April 22, 2026 VIA EMAIL Ms. Crystal Henwood Clerk of the Board Nova Scotia Energy Board 1601 Lower Water Street, 3rd Floor Halifax NS B3J 3 S3 Dear Ms. Henwood: Re: M12778 -Nova Scotia Power Inc., Annual Interconnection Processes Proceedi...
AI summary Nova Scotia Power Inc. (NS Power) submitted its second Annual Interconnection Processes Proceeding Report (M12778) to the Nova Scotia Energy Board, complying with directives from prior proceedings (M10905, M12174). The report addresses annual updates on the Commercial Net Metering Program and impacts of lower capacity thresholds on interconnection customers. The Board also directed NS Power to justify a proposed cost allocation methodology for distribution network upgrades, aiming to minimize financial barriers for interconnection customers.