N-1Application - Redacted
5 passages
2 3 The proposed EBS and SS tariff administration charges include the recovery of retail costs forecast 4 to be incurred in 2027 and mark the commencement of a long-term recovery of deferred costs associated with the development of the RtR...
AI summary The document outlines the proposed EBS and SS tariff administration charges, which are designed to recover retail costs forecast for 2027. These charges initiate a long-term recovery of deferred costs related to the development of the Real-Time (RtR) market and its billing systems. Specific costs include approximately $5.7 million in capital investments over ten years (including financing), $1.5 million in deferred regulatory costs from proceeding M06214, ongoing market support costs, software licensing, and dedicated operational and customer support resources.
CLASS : TOTAL COMPANY RATE BASE COSTS (Source Exh 6) Variable Fixed Unit Cost Fuel Operating Capital Return Total Total Cost Units Sold Demand Energy Customer Generation (1) Usage (Energy) $1,467,999 $646,117 $72,066 $111,286 $51,027 $234,...
AI summary The document provides a detailed cost breakdown for the 'Total Company' class, outlining the rate base, costs, and unit costs associated with generation, transmission, distribution, and retail services. It categorizes variable and fixed costs (including fuel, operating, capital, and return) across various service components like usage, reliability, and customer services. The data establishes unit costs for different delivery methods and retail categories, concluding with a total cost and unit cost calculation for the 2027 Annual Adjustment Rate (AAR) period.
Biomass Calculations ($ in millions) 2027 Capital Fuel Operating Total 54.6 100.0% Data from M05473 Exhibit N-3 CA IR-065P Confidential from the COSS Proceeding
AI summary The document provides a high-level breakdown of biomass fuel capital costs for the year 2027. It specifies that the total capital cost for biomass fuel is $54.6 million, representing 100.0% of the total capital expenditure for that specific category. The data is sourced from the COSS Proceeding and is noted as confidential.
Annual Peak of ATL 2,347,983 Annual Energy Requirement of ATL 10,656,168,727 System Coincident Load Factor 51.81% Rate Base Average 2026 2027 Steam Plant $ 458,622 $ 419,903 $ 497,342 Steam Plant - CWIP Steam Environmental & Fuel Conversio...
AI summary The text provides a detailed breakdown of the Rate Base for various power generation assets, including Steam, Hydro, Wind, Gas Turbine, and LM6000 plants, as well as ECEI Batteries. It presents financial figures for the average period, 2026, and 2027, specifically highlighting the capital values and Construction Work in Progress (CWIP) for each facility. Additionally, it notes the system's coincident load factor of 51.81% and the annual energy requirement for ATL.
SPECIAL CONDITIONS - (1) The Port Authority owns and is responsible for the maintenance and operation of all electrical equipment required for the supply of port electricity to docked ships other than the meters and metering transformers s...
AI summary The document outlines special conditions for electricity supply to docked ships at the Port Authority. It defines ownership and maintenance responsibilities for electrical equipment and meters between the Port Authority and NSPI. Key requirements include the Port Authority's obligation to provide trained staff for interconnection, the submission of a two-year vessel demand schedule, and the customer's responsibility for capital costs associated with special metering or primary metering. It also specifies technical requirements for power factor maintenance and transformer loss adjustments.