatt.