N-4NSPI (NSEB) RIR 1 to 9 2 passages
1 Request IR-1: p. p. 7
NON-CONFIDENTIAL 1 Request IR-1: 11 (b) Please provide a table with the 12 CNMP Participant Agreements that had a service 12 level for execution exceeding 15 business days in 2025 with the following headings: 13 14 (i) Application ID 15 (i...

AI summary The document details the response to a request for information regarding the Commercial Net Metering Program (CNMP) Participant Agreements with processing times exceeding 15 business days in 2025. It includes a table of eight applications with their statuses and processing times, highlighting the application IDs, dates, and system status.

8 \ \ Medium industrial rate class excluded due to insufficient data during the AMI sample year (2024). p. pp. 8-9
8 \ \ Medium industrial rate class excluded due to insufficient data during the AMI sample year (2024). 1 Request IR-7: 2 3 In Reference to Appendix A, worksheet 2025 CNMP Summary, regarding the costs of 4 additional upgrades from the Prel...

AI summary The text discusses two requests related to the Commercial Net Metering Program (CNMP) and NS Power's response. It asks about the costs of upgrades and whether NS Power provided recommendations to customers to avoid or reduce upgrade costs. NS Power responds that no network upgrades were required for the referenced Class 2 CNMP interconnection requests.

102345Submission - SBA 1 passage
Hosting Capacity Map p. p. 0
Hosting Capacity Map The need for a hosting capacity map was identified several years ago in other matters 1 but updates to the hosting capacity map have been paused due to the 2025 cybersecurity breach2. The SBA respectfully submits that...

AI summary The SBA emphasizes the importance of restoring the hosting capacity map and enabling bi-directional billing through AMI meters to support the CNMP program. NS Power has committed to reconfiguring AMI meters by June 30, 2026, and restoring GIS service by May 31, with a public hosting capacity map to be published by June 15-26, 2026, and finalized by Q4 2026.

103105Board letter re: Accepted as filed 1 passage
Service Standards
Service Standards NS Power reported achieving four of its six Class 1 service standards for the CNMP. Specifically, both performance metrics within the Finalization & Authorization category were not achieved in 2025. Following the 2024 Rep...

AI summary NS Power did not meet two of its service standards for the Commercial Net Metering Program (CNMP) in 2025, citing delays caused by a cybersecurity incident. The 'Execution of the CNMP Participant Agreement' and 'Account Setup' standards were not met, with the former showing improvement from 2024 and the latter impacted by a bi-directional meter installation issue.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →