Matter: NSPI Complaint - Power Connection - Roseview Developments Inc.
2 passages 1 document

Compliance Legislation across all matters →

98234Complainant Submission - Nova Scotia Power Inc. Utility Service Requirements 2023 Edition - Effective May 1, 2023 2 passages
13.3 General Installation Details and Arrangements p. p. 16
13.3 General Installation Details and Arrangements - 1) All Installation design and details are to comply with NSPI standard drawings. - 2) The developer and NSPI will establish the exact location of the URD box in the field. - 3) Final gr...

AI summary This section outlines installation requirements for URD boxes, emphasizing compliance with NSPI standards, coordination with utilities, and access protocols. It specifies that final grading should be determined before installation, proper clearances must be maintained, and access to URD boxes is restricted to qualified electricians with NSPI approval.

14.2 Customer Responsibilities p. p. 25
14.2 Customer Responsibilities - 1) The customer shall provide NSPI with site drawings and an estimate of connected electrical load at the earliest possible stage of planning. This will permit the Utility to determine an acceptable method...

AI summary This section outlines the responsibilities of customers when connecting to Nova Scotia Power Inc.'s electrical services, including providing site drawings, obtaining permits, meeting service requirements, and maintaining equipment. The customer must also ensure proper installation and compliance with inspection authorities.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →