N-1Application - Redacted 8 passages
Category Cost Category p. pp. 64-65
d inflation rate. The 2% inflation rate was sourced from NSP's IRP, while the 6.65% WACC was taken from NSP's 2024 WACC and AFUDC Rates for 2025 Application (Matter No. 11990, approved 31 May 2025). 66 A third category of NSP-built generat...

AI summary The text outlines the methodology for analyzing various cost categories for Nova Scotia's electricity system between 2026 and 2050. It specifies the use of a 2% inflation rate and a 6.65% WACC from NSP's 2024 application. Key categories discussed include Transmission CapEx (annualized over asset life), Production costs (variable costs like fuel, excluding capital), and Carbon emissions value (calculated based on carbon tax, policy exemptions, and the federal carbon price). It also notes that certain NSP-built generation CapEx is excluded due to its stable nature during the IESO transition.

(7) Scaling effect from independent system operation: increased entry in competitive procurement p. p. 74
ed at 1:1 assuming wind displaces generation from a simple-cycle gas turbine. (11) Indirect benefit from control room improvements: avoided carbon costs from more advanced system planning 4.55 New system planning pathways unlocked by contr...

AI summary The text discusses the indirect benefits of control room improvements, specifically the potential to avoid carbon costs through more advanced system planning. These improvements may unlock new planning pathways that reduce the construction and operation of carbon-intensive resources. The expected savings in carbon emissions are projected to be between 5-15% starting in 2029, following the completion of the first IESO-produced Integrated Resource Plan (IRP).

Section 569 p. p. 82
4.74 If carbon emissions are not shielded by any policy exemptions and priced at the federal carbon price, updated in May 2026, the value of avoided carbon is over twice as high, with a total midpoint of $684 million compared to $312 milli...

AI summary The text quantifies the financial impact of carbon pricing on the project's value. It highlights that if carbon emissions are subject to the federal carbon price (updated in May 2026) without policy exemptions, the value of avoided carbon reaches a midpoint of $684 million. This is more than double the $312 million value calculated under a scenario where policy shields are applied.

Table 4-3: Quantification of different methods for IESO transition benefits related to avoided carbon costs, midpoint and range, $m 2025 [88](#page-82-2) p. p. 82
Table 4-3: Quantification of different methods for IESO transition benefits related to avoided carbon costs, midpoint and range, $m 2025 [88](#page-82-2) Benefit (CADm) Full-priced carbon Carbon emissions policy shield (4) Avoided carbon c...

AI summary The provided text presents Table 4-3, which quantifies different methods for calculating IESO transition benefits related to avoided carbon costs for the year 2025. It compares two methodologies: 'Full-priced carbon' and 'Carbon emissions policy shield.' The benefits are categorized into three areas: accelerated deployment of resources, control room improvements, and more advanced system pathways, with figures provided as midpoints and ranges in millions of Canadian dollars.

Generation CapEx p. p. 96
Generation CapEx - A3.1 Capacity additions (MW) are informed by two primary sources: (1) NSP's 2025 10-Year Outlook for the 2026-2035 period; and (2) the 2023 Evergreen IRP additions from the CE1-E1-R2 scenario for the remaining period up...

AI summary The document outlines the methodology for determining generation capital expenditures (CapEx) for the 2026-2035 period. Capacity additions are derived from Nova Scotia Power's 2025 10-Year Outlook and the 2023 Evergreen Integrated Resource Plan (IRP). The analysis excludes CapEx for non-emitting, dispatchable resources (e.g., nuclear, carbon capture, green hydrogen) due to uncertainty. Capital costs per technology are based on a weighted mixture of EIA, NREL, and Lazard estimates, excluding financing costs.

Carbon emissions p. pp. 104-105
Carbon emissions - A3.11 Expected system carbon emissions and generation are sourced from the same primary confidential data source provided to us by the IESO. For calculations involving accelerated deployment, we calculate and shift only...

AI summary The text outlines the methodology for calculating expected system carbon emissions and avoided carbon values. It notes that carbon intensity per unit of electricity is used to model accelerated deployment while keeping total generation fixed as a demand proxy. It specifies the federal carbon price escalator from 2026 to 2040 and acknowledges that current planning documents may not reflect changes in dispatch due to updated price signals. Additionally, it accounts for emissions shielded from taxation under the provincial Output-Based Pricing System (OBPS) performance standards.

(4) Avoided carbon costs from accelerated deployment p. p. 107
(4) Avoided carbon costs from accelerated deployment - A5.15 A delay in the reduction in carbon emissions in the VIU case (while holding annual MWh production constant), will result in overall higher carbon emissions across the 2026-2050 p...

AI summary The text describes the methodology for calculating avoided carbon costs resulting from delays in the deployment of generation and transmission infrastructure. The analysis assumes that delays in the VIU case will lead to higher overall carbon emissions between 2026 and 2050. The calculation involves estimating the percentage of emissions subject to the Output-Based Pricing System (OBPS), applying Remaining Present Value (RPV) to emissions with and without delays, and multiplying by the federal carbon price trajectory while holding system demand constant.

Phase 2: Independent system operation p. pp. 107-110
ther reductions in production costs unlocked by more advanced planning enabled by control room improvements are calculated as incremental benefits beyond the savings from control room improvements as: (RPV expected production costs $ ×(1-E...

AI summary The document outlines the methodology for calculating the Remaining Present Value (RPV) of various benefits associated with independent system operation, specifically focusing on production costs, capital expenditures (CapEx), and carbon emissions. It details how to quantify incremental benefits from control room improvements and advanced system planning. Additionally, it explains the calculation for avoided carbon costs, including the estimation of emissions subject to the Output-Based Pricing System (OBPS) and the annual value of carbon emissions based on carbon-equivalent intensity.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →