Contingency Statement Contingency for this project has been determined using a combination of internal subject matter expert (professional engineers, capital planner and Power Line Technicians) previous experience and site-specific knowled...
AI summary The contingency for the project is set at 15% based on internal expertise, site-specific knowledge, and non-binding guidelines, classified as a Class 3 estimate. Risks covered include equipment replacement, environmental mitigation, and additional labor requirements.
7.1 Estimates Below are preliminary capital cost estimates by year for capital items associated with the alternatives discussed in Sections 6.2 and 6.3. The economic analysis in Section 7.2 will determine the NPV of these alternatives. Tab...
AI summary Preliminary capital cost estimates by year are presented for alternatives discussed in Sections 6.2 and 6.3. These estimates will inform an economic analysis in Section 7.2 to determine the NPV of the alternatives, focusing on capital expenditures and cost considerations.