N-1Redacted Work Order 4/30/2010
4 passages
33942-H555 30-Apr-10 . I - Account Original Revision I Current Revision Variance 001 - Hydro Req. Labour 3,000 8,574 5,574 001 - Reqular Labour (No AO) - 85 85 011 - Travel Expense 75 200 125. 012 - Materials 375,000 013 - Power Prod Contr...
AI summary The document presents a comparison between original and current revisions of various account items, highlighting significant variances in costs such as labour, materials, consulting, and administrative overheads, with total costs increasing substantially from 629,936 to 2,075,549.
27-Apr-10 33942 Alternative After Tax WACC PV of EVA / NPV Rank IRR Disc Pay Α Pipe replacement Vs. Do nothing 6.55% 605,634 1 9.68% 19.4 years В Band and Pipe Replacement Vs. Do nothing 6.55% -24,258 3 6.41% 0.0 years c Band/Pipe Replacem...
AI summary The document presents a comparison of alternative pipe replacement strategies with the option of doing nothing, using metrics such as After Tax WACC, PV of EVA/NPV Rank, IRR, and Discounted Payback. The alternatives include full pipe replacement, band and pipe replacement, and a band/pipe replacement program, with varying financial outcomes.
Year Operating Costs Capital Contraction of the Contraction of the Contraction of the Contraction of the Contraction of the Contraction of the Contraction of the Contraction of the Contraction of the Contraction of the Contraction of the C...
AI summary The text appears to be a table or data structure related to the costs and capital expenditures associated with pipe replacement versus doing nothing. However, the content is incomplete and appears to be truncated or corrupted, making it difficult to extract meaningful information.
Cost Centre 440 440-St.Margaret's Hydro System Budget Version 2008 11101 Forecast Acct Actv Account Activity Forecast Amount Amount Variance 094 ./ 094 - Interest Capitalized 8,971 0 8,971 095 005/ 095-Hydro Regular Labour AO 005 Indirect...
AI summary The document presents a budget forecast for the St. Margaret's Hydro System under Cost Centre 440 for the year 2008, including various line items such as interest capitalized, labour costs, materials, and consulting expenses, with a total forecast cost of $629,936.