Reason for Variance / Over Expenditure / Final Costing
p. p. 1
Reason for Variance / Over Expenditure / Final Costing 14812214 The variance in the project estimate is a result of the following: Removal of the blowdown tank and drains from the project scope. The replacement of the blowdown tank and dra...
AI summary The project estimate variance is due to the removal of the blowdown tank and drains from the scope, reduced SSH tube replacements and alignment, and reduced boiler door replacements, resulting in a total reduction of $750K in the project estimate.