Topic/Matter Intersection

Topic:"Capital Expenditures" in M13125

Matter: Nova Scotia Power Inc. - CI 49595 – HYD Tusket Unit 1 Overhaul - $3,016,690 & CI C0040106 – HYD Tusket Unit 1 Generator Refurbishment - $2,331,683
25 passages 9 documents

Capital Expenditures across all matters →

N-1CI 49595 – HYD Tusket Unit 1 Overhaul - Application - Redacted 7 passages
REDACTED (CONFIDENTIAL INFORMATION REMOVED)
REDACTED (CONFIDENTIAL INFORMATION REMOVED) CI 49595 HYD Tusket 1 Overhaul REDACTED October 5, 2026 REDACTED (CONFIDENTIAL INFORMATION REMOVED) NSEB APPROVAL SHEET Project Title: HYD Tusket Unit 1 Overhaul CI Number: 49595 Date: October 5,...

AI summary This document is an NSEB approval sheet for the HYD Tusket Unit 1 Overhaul project, detailing expenditure profiles from 2019 to 2028, including budget amounts, project estimates, and authorization types for each year. The project was submitted by Nova Scotia Power Incorporated and approved by the Nova Scotia Energy Board on October 5, 2026.

Pursuant to Section 11.2 of the CEJC, related CIs for Hydro projects include "Work completed on the same generating unit and dam structures, but not necessarily the same asset."
Pursuant to Section 11.2 of the CEJC, related CIs for Hydro projects include "Work completed on the same generating unit and dam structures, but not necessarily the same asset." • 2024-2025 CI C0073168 HYD TUS PH Fish Passage $949,804 • 20...

AI summary The text references Section 11.2 of the CEJC, which defines related Capital Items (CIs) for Hydro projects as work completed on the same generating unit and dam structures, even if not on the same asset. It lists several CIs with associated project names, timeframes, and costs, along with a depreciation class for the Tusket Hydraulic Production Plant.

Capital Project Detailed Estimate
Capital Project Detailed Estimate Execution Year: 2026-2027 Cost Support Completed Similar Description Unit Quantity Unit Estimate Total Estimate Reference Projects (FP#'s) Hydro River Staff - Construction Regular Labour PD 915 $ 417 $ 381...

AI summary The document presents a detailed estimate for a capital project, including labor, materials, contracts, and overhead costs. The total estimated cost is $3,016,690, with $1,180,143 as the original cost. The estimate includes various line items such as labor, travel, materials, and contingency costs.

CI 49595 Attachment 1 Page 9 of 28 REDACTED (CONFIDENTIAL INFORMATION REMOVED)
CI 49595 Attachment 1 Page 9 of 28 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Lower wicket gate ring to throat has cracks 80% around. See chipped paint area above stainless steel. Wheel pit Liner / head cover Flange- The wheel pit liner i...

AI summary The text describes the condition of a wheel pit liner, noting significant corrosion, rust, and potential lead paint. It mentions the liner's age, previous repairs in 1964, and the need for blasting, thickness tests, repairs, and repainting.

TOTAL CONTRACT VALUE: $ (CAD)
TOTAL CONTRACT VALUE: $ (CAD) PRELIMINARY ENGINEERING ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE 1 CONDITION ASSESSEMENT 1 LOT $ $ - TURBINE SHAFT ASSEMBLY EQUIPMENT SUPPLY ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE 2 UPGRADED...

AI summary The text presents a table of preliminary engineering, equipment supply, and field services items with descriptions, quantities, units, and pricing. It includes a section on additional pricing for budgetary purposes, though specific values are not provided.

The budgetary pricing below has been included for further consideration. Costs and associated schedule impacts are subject to adjustment upon evaluation at the time of request.
The budgetary pricing below has been included for further consideration. Costs and associated schedule impacts are subject to adjustment upon evaluation at the time of request. PRELIMINARY ENGINEERING (NOT INCLUDED IN TOTAL CONTRACT PRICE)...

AI summary The text includes preliminary engineering and equipment supply items with associated costs and schedule impacts that may be subject to adjustment. These items are not included in the total contract price and are presented for further consideration.

REDACTED CI 49595 Attachment 6 Page 13 of 22 REDACTED (CONFIDENTIAL INFORMATION REMOVED)
REDACTED CI 49595 Attachment 6 Page 13 of 22 REDACTED (CONFIDENTIAL INFORMATION REMOVED) PROJECT NAME Tusket Powerhouse Scroll Case Concrete Repair NUMBER 251166 Page 1 of 1 CLIENT Nova Scotia Power Incorporated (NSPI) SUBJECT OPCC Class C...

AI summary This document outlines the details of a concrete repair project at the Tusket Powerhouse Scroll Case, including labor, materials, and cost estimates. It includes quantities, unit rates, and a contingency for the project, which is being prepared by Nova Scotia Power Incorporated.

N-2CI C0040106 – HYD Tusket Unit 1 Generator Refurbishment - Application - Redacted 7 passages
REDACTED (CONFIDENTIAL INFORMATION REMOVED)
REDACTED (CONFIDENTIAL INFORMATION REMOVED) CI C0040106 HYD Tusket 1 Generator Refurbishment REDACTED October 5, 2026 REDACTED (CONFIDENTIAL INFORMATION REMOVED) NSEB APPROVAL SHEET Project Title: HYD Tusket Unit 1 Generator Refurbishment...

AI summary This document is an NSEB approval sheet for the HYD Tusket Unit 1 Generator Refurbishment project, detailing the expenditure profile and financial information for the project from 2019 to 2028. The project was separated from CI 49595 to better capture investment in distinct assets. The total budget and project estimate are outlined, with approvals and signatures provided.

Preamble
CI Number: C0040106 Title: HYD Tusket 1 Generator Refurbishment Start Date: 2026/08 In-Service Date: 2027/12 Final Cost Date: 2028/12 Function: Hydro Forecast Amount: $2,331,683

AI summary This document outlines the CI Number C0040106 for the HYD Tusket 1 Generator Refurbishment project, which is scheduled to start in August 2026, become operational in December 2027, and have its final cost determined by December 2028. The project's function is hydroelectric, and the forecasted amount is $2,331,683.

Pursuant to Section 11.2 of the CEJC, related CIs for Hydro projects include "Work completed on the same generating unit and dam structures, but not necessarily the same asset."
Pursuant to Section 11.2 of the CEJC, related CIs for Hydro projects include "Work completed on the same generating unit and dam structures, but not necessarily the same asset." • 2024-2025 CI C0073168 HYD TUS PH Fish Passage $949,804 • 20...

AI summary The document outlines several capital investments (CIs) related to Hydro projects in Nova Scotia, including fish passage improvements, stator and crane refurbishments, and powerhouse and dam repairs, with associated costs and timelines. These projects are categorized under the depreciation class 'Hydraulic Production Plant - Tusket.'

Contingency Statement
Contingency Statement Contingency for this project has been determined using a combination of internal subject matter expert (Professional Engineers) judgment, previous experience with hydro unit generator refurbishment projects, as well a...

AI summary The contingency for the project is set at 20 percent, based on expert judgment and previous experience. It covers unforeseen repairs and cost increases related to hidden defects discovered during disassembly and detailed inspection of the rotor, stator, and exciter.

Location: Hydro CI#: C0040106
Location: Hydro CI#: C0040106 Description Unit Quantity Unit Estimate Total Estimate Cost Support Reference Completed Similar Projects (FP#'s) Hydro River Staff - Construction Regular Labour PD 613 $ 417 $ 255,460 Engineering Staff PD 87 $...

AI summary The document outlines cost estimates for various labor, materials, and services related to a hydro project, including overtime labor, travel expenses, materials, commissioning support, meals, equipment rental, freight, contingency, interest capitalization, and administrative overhead. The total estimated cost is $2,331,683.

Document No: XXX-XX-XXXX-XXXX
Document No: XXX-XX-XXXX-XXXX Project Cost Estimate Input Checklist and Maturity Matrix Hydropower Required fields: Estimate Classification Project Name: HYD TUS 1 Generator Refurbishment Started or Preliminary Class 5 Class 4 Class 3 Clas...

AI summary The document outlines a project cost estimate input checklist and maturity matrix for the HYD TUS 1 Generator Refurbishment hydropower project. It details the project's scope, capacity, location, requirements, technology, strategy, planning, and decommissioning aspects, along with their defined or preliminary status.

Exciter Pricing breakdown
Exciter Pricing breakdown Item Description Lump Sum (CAD) Baseline test, cleaning/drying set up, one cleaning cycle, inspection 1 and re-test 2 Turning and undercutting including mandrel Replace brushes and brush holders and provided spare...

AI summary The document provides a detailed breakdown of the costs associated with the refurbishment and maintenance of exciters, including items such as baseline testing, cleaning cycles, brush replacements, and mandrel fabrication. The breakdown is submitted by Wajax as part of the project requirements.

103828Hearing Order 2 passages
IN THE MATTER OF the PUBLIC UTILITIES ACT
IN THE MATTER OF the PUBLIC UTILITIES ACT -and- IN THE MATTER OF an application by NOVA SCOTIA POWER INCORPORATED for the approval of Capital Work Orders CI 49595 – HYD Tusket Unit 1 Overhaul - $3,016,690 & CI C0040106 – HYD Tusket Unit 1...

AI summary This proceeding involves Nova Scotia Power Incorporated's application for the approval of two capital work orders related to the overhaul and generator refurbishment of the HYD Tusket Unit 1, with associated costs of $3,016,690 and $2,331,683 respectively.

HEARING ORDER
HEARING ORDER Nova Scotia Power Incorporated (NS Power) applied to the Nova Scotia Energy Board on October 5, 2026, for approval of Capital Work Orders CI 49595 – HYD Tusket Unit 1 Overhaul - $3,016,690 & CI C0040106 – HYD Tusket Unit 1 Ge...

AI summary Nova Scotia Power Incorporated (NS Power) has applied for approval of two Capital Work Orders related to the overhaul and refurbishment of the HYD Tusket Unit 1. The Nova Scotia Energy Board has set a timetable for the proceeding, which will be conducted as a paper hearing, with the possibility of conversion to an oral hearing if needed.

103793Letter NSPI re: Capital Items Filed Outside the Quarter Package & Request for Confidentiality 4 passages
Preamble
October 5, 2026 Crystal Henwood Clerk of the Board Nova Scotia Energy Board 1601 Lower Water Street, 3rd Floor Halifax, NS B3J 3S3 Re: Capital Items Filed Outside the Quarter Package Dear Ms. Henwood: Enclosed for your review and approval...

AI summary A document dated October 5, 2026, from an individual named Crystal Henwood, Clerk of the Board at the Nova Scotia Energy Board, is sent to Ms. Henwood regarding capital items filed outside the quarter package for review and approval.

2026 ACE Plan Capital Items for Subsequent Approval
2026 ACE Plan Capital Items for Subsequent Approval - CI 49595 HYD Tusket Unit 1 Overhaul $3,016,690 2026 ACE amount $5,649,954 $785,961 spent as at August 31, 2026 Partially Confidential - CI C0040106 HYD Tusket Unit 1 Generator Refurbish...

AI summary The document outlines two capital items related to the 2026 ACE Plan, specifically the overhaul and generator refurbishment of HYD Tusket Unit 1, including their respective costs and spending status as of August 31, 2026.

Unforeseen & Unbudgeted (U&U) Capital Items
Unforeseen & Unbudgeted (U&U) Capital Items - CI C0085287 IT Cybersecurity Standard Integrated Platform Program $1,941,520 $720,659 spent as at August 31, 2026 Partially Confidential - CI C0086325 Maritime Launch Services $0 $7,380,183 spe...

AI summary The text lists two unforeseen and unbudgeted capital items, including a cybersecurity standard integrated platform program and maritime launch services, with associated costs and spending details as of August 31, 2026.

Request for Confidentiality
Request for Confidentiality Pursuant to Rule 12 of the Board Regulatory Rules, NS Power requests confidential treatment of certain portions of the material filed in support of the following Capital Work Orders: - 1. CI C0086325 Maritime La...

AI summary NS Power is requesting confidential treatment for portions of documents related to four Capital Work Orders, citing Rule 12 of the Board Regulatory Rules. The request includes details about various projects, including cybersecurity and generator refurbishment.

103828Hearing Order 1 passage
HEARING ORDER
HEARING ORDER Nova Scotia Power Incorporated (NS Power) applied to the Nova Scotia Energy Board on October 5, 2026, for approval of Capital Work Orders CI 49595 – HYD Tusket Unit 1 Overhaul - $3,016,690 & CI C0040106 – HYD Tusket Unit 1 Ge...

AI summary Nova Scotia Power Incorporated (NS Power) has applied for approval of two Capital Work Orders related to the overhaul and refurbishment of the HYD Tusket Unit 1. The Nova Scotia Energy Board has decided to conduct the proceeding via a paper hearing, with specific deadlines for notices, information requests, and submissions.

103831Confidential Undertaking 1 passage
NOVA SCOTIA ENERGY BOARD
NOVA SCOTIA ENERGY BOARD IN THE MATTER OF: The Public Utilities Act , R.S.N.S. 1989, c.380 as amended - and - IN THE MATTER OF: M13125 An Application by Nova Scotia Power Incorporated "NS Power" for approval of Capital Work Orders CI 49595...

AI summary The Nova Scotia Energy Board is considering an application by Nova Scotia Power Incorporated for approval of capital work orders related to the refurbishment of the HYD Tusket 1 generator.

103833Notice of Intervention - IG 1 passage
NOVA SCOTIA ENERGY BOARD
NOVA SCOTIA ENERGY BOARD IN THE MATTER OF: The Public Utilities Act IN THE MATTER OF: An Application by Nova Scotia Power Incorporated for the approval of Capital Work Orders CI 49595 – HYD Tusket Unit 1 Overhaul - $3,016,690 & CI 0040106...

AI summary Nova Scotia Power Incorporated has applied for the approval of two capital work orders related to the overhaul and generator refurbishment of Unit 1 at the HYD Tusket facility, with total costs of $3,016,690 and $2,331,683, respectively.

103852Notice of Intervention - SBA 1 passage
NOVA SCOTIA ENERGY BOARD
NOVA SCOTIA ENERGY BOARD IN THE MATTER OF: The Public Utilities Act - and - IN THE MATTER OF: An application by Nova Scotia Power Incorporated for the approval of Capital Work Orders CI 49595-HYD Tusket Unit 1 Overhaul - $3,016,690 & CI C0...

AI summary This document pertains to an application by Nova Scotia Power Incorporated for the approval of capital work orders related to the overhaul and generator refurbishment of Tusket Unit 1, with associated costs of $3,016,690 and $2,331,683 respectively.

103947Notice of Intervention - CA 1 passage
NOVA SCOTIA ENERGY BOARD
NOVA SCOTIA ENERGY BOARD IN THE MATTER OF: the PUBLIC UTILITIES ACT - and - IN THE MATTER OF: an application by NOVA SCOTIA POWER INCORPORATED for the approval of Capital Work Orders CI 49595 – HYD Tusket Unit 1 Overhaul - $3,016,690 & CI...

AI summary Nova Scotia Power Inc. has applied for approval of two capital work orders related to the refurbishment of the HYD Tusket Unit 1 generator, with total costs of $5,348,373. The application is under the Public Utilities Act.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →