1 Request IR-1:
1 Request IR-1: 2 In its Order for matter M12179, the Board Ordered that: 3 … 4 2. The difference between the rates for Small General, General and Large General service 5 classes and the full rates for those classes noted in Schedule B her...

AI summary The Board ordered the Town of Lunenburg to accrue the difference between rates for various service classes with interest. The current application does not include deferred amounts or interest from a previous order, prompting questions about tracking, balances, and recovery plans.

20 Response:
20 Response: - 21 a) The Utility has been tracking the deferral amounts, by rate classes.

AI summary The Utility has been tracking deferral amounts by rate classes as part of the proceeding.

- 22 i. The deferral amounts by rate classes to June 30, 2026 are as follows:
- 22 i. The deferral amounts by rate classes to June 30, 2026 are as follows: Small General $6,409.74 General $76,536.74 Large General $45,765.92 Total to June 30, 2026 $128,712.40 23

AI summary The document provides a summary of deferral amounts by rate classes up to June 30, 2026, with specific figures for Small General, General, and Large General rate classes, totaling $128,712.40.

Preamble
24 The Utility intends to calculate interest by rate class at the end of deferral period. 25 26 The Utility has not included the recovery of any of the deferral in this application as TOLEU wishes 27 to elect to wait until April 1, 2027 be...

AI summary The Utility plans to calculate interest by rate class at the end of the deferral period and has not included the recovery of any deferral in this application. TOLEU intends to wait until April 1, 2027, to recover deferred revenue, allowing for a phased-in rate increase. Full recovery cannot be determined until all billings are completed, with July 2026 billing still pending.

102549NSEB (LEU) IR-1 to IR-2 1 passage
_______________________________________ Crystal Henwood, Clerk of the Board
_______________________________________ Crystal Henwood, Clerk of the Board 1 Request IR-1: 2 In its Order for matter M12179, the Board Ordered that: 3 … 4 5 6 2. The difference between the rates for Small General, General and Large Genera...

AI summary The Board's Order for matter M12179 directed the Town of Lunenburg to accrue differences between rate classes by deferred recovery with interest. The current application does not include the deferred amount and interest in the new rates, prompting questions about tracking, balances, and recovery plans.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →