Topic:"Cost Considerations" in M13015

Matter: Nova Scotia Power Inc. - CI C0053295 - L5004 Kearney Lake Structure Replacement - $6,836,784 (ATO)
2 passages 2 documents

Cost Considerations across all matters →

N-1CI C0053295 - L5004 Kearney Lake Structure Replacement - Application 1 passage
Preamble p. pp. 9-10
APPENDIX A Statement of General Conditions Symbols and Terms Used on Borehole and Test Pit Records Borehole Records Grain Size Analyses Results Figure No. 1, Borehole Location Plan Preliminary Cost Estimate

AI summary This document provides an appendix with a statement of general conditions, including symbols and terms used on borehole and test pit records, and contains a preliminary cost estimate with a figure showing borehole location plans.

103498NSEB (NSPI) IR-1 to IR-4 1 passage
Request IR-3:
Request IR-3: - On page 2, the application notes that "While NS Power did investigate an alternative transmission route to avoid a complex water crossing, this alternative was not viable, and the best option remained the installation of th...

AI summary The document includes a request for detailed cost estimates and analysis regarding the replacement of 69-kV transmission line structures, including considerations of alternative structures, environmental permitting, and long-term service life implications.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →