8.0 COST ESTIMATE
p. pp. 24-25
8.0 COST ESTIMATE The following high-level, non-binding, cost estimates include the costs associated with the proposed solution to supply the MLS Spaceport site via 24C-442 from the Town of Canso. The customer is responsible for the actual...
AI summary The document outlines high-level, non-binding cost estimates for supplying the MLS Spaceport site via 24C-442 from the Town of Canso, with the customer responsible for design and construction costs.