Topic/Matter Intersection

Topic:"Cost Considerations" in M03091

Matter: CI# 33942 - P-510 - NSPI WO - Coon Pond Pipeline Replacement - $2,075,549
5 passages 2 documents

Cost Considerations across all matters →

N-1Redacted Work Order 4/30/2010 4 passages
33942-H555 30-Apr-10 p. p. 1
33942-H555 30-Apr-10 . I - Account Original Revision I Current Revision Variance 001 - Hydro Req. Labour 3,000 8,574 5,574 001 - Reqular Labour (No AO) - 85 85 011 - Travel Expense 75 200 125. 012 - Materials 375,000 013 - Power Prod Contr...

AI summary The document presents a comparison between original and current revisions of various account items, highlighting significant variances in costs such as labour, materials, consulting, and administrative overheads, with total costs increasing substantially from 629,936 to 2,075,549.

27-Apr-10 33942 p. p. 12
27-Apr-10 33942 Alternative After Tax WACC PV of EVA / NPV Rank IRR Disc Pay Α Pipe replacement Vs. Do nothing 6.55% 605,634 1 9.68% 19.4 years В Band and Pipe Replacement Vs. Do nothing 6.55% -24,258 3 6.41% 0.0 years c Band/Pipe Replacem...

AI summary The document presents a comparison of alternative pipe replacement strategies with the option of doing nothing, using metrics such as After Tax WACC, PV of EVA/NPV Rank, IRR, and Discounted Payback. The alternatives include full pipe replacement, band and pipe replacement, and a band/pipe replacement program, with varying financial outcomes.

Pipe replacement Vs. Do nothing p. p. 12
Year Operating Costs Capital Contraction of the Contraction of the Contraction of the Contraction of the Contraction of the Contraction of the Contraction of the Contraction of the Contraction of the Contraction of the Contraction of the C...

AI summary The text appears to be a table or data structure related to the costs and capital expenditures associated with pipe replacement versus doing nothing. However, the content is incomplete and appears to be truncated or corrupted, making it difficult to extract meaningful information.

Cost Centre 440 440-St.Margaret's Hydro System Budget Version 2008 11101 Forecast p. p. 19
Cost Centre 440 440-St.Margaret's Hydro System Budget Version 2008 11101 Forecast Acct Actv Account Activity Forecast Amount Amount Variance 094 ./ 094 - Interest Capitalized 8,971 0 8,971 095 005/ 095-Hydro Regular Labour AO 005 Indirect...

AI summary The document presents a budget forecast for the St. Margaret's Hydro System under Cost Centre 440 for the year 2008, including various line items such as interest capitalized, labour costs, materials, and consulting expenses, with a total forecast cost of $629,936.

N-3Responses to Second Set of Information Requests 7/28/2010 1 passage
COON POND PIPELINE REPLACEMENT Summary of Alternatives p. p. 3
Year Total Revenue Operating Costs (90,000.0) (95,000.0) (36,900.0) (98,838.0) (100,814.8) (102,831.1) (104,887.7) (106,985.4) (109,125.1) (111,307.6) (113,533.8) (115,804.5) (118,120.6) (120,483.0) (122,892.6) (125,350.5) (127,857.5) (130...

AI summary The document provides a summary of the Coon Pond Pipeline Replacement project, presenting financial figures such as total revenue and operating costs across multiple years. These figures indicate a steady increase in costs over time, which may be relevant to discussions about infrastructure planning and long-term financial projections.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →