Topic:"Contract Terms" in M03083

Matter: CI# 38834 - P-128.10 - NSPI WO - TRE5 - Turbine Upgrades LP/IP/HP - $5,202,549
2 passages 1 document

Contract Terms across all matters →

N-1Redacted Work Order 4/30/2010 2 passages
8.0 Emergent Work. Prolect Extension Time; p. p. 22
8.0 Emergent Work. Prolect Extension Time; Any emergent and discovery work required to the HP & IP spindles as Identified during the contract workscop& and does not form part of the contract workscope will be extra to the above workscope a...

AI summary The text outlines procedures for handling emergent and discovery work related to HP & IP spindles, specifying that such work will be extra to the original contract scope and requires approval via the Strip Down Inspection document (SDIR) and a firm purchase order. Delays in the SDIR approval process may result in project schedule delays and additional costs.

7.0 Site Access Training p. p. 26
7.0 Site Access Training Any waiting time Incurred by SIemens personnel between sIte access trafnlng and SIemens Initiation of work will be billed on a time and material basis In accordance with the exira work provisIon of this offer.

AI summary The text outlines that any waiting time incurred by Siemens personnel between site access training and the initiation of work will be billed on a time and material basis according to the extra work provision of the offer.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →