M12783 – Nova Scotia Power Inc. – Regulation 3.6 – 2025 Net Metering Report The Board has reviewed Nova Scotia Power Incorporated's (NS Power) Net Metering Report filed March 31, 2026, for the 2025 calendar year. The Board members consider...
AI summary The Board reviewed NS Power's 2025 Net Metering Report, noting a significant increase in net metering customers, primarily residential, with solar being the sole technology used. Halifax County led in new installations, and the Electricity Act was updated in 2022 to allow customers to install renewable generators up to 27 kW without NS Power contracts.