HomeCost DeferralM12883Evidence
Topic/Matter Intersection

Topic:"Cost Deferral" in M12883

Matter: Nova Scotia Power Inc. - Affiliate Code of Conduct Report for 2025
4 passages 1 document

Cost Deferral across all matters →

N-1Affiliate Code of Conduct 2025 Report - Redacted 4 passages
Appendix C 2025 Utility Performance Report p. p. 100
Appendix C 2025 Utility Performance Report Category Measure 2025 2024 2023 Notes May-25 3267654 Nova Scotia Limited (Terminal Road) 9S-10-R 9S M&A Services - Apr 25- IC AR Trade - 3267654 Nova Scotia Ltd $865 Sale Pricing Exception the CAM...

AI summary This section of the 2025 Utility Performance Report outlines several Pricing Exceptions related to M&A Services and Utility Services, referencing the Cost Allocation Manual (CAM) and directing readers to Appendix D9 and D1 for further details. These exceptions involve specific transactions and sales associated with Nova Scotia Limited.

(Y/N) Reference p. p. 100
(Y/N) Reference Period Company InterCo ID Tag Pricing Exception Line Description Amount Purchase/Sale FMV/FAC/Pricing Exception Explanation Aug-25 Tampa Electric 6P-80 6P TECO Audit charges Labour ($1,556) Purchase FAC Sep-25 Tampa Electri...

AI summary The document outlines various financial transactions and adjustments made by companies such as Tampa Electric and Emera Inc. during specific periods, including audit charges, incentive payouts, and corporate allocations. These transactions are categorized under Fair and Appropriate Cost (FAC) and include details on non-regulated adjustments and affiliate transactions.

Date Nova Scotia Power Energy Marketing Inc. (NSPEMI) p. p. 126
Date Nova Scotia Power Energy Marketing Inc. (NSPEMI) Jan-25 Nova Scotia Power Energy Marketing Inc. (INSPEMI) 1S-25 1S NG Sale Sale Pricing Exception Jan-25 Nova Scotia Power Maritime Link (NSPML) 5068 5S-120 5S CCO NSPML Preventative Mtc...

AI summary The document outlines several sales and pricing exceptions related to Nova Scotia Power Maritime Link (NSPML) and Nova Scotia Power Energy Marketing Inc. (NSPEMI), including costs determined based on the Cost Allocation Manual (CAM) and specific sections related to Corporate Overhead, Non-productive Rate, and M&A Services.

2025 Affiliate Code of Conduct Report Appendix H Page 20 of 35 REDACTED (CONFIDENTIAL INFORMATION REMOVED) p. p. 126
2025 Affiliate Code of Conduct Report Appendix H Page 20 of 35 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Code Sections NS Power Employee Guidance period. The cost of personnel will include the Labour Overhead Application Rate. All costs...

AI summary The document outlines guidelines for allocating personnel costs to clients, emphasizing direct charging where possible, followed by allocation based on specific cost drivers. If neither is feasible, general allocation factors may be used. Corporate overhead and non-productive rates are referenced for cost calculations.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →