Topic/Matter Intersection

Topic:"Cost Considerations" in M12797

Matter: NSPI DRO Appeal - Billing Issues - Marilyn Ells
1 passage 1 document

Cost Considerations across all matters →

101724Exhibit E-3 NSPI Response to Appeal (confidential) 1 passage
ings North onstituency Office p. p. 17
of winter was $20.31 per day, bemperatured wer similar on a daily basis for both periods of time. NSP Energy advisor gave me cost figures for ist pump and 2rd pump for a 2 month. Inling period. Smaller one 12,000 BTU ($50,000 larger one, 1...

AI summary The text discusses the cost of heating pumps, providing figures for two different pumps (12,000 BTU and 18,000 BTU) over a two-month period, with the smaller one costing approximately $50,000.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →