1.5 CONTRACTOR USE OF PREMISES (IF AWARD IS ISSUED) - .1 Unrestricted use of Contractor Site until Substantial Performance. - .2 Limit use of premises for Work to allow: - .1 Work by other Contractors. - .1 The Contractor is cautioned that...
AI summary This section outlines the contractor's responsibilities regarding the use of premises during construction. It emphasizes coordination with other contractors, protection of existing work, and maintaining the condition of existing infrastructure post-construction.
1.6 SUBMITTALS - .1 Samples/Shop Drawings - .1 Submit to Owner copies of manufacturer's mill test data. - .2 Submit samples of GCL to the Owner at least 4 weeks prior to delivery. - .3 Submit to the Owner certificates, including test resul...
AI summary This section outlines the requirements for submitting samples, shop drawings, and revised plans to the Owner and Engineer. Contractors must provide manufacturer's mill test data, GCL samples, and certificates with test results at least four weeks before delivery. Shop drawings must be submitted for approval, and revised plans must be submitted if previously accepted plans do not meet specifications.