22 2.1 Thermal Assets - 24 NS Power seeks to securitize $740.6 million, consisting of the unrecovered net book value of - 25 thermal generation assets within the scope of the DDA as at December 31, 2025, together with - 26 deferred financi...
AI summary NS Power is seeking to securitize $740.6 million, which includes the unrecovered net book value of thermal generation assets as of December 31, 2025, and deferred financing costs from May 1, 2026, to November 30, 2026, calculated at a 6.59% WACC. This approach aligns with the 2026-2027 GRA and excludes costs already recovered through customer rates to avoid duplication.
13 Figure 3: Estimate of Upfront Financing Costs Cost Type Estimated Upfront Financing Costs Underwriting Fees $5,000,000 Capital Reserve Account Funding (0.5% of principal) 5,000,000 Legal Fees 1,500,000 Rating Agency Fees 825,000 Account...
AI summary Figure 3 presents an estimate of upfront financing costs, including underwriting fees, legal fees, and other expenses, totaling $12.5 million. These costs are associated with the financing of capital projects and are likely relevant to regulatory considerations regarding capital expenditures and cost recovery.
SPECIAL CONDITIONS (1) Metering will normally be at the low voltage side of the transformer. Should the customer's requirements make it necessary for the Company to provide primary metering, then the customer will be required to make a cap...
AI summary The special condition outlines that metering is typically installed on the low voltage side of the transformer. If primary metering is required, the customer must contribute to the additional capital cost incurred by the company.
(a) Operating, Maintenance, and Capital (full charge)
AI summary The text references 'Operating, Maintenance, and Capital (full charge)', which likely pertains to cost categorization in regulatory proceedings, involving full charges for operating, maintenance, and capital expenses.
(a) Operating, Maintenance, and Capital (full charge)
AI summary The text references 'Operating, Maintenance, and Capital (full charge)', indicating a category of costs related to operations, maintenance, and capital expenditures that are fully charged.
(1) Incandescent (a) Operating, Maintenance, and Capital (full charge)
AI summary This section outlines the operating, maintenance, and capital full charge costs associated with incandescent lighting.
(a) Operating, Maintenance, and Capital (full charge)
AI summary The text refers to Operating, Maintenance, and Capital (full charge), which likely relates to cost categories in utility regulation, including operational and capital expenditures.