B-1Proposed Tariffs - Amended March 2, 2011 2/28/2011
4 passages
13 Q. WHAT HAVE YOU ASSUMED ABOUT CHP PLANTS' CAPACITY FACTOR? 14 A. As the tariff will require the biomass application to be combined heat and power, there 15 are capacity factors involved with both the heat and the power generation. For...
AI summary The respondent assumes CHP plants operate at 85% power availability and 60% heat extraction, with sensitivity analysis showing higher COMFIT rates needed as steam capacity factors drop. Efficiency decreases with lower steam use, but including fuel costs at 52% efficiency aligns with CHP regulations.
20 Q. WHAT HAVE YOU ASSUMED ABOUT THE INSTALLED COST OF THE PROJECT? 21 A. We assume an "Equipment & Installation" cost of $3.9 million dollars, and a total project 22 cost of $4,447 per kW, including interest during construction and all f...
AI summary The respondent assumes an 'Equipment & Installation' cost of $3.9 million and a total project cost of $4,447 per kW, citing data from Vermont FIT proceedings (2009), Hatch Acres (2005), and CanmetEnergy (2007). Costs include financing and construction interest, with references to hydro projects in Vermont and Canada.
11 Q. WHAT HAVE YOU ASSUMED ABOUT THE INSTALLED COST OF THE PROJECT? 12 A. We have assumed total project costs of $5 million, or $10,076 per kW, based on 13 information from studies, from several projects proceeding outside of Nova Scotia...
AI summary The respondent assumes total project costs of $5 million or $10,076 per kW, citing external studies and provincial tidal developers. Tidal energy costs vary widely due to technological immaturity, with estimates ranging from $5,100 to $18,100 per kW across different phases and projects, including Fundy Tidal, Champlain Tidal Energy, and Encurrent.
Interconnection Information Provided by NSPI - 1. List of On-Site facilities (costs refer to tables, A, B & C below) - A. For projects greater than 100 kW the typical NSPI facilities on site are as follows: - 15 or 25 kV Class Recloser - 1...
AI summary NSPI details interconnection facilities and costs for projects of varying sizes, noting that larger projects (over 100 kW) require more extensive infrastructure with estimated costs ranging from $45,000 to $120,000, while smaller projects (under 50 kW) have lower costs depending on generation type.
B-4Redacted Direct Testimony and Exhibits of Paul Chernick - on behalf of CA 3/17/2011
3 passages
6 Q: What do you conclude from these comparisons? 7 A: I have three observations. First, the $139/MWh proposed by Synapse for large 8 COMFIT wind projects is much higher than the actual prices in the contracts for 9 recent RFP wind project...
AI summary The response highlights three key findings: the proposed $139/MWh price for large COMFIT wind projects is higher than recent contract prices; NSPI has rejected lower-priced projects; and no economies of scale are observed across different unit sizes, with costs remaining stable.
r Business , Cambridge Energy Research Associates, 1987, pp. 63–72. - "The Relevance of Regulatory Review of Utility Planning Prudence in Major Power Supply Decisions," in Current Issues Challenging the Regulatory Process , Center for Publ...
AI summary The text lists various publications and articles related to utility regulation, energy economics, and conservation programs. These works discuss topics such as regulatory review, power plant performance, cost-effectiveness of conservation programs, and rate-making methodologies.
; cost-effectiveness of oil displacement; nuclear economics. Joint testimony with S.C. Geller. 7. MDPU 19845; Boston Edison Time-of-Use Rate Case; Massachusetts Attorney General; December 4 1979. Critique of utility marginal cost study and...
AI summary The text outlines various regulatory proceedings and expert testimonies related to energy policy, including rate cases, nuclear power cost reviews, and demand-side management. Key topics include rate design, cost-effectiveness, and energy forecasting, with involvement from the Massachusetts Attorney General and other entities.