N-1Report
2 passages
tia. 23 24 7.2.3 2022 Bulk Electric System Exception Requests 25 26 Since the filing of the 202110 Year System Outlook Report, no new BES Exception Requests 27 have been received. 28 DATE FILED: June 30, 2022 Page 48 of 60 2022 10-Year Sys...
AI summary The document references a 2022 10-Year System Outlook Report and discusses Bulk Electric System (BES) compliance gaps identified in a 2015 application. The NSUARB ordered NSPI to address these gaps within five years and to report on their status annually. Some gaps have been corrected or deemed no longer required based on current BES status.
he compliance gaps identified above or determined the compliance 22 is no longer required based on the current BES status of the transmission bus in question: 23 24 a) 14H-Burnside and 83S-VJ: 25 Disturbance monitoring equipment is no long...
AI summary The document identifies compliance gaps related to disturbance monitoring equipment at specific transmission buses, noting that such equipment is no longer required as the generators are not connected to BES buses. The text is part of a 2022 10-Year System Outlook filing.
Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →