N-1-aAppendix H - Proposed Tariffs (Large File - 21 MB)
4 passages
NOVA SCOTIA POWER INCORPORATED LARGE INDUSTRIAL TARIFF (2 000 kV.A or 1 800 kW, and Over) Rate Code 23 - ( 4) The Company reserves the right to have a separate service agreement, if in the opinion of the Company issues not specifically set...
AI summary This section of the Large Industrial Tariff (Rate Code 23) outlines the requirements for high-demand customers (2,000 kV.A or 1,800 kW and over). It establishes the Company's right to enter into separate service agreements for specific issues and mandates that customers must ensure their load does not compromise power supply system integrity. Specific technical factors for assessment include reliability, harmonics, voltage flicker, unbalance, and stability, which will be governed by written operating agreements.
SPECIAL CONDITIONS: - ( 1) The Company reserves the right to have a separate service agreement if in the opinion of the Company, issues not specifically set out herein must be addressed for the ongoing benefit of the Company and its custom...
AI summary The text outlines special conditions for power supply agreements, granting the Company the right to establish separate agreements for specific customer needs. It mandates that customers must ensure their load does not compromise power supply system integrity, with specific requirements to be defined in a written operating agreement. Key technical factors for assessing system integrity include reliability, harmonic levels, voltage flicker, unbalance, load rate of change, stability, and fault levels. Additionally, it specifies adjustments for transformer losses and transmission voltage metering.
EXTRA LARGE INDUSTRIAL INTERRUPTIBLE TARIFF With the exception of Planned Shutdown Periods, the annual market adjustment, load management initiatives and permanent alterations to production capacity, no changes will be permitted except for...
AI summary The document outlines the restrictions and permissions regarding the Extra Large Industrial Interruptible Tariff. It specifies that no changes to the tariff are permitted except for force majeure reasons or with the express permission of Nova Scotia Power Inc., excluding specific items like Planned Shutdown Periods, annual market adjustments, and load management initiatives. Additionally, the Company allows forward-looking monthly adjustments to the Tariff Demand (TD) for the first three months following initial subscription or after a previously described deviation.
SPECIAL CONDITIONS - 1. The Company reserves the right to have a separate service agreement if in the opinion of the Company, issues not specifically set out herein must be addressed for the ongoing benefit of the Company and its customers...
AI summary The document outlines special conditions for customers using the rate, emphasizing the preservation of power supply system integrity. It mandates that customers ensure their load does not cause issues such as voltage flicker, unbalance, or stability problems, with specific requirements to be defined in separate operating agreements. Additionally, it grants customers the option to enter into separate agreements with NSPI for special fuel purchase arrangements to influence variable energy costs within the rate formula, subject to UARB approval.
N-2-bRIR 76 - NSUARB to NSPI - REDACTED (Large File - 46 MB)
5 passages
Natural gas supply contract In Q4, 2005, Nova Scotia Power reached an agreement with its supplier on pricing for natural gas under an existing longterm natural gas purchase agreement. The contract- which began in 2000 and runs until 2010 -...
AI summary Nova Scotia Power reached a natural gas supply agreement in Q4 2005 following a period of arbitration regarding price redetermination for a contract running until 2010. The final agreed price was more favorable than the company's initial estimates, resulting in a $23.8 million ($14.7 million after-tax) fuel expense adjustment. Additionally, Nova Scotia Power received a net payment of $8.0 million ($5.0 million after-tax) from the supplier, which was recorded as other income.
Three months ended Year ended millions of dollars Fuel for generation and purchased power - 2003 December 31 December 31 $ 277.8 Lower net proceeds from resale of natural gas 32.0 Increased production 16.9 Decreased renewable production vo...
AI summary The text details the fuel costs for generation and purchased power for Nova Scotia Power from 2003 to 2005. It highlights a significant 2005 adjustment where a final agreement on natural gas pricing terms was reached following a period of arbitration. The final price was more favorable than NSPI's estimates, resulting in a $23.8 million fuel expense adjustment in Q4 2005. Additionally, NSPI received an $8.0 million net payment from its gas supplier, recorded as other income.
OTHER INC01\lE During 2005, Nova Scotia Power received a payment of $10.5 mi llion, less $2.5 million of associated costs, from a gas supplier as part of renegotiation of certain contractual matters.
AI summary The document notes that during 2005, Nova Scotia Power received a net payment of $8 million from a gas supplier. This payment resulted from the renegotiation of specific contractual matters, with the gross payment amount being $10.5 million and the associated costs totaling $2.5 million.
NATURAL GAS PRICE ADJUST1'\1ENT RECEIVABLE NSPI's existing long-term natural gas purchase agreement includes a price adjustment clause covering three years of natural gas purchases. The clause states that NSPI will pay for all gas purchase...
AI summary Nova Scotia Power Inc. (NSPI) is addressing a price adjustment receivable related to its long-term natural gas purchase agreement. The agreement includes a clause allowing for a price rebate on a portion of gas volumes to be settled in November 2007. Management has calculated a best estimate of this rebate based on contract specifications, actual pricing, and forward marketing pricing, subsequently recording the amount as a long-term receivable.
18. COMMITMENTS Emera had the following significant commitments at December 31 , 2005: - The Company has a comm itment to a th ird party, beginning in early 2004 for seven years, to outsource management of the Company's computer infrastruc...
AI summary The document outlines significant financial and operational commitments held by Emera and its subsidiaries (NSPI and Bangor Hydro) as of December 31, 2005. These include long-term contracts for computer infrastructure outsourcing, electricity and natural gas procurement from independent producers, transportation capacity on the Maritimes and Northeast Pipeline, and coal transportation for generation stations. Additionally, it details the management of a $1.1 billion defeasance securities portfolio and various operating leases and physical trading commitments for energy marketing.
N-40RIRs Attachment SEB-NSPI - 2a, pt. 1 (Large File - 22 MB)
17 passages
Service under this rate shall be for a minimum period of ten (10) years for new Consumers (initial service or any major addition thereto) and not less than one (1) year for other Consumers. After the initial term (whichever is applicable),...
AI summary The text outlines the minimum service terms for the rate, specifying a ten-year duration for new Consumers (including initial service or major additions) and a minimum of one year for other Consumers. Following these initial terms, the service agreement remains in effect until either party provides one year's written notice for termination.
TERM Contracts will be required for an initial period of not less than two (2) years and shall remain in effect thereafter until either party shall give the other at least twelve (12) months' written notice of the intention to discontinue...
AI summary The text outlines the contractual requirements for customers seeking service, specifying a minimum initial contract period of two years with a twelve-month notice period for termination. It clarifies that existing customers changing requirements do not need new initial contracts unless additional facilities are involved. Additionally, it describes the options for customers to transition between Standard Schedule L.P.S. and Open Access Distribution Schedule O.A.D.-L.P.S., and the conditions under which qualifying customers may elect to use a qualified Energy Service Provider.
TERM The customer shall contract for a de:furlte amount of electrical capacity in kilowatts which shall be sufficient to meet maximum requirements, but in no event shall the contract capacity be Jess than 1, 000 KW. Contracts will be reqll...
AI summary The text outlines the contractual terms for electrical capacity, specifying that customers must contract for a minimum of 1,000 KW to meet their maximum requirements. It establishes a minimum initial contract period of two years, with a one-year notice requirement for termination. Provisions are included for existing customers changing requirements and the Company's right to extend initial contract periods. Additionally, the Company is not obligated to supply capacity beyond the contracted amount without mutual agreement.
Special Terms and Conditions 1. For Customers taking transmission or primary service, Customer shall furnish, own, and maintain, at his own expense, the complete substation structure and equipment, including switches and protective equipme...
AI summary The text outlines the special terms and conditions for customers receiving transmission or primary service. It specifies that customers are responsible for owning and maintaining substation structures, equipment, and transformers at their own expense, while the Company provides and maintains metering equipment. The Company reserves the right to require customers to install protective equipment in cases of negligence or to enter into specific maintenance agreements. Additionally, the Company maintains the option to provide and maintain protective equipment under 'Standard Contract Rider No. 53-Excess Facilities.'
CONTRACT DEMAND The Company will require contracts to specifY the maximum demand to be delivered to the Customer which shall be the Contract Demand. Where the Customer can restrict on-peak demand to levels considerably below that of the Co...
AI summary The text defines the requirements for 'Contract Demand' in utility service agreements. It specifies that the Company requires contracts to establish the maximum demand to be delivered to a Customer. Additionally, it notes that if a Customer can significantly restrict their on-peak demand, the Company may enter into a separate contract for a limited On-Peak Contract Demand in addition to the standard Contract Demand.
CONTRACT PERIOD Each customer shall enter into a contract to purchase electricity from the Company for a minimum original term of one (1) year, and thereafter from year to year upon the condition that either party can terminate the contrac...
AI summary The text outlines the standard contract terms for customers purchasing electricity from the Company. It establishes a minimum original contract term of one year, with subsequent year-to-year renewals. Termination by either party requires at least 60 days' written notice following the initial term. The Company reserves the right to require longer initial terms if justified. Additionally, customers requesting early termination or amendments before the initial term expires are subject to early termination charges as defined in the Company's Service Regulations.
I. General Provisions: Contracts for interruptible power service will be accepted by the Company on the basis of successive contracts, and each contract shall specifY an interruptible, integrated demand of not more than 50,000 KW to be sub...
AI summary This section outlines the general provisions for interruptible power service contracts. The Company accepts successive contracts with an integrated demand limit of 50,000 KW per contract, capped at a total of 1,100,000 KW across all nonresidential schedules. Customers may opt to apply these provisions to specific submetered portions of their load. The Company reserves the right to conduct annual tests of the rider provisions with advance notice and may terminate continued service if a customer fails to perform satisfactorily during requested interruptions.
2. Definitions: Contract Demand: The Contract Demand is the maximum kilowatt demand which the Company shall be required to supply to the Customer. Interruptible Contract Demand: The Interruptible Contract Demand of not more than 50,000 KW...
AI summary This section provides formal definitions for terms used in the service agreement, specifically regarding demand management and interruptible power service. It defines Contract Demand, Interruptible Contract Demand, and Firm Contract Demand, establishing the parameters for electricity supply. Additionally, it defines Interruption Periods, Penalty Demand for exceeding firm limits during interruptions, and the specific 'Exposure Periods' for summer and winter months used to compute monthly credits for customers under Schedule OPT.
3. Control Notices and Limitations: The Customer shall be notified of all initiations of Interruption Periods at least thirty (30) minutes prior to such times, and the Customer shall fully comply with the Company's requests to reduce and m...
AI summary This section outlines the operational requirements and limitations for the RJDERIS(NC) Interruptible Power Service. It mandates that the Company provide customers with at least 30 minutes' notice before initiating an Interruption Period. Customers are required to maintain their load within the Firm Contract Demand during these periods. The Company is limited to 150 hours of interruptions annually, with a daily maximum of 10 hours unless a mutual agreement for extension is reached with the customer.
7. Contract Period: Contracts with interruptible load provisions shall be for a minimum original term of five (5) years and thereafter until terminated, by giving at least twelve (12) months' previous notice of such termination in writing,...
AI summary The text outlines the contractual terms for interruptible load provisions, specifying a minimum original term of five years with a 12-month notice period for termination. It establishes the Company's right to terminate a contract if a Customer fails to maintain load at or below the Firm Contract Demand during three or more Interruption Periods or violates other terms. Additionally, it mandates early termination charges for customers requesting amendments or termination before the initial term expires.
AVAILABILITY (South Carolina Only) A vail able to the individual customer. Service under this Schedule shall be used solely by the contracting Customer in a single enterprise, located entirely on a single, contiguous premise. This Schedule...
AI summary The text outlines the specific availability and usage restrictions for a power supply schedule applicable only to customers in South Carolina. It specifies that the service is for a single enterprise on a single contiguous premise and explicitly excludes residential customers, auxiliary services, and resale or exchange of power. Additionally, it clarifies that the Company's obligation to supply power is contingent upon securing necessary rights-of-way, privileges, franchises, and permits, and the Company is not liable for delays caused by failure to secure these rights.
CONTRACT DEMAND The Company wiii require contracts to specify the maximum demand to be delivered to the Customer which shall be the Contract Demand. Where the Customer can restrict on-peak demand to levels considerably below that of the Co...
AI summary The text outlines the requirements for Contract Demand agreements between the Company and its customers. It specifies that contracts must define the maximum demand to be delivered. Additionally, it allows for the possibility of contracting for a limited On-Peak Contract Demand if the customer is able to restrict their on-peak demand to levels significantly lower than their total Contract Demand.
CONTRACT PERIOD Each customer shall enter into a contract to purchase electricity from the Company for a minimum original term of one (I) year, and thereafter from year to year upon the condition that either party can terminate the contrac...
AI summary The text outlines the standard contractual terms for customers purchasing electricity from the Company. It specifies a minimum original contract term of one year, with provisions for year-to-year renewal or termination by either party provided 60 days' written notice is given. The Company reserves the right to require longer terms if justified. Additionally, it establishes that customers requesting early termination or amendments before the initial term expires are subject to early termination charges as defined in the Company's Service Regulations.
I . General Provisions: Contracts for interruptible power service will be accepted by the Company on the basis of successive contracts, and each contract shall specify an interruptible, integrated demand of not more than 50,000 KW to be su...
AI summary The text outlines the general provisions for interruptible power service contracts. The Company will accept successive contracts with an integrated demand limit of 50,000 KW per contract, capped at a total of 1,100,000 KW across all nonresidential schedules. Customers may opt to apply the rider only to submetered portions of their load. The Company reserves the right to conduct annual tests of the rider's provisions with advance notice, and continued service is contingent upon satisfactory customer performance during requested interruptions.
2. Definitions: Contract Demand: The Contract Demand is the maximum kilowatt demand which the Company shall be required to supply to the Customer. Interruptible Contract Demand: The Interruptible Contract Demand of not more than 50,000 KW...
AI summary This section provides formal definitions for terms related to an Interruptible Power Service agreement. It defines the various components of Contract Demand, distinguishing between Firm Contract Demand (guaranteed availability) and Interruptible Contract Demand (subject to outages). It also establishes the parameters for Interruption Periods, Penalty Demand for exceeding firm limits during those periods, and the specific weekday peak windows designated as Exposure Periods for calculating monthly credits.
3. Control Notices and Limitations: The Customer shall be notified of all initiations oflnterruption Periods at least thirty (30) minutes prior to such times, and the Customer shall fully comply with the Company's requests to reduce and ma...
AI summary This section outlines the operational requirements and limitations for Interruptible Power Service (RJDER IS). It specifies that the Company must provide the Customer with at least 30 minutes' notice before the initiation and termination of Interruption Periods. Customers are required to maintain their load below the Firm Contract Demand during these periods. The Company's ability to invoke these periods is capped at 150 hours annually and 10 hours per calendar day, unless otherwise mutually agreed upon.
7. Contract Period: Contracts with interruptible load provisions shall be for a minimum original term of five (5) years and thereafter until terminated, by giving at least twelve (12) months' previous notice of such termination in V.'Titin...
AI summary This section outlines the contractual terms for interruptible load provisions, specifying a minimum original term of five years with a 12-month notice period for termination. It establishes the Company's right to terminate the contract if the Customer fails to maintain load at or below the Firm Contract Demand during three or more Interruption Periods or violates other Rider terms. Additionally, it notes that Customers requesting early termination before the initial term expires are subject to early termination charges.
N-40RIRs Attachment SEB-NSPI - 2a, pt. 4 (Large File - 19 MB)
17 passages
LARGE POWER SERVICE RATE SCHEDULE "P" (Continued) TERM The initial term of Electric Service Agreement for service under this schedule shall be 5 years. Agreement shall remain in force thereafter until twelve months after written notice of...
AI summary This document excerpt outlines the terms and general provisions for the Large Power Service Rate Schedule 'P' for Allegheny Power (Monongahela Power Company). It specifies an initial five-year agreement term, notice requirements for cancellation, and constraints on changing agreement capacity. It also notes that customers are responsible for providing protective equipment and that the schedule primarily applies to customers purchasing their entire electrical requirements from the company.
CONTRACT PERIOD The Contract Period shall not be less than one year.
AI summary The document specifies the minimum duration for the Contract Period, stating that it must be at least one year long.
1. FIRM DEMAND The Firm Demand shall be the kW of demand specified in the Service Agreement to which Customer shall reduce his requirement at the time specified by Company. Company at all times will endeavor to make available to Customer t...
AI summary The text defines 'Firm Demand' as the specific kilowatt (kW) demand capacity agreed upon in a Service Agreement. It stipulates that the Customer is responsible for reducing their requirement at the time designated by the Company. Additionally, it establishes that the Company will make every effort to ensure the specified Firm Demand is available to the Customer at all times.
CONTRACT PERIOD The Contract Period shall be on a monthly basis for the first 12 months service is provided under this Rider and can be terminated by either party by giving written notice to the other party. Following the initial 12 months...
AI summary The text outlines the terms of the Contract Period for a specific Rider, establishing a monthly service basis for the first 12 months with a termination option for both parties. After the initial year, the contract automatically extends for five years, followed by successive two-year extensions unless a 60-day written notice is provided. It also specifies the rules for adjusting the difference between Contract Demand and Firm Demand, limiting reductions to 20% at specific annual intervals.
CONTRACT PERIOD The Contract Period shall not be Jess than one year.
AI summary The document specifies the minimum duration for the Contract Period, stating that it must not be less than one year.
1. FIRMDEMAND The Firm Demand shall be the kW of demand specified in the Service Agreement to which Customer shall reduce his requirement at the time specified by Company. Company at all times will endeavor to make available to Customer th...
AI summary The document defines 'Firm Demand' as the specific kilowatt (kW) capacity of demand specified in a Customer's Service Agreement. It establishes that the Customer is required to reduce their demand requirements at times designated by the Company. Additionally, it outlines the Company's commitment to make the specified Firm Demand available to the Customer at all times.
CONTRACT PERIOD The Contract Period shall be on a monthly basis for the first 12 months service is provided under this Rider and can be terminated by either party by giving written notice to the other party. Following the initial 12 months...
AI summary The text outlines the contractual terms for a specific Rider, establishing a monthly service basis for the first 12 months with a termination option for either party. After the initial year, the contract automatically renews for five years, followed by successive two-year extensions, unless terminated with 60 days' notice. It also specifies rules for adjusting the difference between Contract Demand and Firm Demand, limiting annual reductions to 20% of the difference specified in the Service Agreement.
Special Contract PURPOSE: The purpose of this Schedule is to describe generally the terms and conditions provided by the Company pursuant to a Special Contract approved by the Idaho Public Utility Commission.
AI summary This section introduces a Special Contract between the Company and an unnamed party. It specifies that the purpose of the Schedule is to outline the general terms and conditions provided by the Company under the framework of a Special Contract that has been approved by the Idaho Public Utility Commission.
Monsanto Company Special Contract Dated January 1, 2003
AI summary The document identifies a Special Contract between the utility and the Monsanto Company, dated January 1, 2003. The text serves as a heading and reference to a specific contractual agreement governing the relationship or service terms for the entity.
Availability This schedule is available for firm and interruptible retail service of electric power and energy delivered for the operations of Monsanto Company's facilities located at Soda Springs, Idaho, as provided in the Electric Servic...
AI summary The text specifies the availability of electric power and energy for the Monsanto Company's facilities in Soda Springs, Idaho. It confirms that the service is provided for both firm and interruptible retail service, as governed by the Electric Service Agreement between the two parties.
TERM OF CONTRACT: Company may require the Customer to sign a written contract which shall have a term of not less than one year.
AI summary The document specifies a contractual requirement regarding the term of service agreements between the Company and its customers. It states that the Company may require customers to enter into a written contract with a minimum duration of one year.
CONDITION OF SERVICE: The eligibility of affected Customers for the rate credit specified in this tariff is conditional upon the Utility's continuing its Washington exchange, as provided by the Pacific Northwest electric Power Planning and...
AI summary The document specifies that the eligibility of customers for a particular rate credit is contingent upon the Utility's continued participation in the Washington exchange. This participation is governed by the Pacific Northwest electric Power Planning and Conservation Act (Public Law 96-501) and specific contracts (01PB-12229 and 01PB-10854) between the Company and the Bonneville Power Administration.
Force Majeure The Company shall not be subject to any liability or damages for inability to provide service, and the Customer shall not be subject to any liability or damage for such inability to receive service, to the extent that such in...
AI summary This section of the tariff defines the 'Force Majeure' provisions for the Large General Service Transmission Delivery (Time of Use - 1,000 KW and Over) schedule. It stipulates that neither the Company nor the Customer shall be liable for damages or service failures caused by events beyond their control as defined in Rule 4, Part II, Section C. During such events, minimum Billing Demands are waived, though specific term minimum guarantees for special facilities extension costs may still apply. The party claiming Force Majeure is required to make diligent efforts to remedy the situation.
Term of Contract Company may require the Customer to sign a written contract with a minimum term of one year.
AI summary The document specifies the contractual requirements between the Company and the Customer, stating that the Company may require the Customer to enter into a written agreement with a minimum duration of one year.
TERM OF CONTRACT The contract terms will depend on the conditions of service. No contract shall be written for a period less than five (5) years. A separate contract shall be written for each meter at each location.
AI summary The document specifies the contractual requirements for service agreements, stating that contract terms are contingent upon the specific conditions of service. It establishes a minimum contract duration of five years and mandates that a unique, separate contract must be drafted for every individual meter at each distinct location.
CONDITIONS OF SERVICE Customer may choose to have Total kW or some portion thereof designated as Curtailable kW. The amount of Total kW not designated as Firm kW shall constitute Customer's Curtailable kW. Customer's service must be equipp...
AI summary The text outlines the conditions of service for the Experimental Curtailable Service Rider, which allows customers to designate a portion of their Total kW as 'Curtailable kW.' Customers are responsible for installing the necessary equipment and metering to reduce load during curtailment events. The Company may request curtailment to maintain service integrity, avoid system peaks, or manage load. The Company provides notice requirements for both non-emergency (30 minutes) and emergency (10 minutes) curtailments via telephonic communication.
TERM OF CONTRACT This Rider is being offered as an experimental service and may be withdrawn by the Company following written notice to each Customer served under the Rider given at least one year prior to such withdrawal. The obligation o...
AI summary The document outlines the contractual terms for an experimental service offered under a specific Rider. It specifies that the Company reserves the right to withdraw the service with at least one year's written notice to all customers. Conversely, customers are required to commit to a minimum initial term of one year and must provide at least one year's written notice should they wish to cancel the service.
N-40RIRs Attachment SEB-NSPI - 2a, pt. 2 (Large File - 15 MB)
14 passages
TERMS AND CONDITIONS The Company's Rules and Regulations apply to service under this schedule. The Term of Contract under this schedule shall be not less than ten (10) years. Should a customer be eligible and EPEC elects to provide service...
AI summary The text outlines the terms and conditions for a specific service schedule, establishing that the Company's Rules and Regulations apply. It specifies a minimum contract term of ten years and provides a hierarchy of authority: if a customer is eligible for service under Rate Schedule No. 27 in conjunction with this schedule, the provisions of Rate Schedule No. 27 and the customer's Contract for Power Service will take precedence in the event of any inconsistencies.
DETERMINATION OF DEMAND AND ENERGY Maximum demand will consist of both firm and interruptible demand, and will be defined as the highest thirty (30) minute average kilowatt load determined by measurement. The measured demand will be adjust...
AI summary The document outlines the methodology for determining and billing maximum demand and energy for industrial customers under a power service contract. It defines maximum demand as the highest 30-minute average kilowatt load, adjusted for metering. It establishes specific rules for calculating 'Total Billing Demand' based on on-peak (10:00 A.M. to 8:00 P.M. MST, weekdays) and off-peak periods. Furthermore, it differentiates between Firm and Interruptible Power/Energy for billing purposes, ensuring that Firm Power Billing Demand does not fall below the Minimum Firm Contract Capacity.
CONTRACT FOR SERVICE A Contract for Power Service ("Contract") must be executed between EPEC and the Customer prior to taking service under this rate schedule. The Contract shall establish the amount of the Customer's demand that shall be...
AI summary The document outlines the requirements for a Contract for Power Service between Eastern Power Corporation (EPEC) and a customer. It stipulates that a contract must be executed before service begins to define firm versus interruptible demand. The agreement establishes a three-year initial term with automatic annual renewals, requiring one year's notice for cancellation. Furthermore, the contract's specified firm power demand and minimum firm contract capacity take precedence over any conflicting terms in previous agreements.
SCHEDULING PROCEDURES The Company and the Customer shall agree upon detailed procedures for requesting, providing notice of, and implementing interruptions, and shall set forth the same in the Contract for Power Service.
AI summary The document establishes the requirement for the Company and the Customer to mutually agree on specific procedures regarding power service interruptions. These procedures must include protocols for requesting, providing notice of, and implementing interruptions, and must be formally documented within the Contract for Power Service.
GENERAL CONDITIONS EPEC may make intentional interruptions at any time and from time to time, at EPEC's sole discretion, for up to 400 hours in any calendar year. However, EPEC may not interrupt the customer (1) due solely to differences i...
AI summary The text outlines the general conditions for Interruptible Power Service provided by Eastern Power Corporation (EPEC). It specifies that EPEC may perform intentional interruptions for up to 400 hours annually, provided the interruptions are not solely due to marginal cost differences or non-firm off-system sales. Requirements for customer notice are established: at least 4 hours for non-emergency situations and a minimum of 30 minutes for emergencies. It also defines 'emergency conditions' and the calculation for counting interruption hours.
NON-COMPLIANCE Customer understands that service under this rate is contingent upon Customers' complete and timely compliance with EPEC's requests for interruption. If, at any time, Customer fails in whole or in part to implement and maint...
AI summary The text outlines the non-compliance penalties for customers enrolled in EPEC's Interruptible Power Service. Customers must comply with load reduction requests or face damages equal to 20 percent of their current month's bill for each day of non-compliance. Repeated violations (three within 12 months) allow EPEC to terminate the service immediately. However, customers are exempt from interruption if aggregate limits are exceeded, and EPEC provides a 12-month grace period for reductions reaching at least 90% of the request.
OTHER TERMS AND CONDITIONS During the term of the Customers' Contract for Power Service, Customer may not engage in self-generation other than periodic operation of any existing self-generation facilities, not to exceed a total capacity of...
AI summary The document outlines specific terms and conditions for a Power Service Contract. It restricts customers from engaging in new self-generation, permitting only the periodic operation of existing facilities with a capacity limit of 10,000 KW. Additionally, it specifies that interruptible sales under the current rate schedule are classified as non-firm sales, meaning they are excluded from cost-of-service allocations in any Eastern Power Corporation (EPEC) rate cases.
9.7. CONTRACT PERIOD (MT) Not less than five years. No term contract will be required for Customer who, through Federal Statute, rule or regulation, is prohibited from entering into Company's standard Agreement for Electric Service and who...
AI summary The document specifies the contract period requirements for electric service in the Maryland Territory (MT). It establishes a minimum contract term of five years for standard customers. However, an exception is made for customers who are prohibited by Federal Statute, rules, or regulations from entering into the Company's standard Agreement for Electric Service, provided they meet the Company's requirements for advancing the costs of connection facilities.
41.2.1. FIRM CONTRACT DEMAND Firm Contract Demand is the demand (kW) that the Customer intends to exclude from interruptions. The Firm Contract Demand shall be specified in the Customer's Agreement for Interruptible Service. The Customer m...
AI summary The document defines 'Firm Contract Demand' as the specific amount of power (kW) that a customer intends to keep available and exclude from interruptions. This demand must be explicitly stated in the customer's Agreement for Interruptible Service. Additionally, it outlines a provision allowing customers to modify their Firm Contract Demand once during the contract period, provided they submit a written notice to the company at least 60 days in advance.
41.2.4. RESTRICTED HOURS Restricted hours are those hours for which the Customer has been notified in accordance with Section 41.3. to take only its Firm Contract Demand.
AI summary The document defines 'Restricted hours' as specific periods during which a Customer is required, following notification in accordance with Section 41.3, to limit its power consumption to only its Firm Contract Demand.
41.3. NOTIFICATION PROVISIONS The Company will notify the Customer or designated representative of the Customer via a mutually acceptable method by 4:30 p.m. that on the following day the Company may call for interruption ("Day-Ahead Notic...
AI summary This section outlines the notification requirements for the Company when requesting power interruptions from a Customer. It establishes a 'Day-Ahead Notice' requirement, provided by 4:30 p.m. the day before a planned interruption, which must include an estimated start time. It specifies that if no interruption occurs following such a notice, hours will be imputed as if an interruption had occurred. Additionally, it provides for a 30-minute advance notice during peak load, capacity shortage, or emergency conditions.
The Agreement for Interruptible Service shall be for a minimum period of one year and a maximum of five years at the Customer's option, and shall be automatically renewed for successive terms equal in length to the initial term until termi...
AI summary The text outlines the contractual terms for the Optional Interruptible Service Rider. It specifies a minimum term of one year and a maximum of five years, with automatic renewals for successive terms of equal length. Termination requires at least three months' advance written notice. Additionally, it clarifies that if the Rider is terminated under Section 41.1, the Interruptible Service Agreement ends concurrently. Customers changing Rate Schedules while initiating the service are not required to contract for more than one year under the new schedule.
TERM OF CONTRACT: - The contract term is one year. The customer is required to remain on the OPEC tariff for a period of twelve months from the contract date. The contract will be automatically renewed on the anniversary date of the contra...
AI summary The document specifies the contractual terms for a customer on the OPEC tariff. It establishes a mandatory one-year commitment period starting from the contract date. The agreement includes an automatic annual renewal provision, which can be terminated by either party provided that a 30-day written notice is submitted to the Company.
SCHEDULE: "DPEC-1" The state of the state of the state of the state of the state of the state of the state of the state of the state of the state of the state of the state of the state of the state of the state of the state of the state of...
AI summary The provided text is a fragment of a regulatory document, specifically Schedule 'DPEC-1', which appears to be part of a filing related to contract terms. It contains a repetitive placeholder or error in the header and a table footer indicating it is page 3 of 3 for a document with bills rendered for March 2002. The section concludes with a heading regarding penalties for contract termination.
N-40RIRs Attachment SEB-NSPI - 2a, pt. 5 (Large File - 20 MB)
4 passages
following. For Customers with firm and interruptible service measured through the same meter: Upon interruption, Customer's measured total load is not greater than 110% of the contracted firm demand. For Customers with only interruptible s...
AI summary The text outlines the operational limitations and contractual terms for an experimental Interruptible Power Service (IPS) Rider. It specifies maximum load limits for customers with firm and interruptible services, detailing penalties for equipment tampering or bypassing. Additionally, it establishes a 4-year initial contract term, provides provisions for customers to convert interruptible demand to firm demand with specific notice periods (6 months in the first year, 2 years thereafter), and defines the 6-month notice requirement for service cancellation.
Conversion Q ualifying customers may convert existing amount~ of VPI, LIP, LFP, or InteJTuptible RTP to like amounts of FPI. Cu rrent VPI customers less than 5 !vJW who convert VPI loads w FPI will no longer retain granclfathered eligibili...
AI summary The text outlines the rules and limitations for customers wishing to convert existing electricity load products—specifically VPI, LIP, LFP, or Interruptible RTP—to Flat Price Interruptible (FPI) amounts. It specifies that customers with less than 5 kW of VPI load will lose grandfathered eligibility upon conversion. Furthermore, it prohibits the conversion of firm power to FPI until existing contract obligations are met and mandates that FPI cannot be mixed with other interruptible products.
XII. TERM OF CONTRACT The contract shall be open order unless (a) standby, maintenance or parallel operation service is provided, or (b) the Customer or the Company requests a written contract. In such cases, the term of contract for the p...
AI summary This section outlines the contract terms for electricity purchase under the specified schedule. Contracts are generally open-order unless specific conditions are met, such as the provision of standby, maintenance, or parallel operation services, or a formal written request from either the Customer or the Company. In these instances, the contract term must be mutually agreed upon for a minimum duration of one year. During this minimum term, customers may be billed under Unbundled Rate Schedule GS-4U, if applicable.
VII. TERM OF CONTRACT The term of contract under this schedule shall be such as may be mutually agreed upon , but for not less than one year.
AI summary This section specifies the contractual duration for the schedule, stating that the term of the contract is subject to mutual agreement between the parties. However, it establishes a minimum mandatory duration of at least one year.
N-40RIRs Attachment SEB-NSPI - 2a, pt. 3 (Large File - 23 MB)
14 passages
Terms of Contract. Contracts under this tariff will be made for an initial period of not less than two years and shall remain in effect thereafter until either party shall give at least one year's written notice to the other of the intenti...
AI summary This section outlines the standard terms of contract for services provided under the tariff. Contracts are established for a minimum initial period of two years, with a requirement for one year's written notice for termination. The Company maintains the right to mandate longer initial contract periods when new facilities are required. Additionally, the Company is not obligated to supply capacity beyond the contracted amount unless mutually agreed upon by both parties.
Conditions of Service. - 1. The Company reserves the right to curtail service to the customer at any time and for such period of time that in the Company's sole judgement the operation of its system requires curtailment of customer's servi...
AI summary The text outlines the Conditions of Service for interruptible power supply, specifying the Company's rights to curtail service for system operations. It establishes minimum availability requirements for contract capacity (145 hours weekly and 630 hours monthly), except during emergencies. Customers are required to respond to curtailment requests within ten minutes and are responsible for maintaining substations. It also details options for auxiliary switching and billing for non-interruptible service.
Terms of Contract. The Company reserves the right to limit the total contract capacity for all customers served under this tariff to 100,000 kVA. (Cont'd on Sheet No. 14.3) ISSUED BY COULTER R. BOYLE, III VICE PRESIDENT FORT WAYNE, INDIANA...
AI summary The document outlines the terms of contract for a specific electric service tariff, noting that the Company reserves the right to limit the total contract capacity to 100,000 kVA for all customers served under this tariff. The document was issued by Coulter R. Boyle, III of Atlantic Power under the authority of the Indiana Utility Regulatory Commission and became effective on December 23, 1997.
TARIFF I.R.P. (Interruptible Power) (Cont'd from Sheet No. 14.2) The customer shall contract for capacity sufficient to meet normal maximum interruptible power requirements, but in no event will the amount contracted for be less than 10,00...
AI summary The document outlines the contractual terms for the Interruptible Power (I.R.P.) tariff. Customers must contract for capacity between 10,000 kVA and 50,000 kVA to meet normal maximum requirements. If demand exceeds the contracted capacity, the Company may notify the customer to reduce demand or interrupt service. Initial contracts must last at least two years, with a one-year notice period for termination. The Company reserves the right to require longer initial contract periods if new facilities are necessary.
Special Terms and Conditions. ISSUED BY JOHN R. SAMPSON VICE PRESIDENT FORT WAYNE, INDIANA This tariff is subject to the Company's Terms and Conditions of Service. A customer's plant is considered as one or more buildings which are served...
AI summary The document outlines the special terms and conditions for industrial and power customers. It defines a customer's plant as one or more buildings served by a single electrical distribution system. It grants the Company the authority to connect circuits to different points on a customer's system if the load size requires delivery over multiple circuits. Additionally, it specifies that customers with cogeneration or small power production facilities must use the COGEN/SPP Tariff or enter into a special agreement with the Company.
ISSUED UNDER AUTHORITY OF THE INDIANA UTILITY REGULATORY COMMISSION DATED AUGUST 23, 2006 IN CAUSE NO. 38702-FAC57 1/97 Transmission voltage customer - The customer owns, leases, or otherwise bears financial responsibility for the distribu...
AI summary The document outlines the terms and conditions for transmission voltage service provided by Kansas City Power & Light Company. It specifies that customers must bear financial responsibility for distribution substations and must enter into special contracts for standby, breakdown, or supplementary services. These contracts must meet specific technical and safety requirements, with interconnection costs assessed on a nondiscriminatory basis. The text also includes administrative headers and signatures for the issuance of the schedule under the Indiana Utility Regulatory Commission's authority.
TERM OF CONTRACT Service will be furnished under this schedule only under contract for a fixed term of not less than 5 years, and for yearly periods thereafter until terminated by either party giving written notice to the other party 90 da...
AI summary The text outlines the contract terms for providing services under a specific schedule. It establishes a minimum fixed contract term of 5 years, with subsequent yearly periods. Termination requires a 90-day written notice from either party. However, the Company reserves the right to mandate a longer fixed term and extended termination notice periods if necessitated by the specific requirements of the customer's service.
TERM OF CONTRACT The minimum original contract period shall be one year and thereafter until terminated by giving at least 6 months previous written notice, but Company may require that contract be executed for a longer initial term when d...
AI summary The text specifies the standard terms for a contract between the Company and a customer. It establishes a minimum original contract period of one year, with a requirement for at least six months' written notice for termination. However, the Company reserves the right to mandate a longer initial contract term based on specific conditions, such as the size of the load.
SPECIAL TERMS AND CONDJTTONS This tariff is subject to the Company's Terms and Conditions of Service. This tariff is also available to customers having other sources of energy who desire to purchase standby or back-up service from the Comp...
AI summary This section outlines the special terms and conditions for customers seeking standby or back-up service from the Company while maintaining other energy sources. Customers must contract for a maximum demand of at least 3,000 KW, with the Company not obligated to supply excess demand. Billing for such service is based on the highest demand recorded over the current and previous two billing periods. Additionally, the Company reserves the right to connect circuits to different points on a customer's distribution system if the load size necessitates multiple circuits.
TERM OF CONTRACT Contracts under this rate shall be for an initial term of one year, remaining in effect from month to month thereafter until terminated by notice of either party to the other.
AI summary The document specifies the contractual terms for the applicable rate, establishing an initial contract duration of one year. Following this initial period, the contract automatically remains in effect on a month-to-month basis. Either party involved in the contract retains the right to terminate the agreement by providing notice to the other party.
CONTRACT OPTION Customer may, at Customer's option, contract with Company to curtail seNice upon notification by the Company. Requests for curtailment shall not exceed five hundred (500) hours per year nor shall any single request for curt...
AI summary The text outlines the contractual terms for a curtailable service option between a customer and a utility company. It specifies the parameters for load curtailment, including annual hour limits (500 hours), minimum and maximum durations per day (30 minutes to 14 hours), and notice requirements (10 minutes). It details three distinct contractual methods for measuring compliance and calculating monthly credits based on firm demand, contracted curtailable load, or the option to purchase power blocks during curtailment events.
SERVICE FACILITIES: Service will be furnished at the nominal voltage of 7600/13,200 volts, three phase, four-wire, or at such higher voltage as may be available on the Company's system at the location served. The delivery voltage will be s...
AI summary The text specifies the technical requirements for service facilities. It establishes that service is typically provided at a nominal voltage of 7600/13,200 volts, three-phase, four-wire, or higher depending on system availability. It notes that the specific delivery voltage will be defined in the service contract and clarifies that customers are responsible for providing all necessary equipment, such as transformers and circuit breakers, required to receive service at the specified voltage.
TERM OF CONTRACT: The obligations hereunder of the customer and the Company shall commence on the date electric service is first rendered to the customer and shall continue until December 31 of that year and for an initial term of three ye...
AI summary The text outlines the contractual terms for electric service between the Company and the customer. The agreement commences on the date service is first rendered and lasts for an initial three-year term, followed by annual repeating periods. Either party may terminate the contract by providing at least one year's written notice before the end of the initial or any subsequent one-year term. The Company must provide a formal letter to the customer within thirty days of service commencement to establish the specific dates.
NTHLY RATE: Charges for service hereunder will be at the prices specified in the price schedules to which this rider applies, subject to the following additions and modifications: Curtailment Credit: Annual Credit per kW of curtailable loa...
AI summary The text outlines the terms for a Curtailment Credit under Rider No. 57 for Electric General Service and Large General Service. It specifies two annual credit options per kW of curtailable load based on contract length: $39.44/kW for 3-year contracts (subject to performance consistency) and $32.93/kW for year-to-year contracts. It also details the customer's responsibility to reimburse the Company for capacity purchases necessitated by a failure to curtail load as required by the Mid-Continent Area Power Pool (MAPP) Agreement, with certain waivers allowed for equipment failures.