Topic/Matter Intersection

Topic:"Cost Considerations" in M12521

Matter: Nova Scotia Power Inc. - Application for 2026 DSM Cost Recovery Rider (DCRR)
7 passages 6 documents

Cost Considerations across all matters →

N-1Application 1 passage
2026 DSM Rider Appendix C has been filed electronically. p. p. 18
2026 DSM Rider Appendix C has been filed electronically. RATE SCHEDULES DSM BA ¢/kWh 0.010 0.015 0.005 43.602% Subtotal 0.646 0.646 0.104 0.000% SCRR ¢/kWh 0.091 0.091 0.000 0.000% Fuel-related in aggregate ¢/kWh 8.621 8.621 0.000 0.000% N...

AI summary The 2026 DSM Rider Appendix C has been filed electronically, outlining various rate schedules and associated charges, including DSM BA, SCRR, FAM AA, and FAM BA. The data includes rates per kWh, percentages, and subtotals for different time periods and categories.

N-1-(i)Appendix A-1 - Redacted 1 passage
COLUMN Α В С D EF G
(1 )2026-2027 GRA Appendix 12 A-C, Section 5.9 DSM Rider COLUMN Α В С D EF G Н ı J K L М N O P Q 18 General Property Plant 143,498 143,498 0 0 -$75,508 $75,508 0 $67,989 $75,508 $ - 19 Total Plant in Service 2,235,203 2,235,203 0 0 -$1,176...

AI summary This table from Appendix 12 A-C, Section 5.9 DSM Rider, outlines financial details related to General Property Plant and Total Plant in Service, including values, changes, and percentages. It references the 2026-2026 GRA and Proposed 2026 COSS Exhibit 2b.

N-1-(ii)Appendix A-2 - Redacted 1 passage
-
- TDA IIIICICSI Out cutations on vote ıme Variance nterest Rate through May 31, 2024 Interest Rate through M 1ay 31, 2025 6.65% (NSPI WACC) ] nterest Rate changed in June 2024 Interest Rate changed i (NSPI WACC) nterest Rate changed in Jul...

AI summary The text presents a table with interest rates and monthly interest calculations for various categories, including Residential, Small General, General Demand, Large General, Small Industrial, Medium Industrial, Large Industrial, and Jnmetered. The data spans from January 2025 to December 2025 and references the NSPI WACC.

101433Board Decision Letter 1 passage
M12521 – Nova Scotia Power Inc. Application for 2026 Demand Side Management Cost Recovery Rider p. p. 0
M12521 – Nova Scotia Power Inc. Application for 2026 Demand Side Management Cost Recovery Rider On September 29, 2025, Nova Scotia Power Inc. (NS Power) requested an extension to file its 2026 Demand Side Management Cost Recovery Rider (DC...

AI summary Nova Scotia Power Inc. (NS Power) filed an application for the 2026 Demand Side Management Cost Recovery Rider (DCRR), seeking approval to recover DSM costs from municipal electric utilities. This follows a revised cost-of-service allocation methodology that removes the 25% allocation of DSM costs to system benefits, arguing it was arbitrary and lacked justification.

99951NSEB (NSPI) IR 1 to 6 2 passages
Request IR-4:
Request IR-4: - Appendix A-1, tab Data Inputs-Alloc & Amount, please identify the source of the values for 2026. - a) Did NS Power estimate the spending by rate class for 2026 using the past estimated PCR values or the actuals? Please prov...

AI summary Request IR-4 seeks clarification on the source of 2026 data inputs and whether NS Power used past estimated PCR values or actuals to estimate spending by rate class for 2026.

Request IR-5:
Request IR-5: - Please explain why the Board approved values for the weighted average cost of capital (WACC) - are not applied in Appendix A-2 in keeping with the associated effective dates from M10431, - M11563 and M11990.

AI summary The text requests an explanation for why the Board approved values for the weighted average cost of capital (WACC) are not applied in Appendix A-2, despite the effective dates from referenced matters.

101433Board Decision Letter 1 passage
M12521 – Nova Scotia Power Inc. Application for 2026 Demand Side Management Cost Recovery Rider p. p. 0
M12521 – Nova Scotia Power Inc. Application for 2026 Demand Side Management Cost Recovery Rider On September 29, 2025, Nova Scotia Power Inc. (NS Power) requested an extension to file its 2026 Demand Side Management Cost Recovery Rider (DC...

AI summary Nova Scotia Power Inc. (NS Power) filed an application for the 2026 Demand Side Management Cost Recovery Rider (DCRR) to take effect on January 1, 2026, following an extension granted by the Nova Scotia Energy Board. NS Power also requested approval to recover DSM costs from individual MEUs as budgeted by EfficiencyOne. The DCRR charges are based on a revised cost-of-service allocation methodology that removes the 25% allocation of DSM costs to system benefits.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →