Section 33
1 3.1.1 Maximum Unit Capacity Rating Adjustments 2 3 As a member of the Maritimes Area of the Northeast Power Coordinating Council (NPCC), NS 4 Power meets the requirement for generator capacity verification as outlined in North American 5...
AI summary NS Power complies with NERC standards for generator capacity verification, updates unit capacities annually, and addresses Mersey Hydro redevelopment needs due to infrastructure degradation, adjusting reliability metrics in the Evergreen IRP study.